Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 CrAccepted-AOC | ₹5.0 Cr | 1 | Accepted-AOC Lowest quoted substantially responsive bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Quoted amount is higher than lowest quoted substantially responsive bidder |
| 3 | Rejected-Technical N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | - | - | Rejected-Technical Quoted amount is higher than lowest quoted substantially responsive bidder |
| Sl No | Description | Qty | Unit | Kishur Konwar L1 | ARKITECHNO Consultants (India) Pvt. Ltd. L3 | AM DATA LAB PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00LOT 2: INCLUDES THE MORIGAON, GUWAHATI WEST & BISWANATH SUBPROJECT AREAS | ||||||
| 1.01 | Sediment monitoring: SS sampling for concentration measurement in mainstream.
3 Transect * 3 Locations *3 depths * 13 times * 3 years | 1,053 | No. of Samples | 2,350 ₹24.7 L | 8,000 ₹84.2 L | 2,000 ₹21.1 L |
| 1.02 | Sediment monitoring: SS sampling for concentration measurement in tributaries.
10 Transects * 3 Locations *3 depths * 13 times * 3 years | 3,510 | No. of Samples | 2,350 ₹82.5 L | 8,000 ₹2.8 Cr | 1,000 ₹35.1 L |
| 1.03 | Sediment monitoring: SS sampling for particle size distribution measurement in mainstream
3 Transects *3 locations * 3 depths *3 times * 3 years | 243 | No. of Samples | 4,800 ₹11.7 L | 8,700 ₹21.1 L | 2,000 ₹4.9 L |
| 1.04 | Sediment monitoring: SS sampling for particle size distribution measurement in tributaries.
10Transects * 3 locations * 3 depths * 3 times * 3 years | 810 | No. of Samples | 4,800 ₹38.9 L | 8,400 ₹68.0 L | 2,000 ₹16.2 L |
| 1.05 | Sediment monitoring: Bed sediment sampling for particle size distribution in mainstream.
5 Transects * 3 location * 2 times * 3 years | 90 | No. of Samples | 4,800 ₹4.3 L | 8,700 ₹7.8 L | 2,650 ₹2.4 L |
| 1.06 | Sediment monitoring: Bed sediment sampling for particle size distribution in tributaries.
10 Transects * 3 Location * 2 times * 3 years | 180 | No. of Samples | 4,800 ₹8.6 L | 8,700 ₹15.7 L | 2,000 ₹3.6 L |
| 1.07 | River survey: Cross-section measurements (SBES + Total Station) in mainstream
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years)
347 km (total length of 36 cross sections) * 3 years | 1,041 | Km | 5,000 ₹52.0 L | 5,000 ₹52.0 L | 10,000 ₹1.0 Cr |
| 1.08 | River survey: Cross-section measurements (SBES + Total Station) in tributaries
(Specification: Each cross section to be surveyed annually during the receding flood season for 3 years)
3 km (total length of 10 cross sections) * 3 years | 9 | Km | 5,000 ₹45,000 | 5,000 ₹45,000 | 9,000 ₹81,000 |
| 1.09 | River survey: Near-field bathymetric/ topographic measurement
(Specification: At each location Near-field bathymetric/ topographic measurement shall cover length of ongoing civil works + one km extra coverage considering 500m upstream and 500m downstream; survey shall take place three times in year for 3 years)
[33 km (length of civil works at 18 locations) + 18 km (1 km in each site)] *300 m transect / at 50 m interval * 3 times in a year * 3 years | 2,754 | Km | 5,000 ₹1.4 Cr | 4,100 ₹1.1 Cr | 11,000 ₹3.0 Cr |
Tender Value
Refer Docs
Closing Date
4 Jul 2025, 2:00 pmClosed
Chief Executive Officer, FREMAA
4th Floor of Assam Water Center (AWC), Near Basistha Chariali, Guwahati-781029
Conducting River Surveys (Bathymetry, Flow, Sediment measurement) Lot 2 Morigaon and Guwahati West
2025_WREAP_44887_1
568378/1306B
Limited
Miscellaneous Services
Assam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
Conference Hall FREMAA
13 Jan 2026
20 Jun 2025
4 Jul 2025
20 Jun 2025
4 Jul 2025
25 Jun 2025
20 Jun 2025 - 24 Jun 2025
23 Jun 2025
Amount
LOT 2: INCLUDES THE MORIGAON, GUWAHATI WEST & BISWANATH SUBPROJECT AREAS
Sediment monitoring: SS sampling for concentration measurement in mainstream. 3 Transect * 3 Locations *3 depths * 13 times * 3 years
Sediment monitoring: SS sampling for concentration measurement in tributaries. 10 Transects * 3 Locations *3 depths * 13 times * 3 years
Sediment monitoring: SS sampling for particle size distribution measurement in mainstream 3 Transects *3 locations * 3 depths *3 times * 3 years
Sediment monitoring: SS sampling for particle size distribution measurement in tributaries. 10Transects * 3 locations * 3 depths * 3 times * 3 years
Sediment monitoring: Bed sediment sampling for particle size distribution in mainstream. 5 Transects * 3 location * 2 times * 3 years
Sediment monitoring: Bed sediment sampling for particle size distribution in tributaries. 10 Transects * 3 Location * 2 times * 3 years
River survey: Cross-section measurements (SBES + Total Station) in mainstream (Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 347 km (total length of 36 cross sections) * 3 years
River survey: Cross-section measurements (SBES + Total Station) in tributaries (Specification: Each cross section to be surveyed annually during the receding flood season for 3 years) 3 km (total length of 10 cross sections) * 3 years
River survey: Near-field bathymetric/ topographic measurement (Specification: At each location Near-field bathymetric/ topographic measurement shall cover length of ongoing civil works + one km extra coverage considering 500m upstream and 500m downstream; survey shall take place three times in year for 3 years) [33 km (length of civil works at 18 locations) + 18 km (1 km in each site)] *300 m transect / at 50 m interval * 3 times in a year * 3 years
Hydraulics: Discharge, velocity and water level without sediment measurement in mainstream (Specification: Each cross section to be surveyed 3 times annually during June, August, and October for 3 years) 100 km (total length of 10 cross sections) *3 times a year * 3 year
Hydraulics: Discharge, velocity and water level with sediment measurement in mainstream (Specification: Each cross section to be surveyed 13 times a year for 3 years) 18 km (length of 3 cross sections) * 13 times a year * 3 years
Hydraulics: Discharge, velocity and water level with sediment measurement in tributaries (Specification: Each cross section to be surveyed 13 times a year for 3 years) 3 km (length of 10 cross sections) * 13 times a year * 3 years
Float tracking in mainstream 4 tracks (35 km + 34 km + 40 km + 57 km) * 2 times a year * 3 years
Site (underwater work) monitoring surveys: MBES measurement (Specification: At each location MBES measurement shall cover the length of ongoing civil works; survey shall take place annually around October month for 3 years) 33 km (length of civil works at 18 locations) *0.15 km * 3 years
AM DATA LAB PRIVATE LIMITED (BID ID -271141)
ARKITECHNO Consultants (India) Pvt. Ltd. (BID ID -270961)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_71237.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid