Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹9.9 L+₹50,540 (5.37%)Rejected-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L2 | Rejected-AOC 1st lowest | |
| 3 | L3₹10.9 L+₹1.5 L (15.5%)Rejected-Finance KAVIKKUNNEL H KUNNACKAL P O MUVATTUPUZHA | MUVATTUPUZHA | KERALA | L3 | Rejected-Finance 3rd lowest |
Tender Value
₹12.9 L
EMD Value
₹32,350
Closing Date
15 Apr 2020, 6:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer,Additional Irrigation Sub Division, Aluva Pin 683101
Desilting work to Kattukandam puzha
2020_Irrig_352892_1
AEE/AISD/31/ET/2019-20/S Tender
Open Tender
Civil Works - Others
Item Rate
120 days
Alangadu
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,277
online
₹32,350
Yes
30 Jun 2020
30 Mar 2020
21 Apr 2020
30 Mar 2020
15 Apr 2020
30 Mar 2020
Amount
SCHEME 1 Desilting of Puzha
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site
SCHEME -2 Desilting of puzha
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site
SCHEME 3 Desilting of puzha
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site
SCHEME 4 Desilting of puzha
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site
SCHEME 5 Desilting of puzha
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site
SCHEME 6 Desilting of Puzha
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site
SCHEME 7 Desilting of Puzha
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site
SCHEME 8 Desilting of Puzha
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site
SCHEME 9 Desilting of Puzha
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. complete as per the direction of the departmental officer at site
DAISY JOSE
George Kutty
Bidder Name
DAISY JOSE
George Kutty
P.C TOMY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_495968.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .