| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62,702.96Accepted-Finance | ₹62,702.96 | L1 | Accepted-Finance Techno-commercially accepted. |
| 2 | L2₹72,484.62+₹9,781.66 (15.6%)Rejected-Finance AT PROFESSOR COLONY P O MAITHON DIST DHANBAD 828207 | DHANBAD | JHARKHAND | 828207 | ₹72,484.62+₹9,781.66 (15.6%) | L2 | Rejected-Finance Not L1. |
| 3 | L3₹73,001.12+₹10,298.16 (16.4%)Rejected-Finance | ₹73,001.12+₹10,298.16 (16.4%) | L3 | Rejected-Finance Not L1. |
| 4 | L4₹75,084.13+₹12,381.17 (19.7%)Rejected-Finance | ₹75,084.13+₹12,381.17 (19.7%) | L4 | Rejected-Finance Not L1. |
| 5 | L5₹87,784.14+₹25,081.18 (40.0%)Rejected-Finance | ₹87,784.14+₹25,081.18 (40.0%) | L5 | Rejected-Finance Not L1. |
Tender Value
₹1.3 L
EMD Value
₹1,600
Closing Date
20 Feb 2026, 5:00 pmClosed
GM Kusunda Area
Kusunda Area Office
Repairing and Maintenance of Muktidham Mandir at GKKC under Kusunda Area
2026_BCCL_352501_1
BCCL/KUS.A.6/CIV.ENGG/ eNIT/25-26/20
Open Tender
Civil Works - Others
Percentage
20 days
Kusunda Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
2 Jun 2026
6 Feb 2026
23 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
6 Feb 2026 - 11 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing and Maintenance of Muktidham Mandir at GKKC under Kusunda Area | |||||
| 1.01 | Grading roof for water proofing treatment with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 2.26 | m3 | 6,202.55 | ₹14,017.76 |
| 1.02 | Painting top of roofs with bitumen of approved quality @ 17kg per 10 sqm impregnated with a coat of coarse sand at 60 cudm per 10 sqm, including cleaning the slab surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil complete.With residual type petroleum bitumen of grade VG -10 | 59.5 | m2 | 106 | ₹6,307 |
| 1.03 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in foundation and plinth upto plinth level in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.34 | m3 | 5,002.04 | ₹11,704.77 |
| 1.04 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 0.68 | m3 | 5,483.5 | ₹3,728.78 |
| 1.05 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 77.98 | m2 | 222 | ₹17,311.56 |
| 1.06 | 6 mm cement plaster of mix :1:3 (1 cement : 3 fine sand) | 11.9 | m2 | 198.2 | ₹2,358.58 |
| 1.07 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate | 28 | m2 | 442.65 | ₹12,394.2 |
| 1.08 | Distempering with 1st quality acrylic distember (Ready mix) having VOC content less than 50 grams/ litre of approved brand and manufacture to give an even shade : Old work (one or more coats) | 243.7 | m2 | 46.25 | ₹11,271.13 |
| 1.09 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work | 330.05 | m2 | 68.3 | ₹22,542.42 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_365291.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.51 MB
BOQ_365291.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .