| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.7 LAccepted-Finance | ₹38.7 L | L1 | Accepted-Finance BOQ FOUND IN ORDER |
| 2 | L2₹40.9 LAccepted-Finance | ₹40.9 L | L2 | Accepted-Finance BOQ FOUND IN ORDER |
| 3 | L3₹41.9 LAccepted-Finance | ₹41.9 L | L3 | Accepted-Finance BOQ FOUND IN ORDER |
| Sl No | Description | Qty | Unit | M/s Mool Raj Ramesh Chander L2 | KANWAL KUMAR GUPTA L1 | Sanjeev Kumar Verma L3 |
|---|---|---|---|---|---|---|
| 1.00 | Taking down old unsv roof treatment including PCC padding if any, plastering, removing existing bitumen felt treatment including brushing, cleaning top surface of roof slab, brooming etc incl disposing off debris from MoD land complete all as specified and directed. | 200 | Sqm | 10 ₹2,000 | 10 ₹2,000 | 5 ₹1,000 Lowest |
| 2.00 | Rendering 15 mm thick in cement and sand mortar 1:3 on roof surfaces with mixing of water proofing admixture as per manufacturer's instruction including finishing the surface even and fair to receive roof treatment, complete all as specified and as directed.
Note:- Supply of Water proofing compound shall not be measured & paid seperately. | 200 | Sqm | 180 ₹36,000 | 100 ₹20,000 Lowest | 150 ₹30,000 |
| 3.00 | Roof treatment :- Water proofing treatment to RCC roof slab including parapet as under :- (a) 1st Course : Apply a coat of bituminous primer conforming to IS-3384@ 0.40 Kg /Sqm on prepared surface of plaster and after drying of primer.
(b) 2nd Course : Applying evenly a tack coat of industrial bitumen grade 85/25 conforming to IS-702 at rate of 1.2 Kg/Sqm.
(c) 3rd Course : APP (Atactic Polypropylene) modified polymeric membrane, 5 layered, 3 mm thick weight not less than 3.0 Kg/Sqm with 160 Grams/Sqm non woven polyester made at centre core reinforced laid with 75 mm side overlap and 150 mm end overlap, membrane has to be laid with LPG torch and overlap sealed and finished neat, all joints.
(d) 4th Course : Apply a coat of hot blown 85/25 grade bitumen conforming to IS-702 @ 1.2 Kg/sqm over membrane and dusted with dry sand @ 0.50 to 1 Kg/sqm.
(i) On Non-accesible roof : After providing (a) to (c) provide two coats of aluminium paint as per manufacturer instructions. to be measured and paid separately under relevant item of BOQ (ii) Coved fillet in PCC 1:2:4 type B0 (using 12.5 mm graded crushed stone aggregate) of required radius 75mm shall be provided at the junction of roof and vertical surface such as parapet wall/mumty around opening and treatment mentioned above shall be applied followed by a cement plaster 20mm thick in cement mortar(1:6).
Note : (i) Roof treatment work shall be carried out through approved manufacturers only or through their authorised personal only. | 200 | Sqm | 560 ₹1,12,000 Lowest | 750 ₹1,50,000 | 700 ₹1,40,000 |
| 4.00 | Cleaning and removing all scale and dirt, etc, from tanks and from mouths of circulating pipes etc. of PVC tank capacity 250ltr to 500 Itr complete all as directed.
Note: All T & P required for complete the job included in quoted rate.
"Note:-
(i) Date of cleaning will also be mentioned after cleaning with synthetic enamel paint
(ii)_Discounnecting existing tank and reconnecting/ refixing in position should be deemed in quoted rate" | 24 | Each | 150 ₹3,600 | 200 ₹4,800 | 40 ₹960 Lowest |
| 5.00 | Cleaning and removing all scale and dirt, etc, from tanks and from mouths
of circulating pipes etc. of PVC tank capacity above 500ltr to 1000 Itr complete all as directed.
Note: All T & P required for complete the job included in quoted rate.
(i) Date of cleaning will also be mentioned after cleaning with synthetic enamel paint
(ii)_Discounnecting existing tank and reconnecting/ refixing in position should be deemed in quoted rate" | 15 | Each | 150 ₹2,250 | 200 ₹3,000 | 50 ₹750 Lowest |
| 6.00 | Sunken Floor treatment :- Providing and laying of water proofing treatment to sunken portion by applying cement slurry mixed with acrylic based polymer modified cementitious composite compound of make as approved including demolition and filling of sunken floor.
(a) First layer of slurry of cement @ 0.488 Kg/Sqm mixed with acrylic based polymer modified cementitious composite compound @0.253 Kg/Sqm. This layer allowed to air cure for 4 Hours.
(b) Second layer of slurry of cement @ 0.242 Kg/Sqm mixed with acrylic based polymer modified cementitious composite compound @ 0.125 Kg/ Sqm his layer allowed to air cure for 4 Hours.
Note :- (a). Concrete for sunken slabs shall be mixed with WP compounds as per manufacturer instructions before carrying out water proofing treatment the sunken shall be tested with water for 48 hrs for any leakage/dampeness is seen in ceiling below, then treatment is again carried out to RCC slab and it is again tested (Water proofing compound rate shall not be paid separately). (b). 50mm thick PCC at the bottom of slab and slope shall be 1:20 toward the corner of outer wall and GI pipe of 50mm dia (Med grade) be inserted at corner projecting outside 20 cm .
(c). 15 mm plaster mixed with WP Compound shall be provided while concrete is green
(d). Only floor area shall be measured for payment purpose.
(e). Treatement shall only be done from approved manufacturer & name of manufacturer required to be approved from GE before treatement.
(f) Joints of trap/WC/soil pipe shall be properly sealed with sealing compound. | 5 | Sqm | 1,000 ₹5,000 Lowest | 2,500 ₹12,500 | 2,000 ₹10,000 |
| 7.00 | Preparation of new or previously untreated roof surface of any description and applying two coats of aluminium paint over roof surfaces incl primer over 10cm grith or width not otherwise described all as specified and directed. | 200 | Sqm | 50 ₹10,000 Lowest | 50 ₹10,000 Lowest | 60 ₹12,000 |
| 8.00 | Taking down chowkhat or frames of door/ window with shutters (Without taking off shutter from the frame) exc 1.50 m and n.exc 4.00 Sqm each, complete all as specified and directed. | 15 | Each | 20 ₹300 | 10 ₹150 | 5 ₹75 Lowest |
| 9.00 | Taking down chowkhat or frames of door/ window with shutters (Without taking off shutter from the frame) n.exc 1.50 sqm complete all as specified and directed. | 30 | Each | 20 ₹600 | 10 ₹300 | 5 ₹150 Lowest |
| 10.00 | Taking down shutters of any description exc 1.00 Sqm and not exc 2.00 Sqm each, complete all as specified and directed | 15 | Per Leaf | 40 ₹600 | 10 ₹150 | 5 ₹75 Lowest |
Tender Value
₹43 L
EMD Value
₹86,000
Closing Date
4 Jul 2026, 6:00 pmClosed
GE (N) Akhnoor
GE (N) Akhnoor PIN 181201 C/O 56 APO
PERIODICAL SERVICES IN SOUTHERN GARRISON INCLUDING CERTAIN REPAIRS TO PLASTERING, JOINERY PLUMBING SANITARY FITTING ROOFING FLOORING ETC AT SUNDERBANI UNDER GE (NORTH) AKHNOOR
2026_MES_770199_1
GE(N)/AKH-28/2026-27
Open Tender
Civil Works
Item Rate
180 days
Sunderbani
Class D Cat a i
8 documents required · 8 mandatory
₹500
GE (N) Akhnoor
₹86,000
Yes
15 Jul 2026
6 Jun 2026
11 Jul 2026
6 Jun 2026
4 Jul 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down old unsv roof treatment including PCC padding if any, plastering, removing existing bitumen felt treatment including brushing, cleaning top surface of roof slab, brooming etc incl disposing off debris from MoD land complete all as specified and directed. | 200 | Sqm | - | - |
| 2 | Rendering 15 mm thick in cement and sand mortar 1:3 on roof surfaces with mixing of water proofing admixture as per manufacturer's instruction including finishing the surface even and fair to receive roof treatment, complete all as specified and as directed.
Note:- Supply of Water proofing compound shall not be measured & paid seperately. | 200 | Sqm | - | - |
| 3 | Roof treatment :- Water proofing treatment to RCC roof slab including parapet as under :- (a) 1st Course : Apply a coat of bituminous primer conforming to IS-3384@ 0.40 Kg /Sqm on prepared surface of plaster and after drying of primer.
(b) 2nd Course : Applying evenly a tack coat of industrial bitumen grade 85/25 conforming to IS-702 at rate of 1.2 Kg/Sqm.
(c) 3rd Course : APP (Atactic Polypropylene) modified polymeric membrane, 5 layered, 3 mm thick weight not less than 3.0 Kg/Sqm with 160 Grams/Sqm non woven polyester made at centre core reinforced laid with 75 mm side overlap and 150 mm end overlap, membrane has to be laid with LPG torch and overlap sealed and finished neat, all joints.
(d) 4th Course : Apply a coat of hot blown 85/25 grade bitumen conforming to IS-702 @ 1.2 Kg/sqm over membrane and dusted with dry sand @ 0.50 to 1 Kg/sqm.
(i) On Non-accesible roof : After providing (a) to (c) provide aluminium paint as per manufacturer instructions. to be measured and paid separately under relevant item of BOQ (ii) Coved fillet in PCC 1:2:4 type B0 (using 12.5 mm graded crushed stone aggregate) of required radius 75mm shall be provided at the junction of roof and vertical surface such as parapet wall/mumty around opening and treatment mentioned above shall be applied followed by a cement plaster 20mm thick in cement mortar(1:6).
Note : (i) Roof treatment work shall be carried out through approved manufacturers only or through their authorised personal only. | 200 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
tender.pdf
Tender Documents • 1.07 MB
BOQ_862528.xls
BOQ • 0.66 MB
Corrigendum28.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].