| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC PATTIKKADAN HOUSE VELLUVANGAD P O 676521 | MALAPPURAM | KERALA | 676521 | ₹6.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.8 L+₹34,719.79 (5.34%)Rejected-AOC MANHAKKANDAN HOUSE CHATHANGOTTUPURAM PO PORUR 679328 | MALAPPURAM | KERALA | 679328 | ₹6.8 L+₹34,719.79 (5.34%) | L2 | Rejected-AOC L2 |
Tender Value
₹7.8 L
EMD Value
₹19,600
Closing Date
4 Jun 2026, 4:00 pmClosed
Executive Engineer ,PMU Nilambur
Executive Engineer ,PMU Nilambur,near Kodathipadi ,Minivydyuthi Bhavanam Nilambur-679329
HT RECONDUCTORING AT AKKARPPURAM BRANCH LINE USING 120SQMM ABC(Dyuthi-2)
2026_KSEB_850914_1
PMU/NBR/E-TENDER NO 03/26-27/DTD 19.05.2026
Open Tender
Electrical Works
Percentage
120 days
MELATTUR
Please refer Tender Documents
8 documents required · 8 mandatory
₹1,888
₹19,600
7 Jul 2026
26 May 2026
8 Jun 2026
26 May 2026
4 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Transporting poles by hired vehicle to a distance upto 5km and carrying
upto 4 numbers of poles excluding loading& unloading charges. | 16 | Trip | 3,142.26 | ₹50,276.16 |
| 1.02 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size | 62 | Each | 164.67 | ₹10,209.54 |
| 1.03 | Labour charges for loading HT PSC pole from the stacking place and
unloading the same at work site (transportation by any vehicle). | 60 | No | 762.14 | ₹45,728.4 |
| 1.04 | Fitting and erecting 9M PSC pole with out V cross arm,pin insulator and f
clamp for AB Cable stringing | 57 | Each | 2,193 | ₹1,25,001 |
| 1.05 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays,
strut etc. attached thereon and stacking the same. | 5 | No | 1,796.09 | ₹8,980.45 |
| 1.06 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT
pole including dismantling existing cross arm and insulators, refitting the
same on the new pole, binding etc. complete. | 12 | No | 879.23 | ₹10,550.76 |
| - | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT
pole including dismantling existing cross arm and insulators, refitting the
same on the new pole, binding etc. complete. | 60 | No | 1,778.32 | ₹1,06,699.2 |
| - | Fitting and providing one Strut using HT PSC pole including digging and
back filling pit in ordinary soil. | 3 | No | 3,056.91 | ₹9,170.73 |
| - | Fitting and providing one HT Stay for 11kV pole, including digging and
back filling pit in ordinary soil. | 40 | No | 1,373.73 | ₹54,949.2 |
| - | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard
Laterite. | 10 | No | 868.77 | ₹8,687.7 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1440831.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
doc3.pdf
Tender Documents • 0.41 MB
BOQ_1440831.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .