Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹1.6 L
Closing Date
30 Sept 2026, 5:00 pm3d left
Superintending Engineer, RWSS Division,Kataka
O/O Superintending Engineer, RWSS Division, Kataka
Retrofitting for RPWS to Niali (Z- III) under R.W.SS. Division, Kataka
2026_RWSS_140458_2
rwssctc-02/2026-27
National Competitive Bid
Civil Works - Water Works
Percentage
270 days
Kataka
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.6 L
Yes
9 Sept 2026
9 Sept 2026
1 Oct 2026
9 Sept 2026
30 Sept 2026
9 Sept 2026
9 Sept 2026 - 29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof Pump House building , construction of Compound wall for Pump House , construction of approach road alongwith site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etc along with required fittigs & specials and construction of valve chamber,stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bliching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & external Electrification etc. as per suppllied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-5 and the BOQ in (Annexure-A to H) of Village URALI. All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN & all construction should be guided by supplied drawings and as per direction of Engineer in Charge .
The work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m and residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system . | 1 | Whole Job | 1,02,82,285.7 | ₹1,02,82,285.7 |
| 1.02 | Design, drawing, constuction errection, testing and commissioning of 50000 ltr. capacity 15 mtr staging RCC Elevated storage reservoir with RCC stair case as per detailed scope of work & technical specification mentioned in Section - 5 and in Annexure - I including testing of soil and vatting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge. (Pile Foundation) | 1 | Whole Job | 43,00,000 | ₹43,00,000 |
| 1.03 | The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem.The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN & technical specification mentioned in Section-5. | 1 | Whole Job | 7,29,114.29 | ₹7,29,114.29 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
dtcn3.pdf
Tender Documents • 6.92 MB
BOQ_608773.xls
BOQ • 0.34 MB
Scan_20260911_134231.pdf
PDF • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .