Tender Value
₹68.7 L
EMD Value
₹68,800
Closing Date
15 Oct 2026, 6:00 pm6d left
The Chief Officer, Limbdi Nagarpalika, Limbdi
Supply, installation, testing and commissioning of pumping machinery for water supply and drainage at different head works in Limbdi Municipality area
352184
1/2026-27
Open
Civil Works - Others
Works
Surendranagar
1 document required · 1 mandatory
₹2,832
The Chief officer, Limbdi Nagarpalika
₹68,800
5 Oct 2026
5 Oct 2026
5 Oct 2026
15 Oct 2026
5 Oct 2026
ESTIMATED COST: RS.
Standard Bidding Document of
LIMBADI NAGARPALIKA
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
LIMBADI NAGARPALIKA – LIMBADI
DRAFT TENDER PAPER
Bid documents for “Supply, installation, testing and commissioning of pumping machinery for
water supply and drainage at different head works in Limbadi Nagarpalika area District :
Surendranagar ”
Milestone Dates
Downloading of tender End Date Date 15/10/2026, Till 18:00 Hrs.
Online Submission of Bid Up to date 15/10/2026, Till 18:00 Hrs.
Submission of EMD, Tender fee & Submission of all Tender Document along with
Document tender fee and EMD Scan Copy in Online
electronic format. Original Tender Fee, EMD and
Original Copy of affidavit for Authenticity of
documents must be sent in through R.P.A.D./
Speed Post so as to reach the office of Chief
officer, Limbadi Nagarpalika, Limbadi, End Date
Date of Technical Bid Opening Date 21/10/2026 & 11:00 Hrs.
Date of Price Bid Document Opening On Date 21/10/2026 & 11:30 Hrs.
LIMBADI NAGARPALIKA
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
STANDARD BIDDING DOCUMENT
COMPLETE BIDDING DOCUMENT
GOVERNMENT OF GUJARAT
LIMBADI NAGARPALIKA
This is a generic SBD to be used for Civil works. Each user/concern department
needs to examine and put up their particular bidding requirement like; qualification criteria,
contract Data etc., marked at [#] while finalizing their own bidding process.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Sr No Section Description
1 Invitation for Bid (IFB)
2 Section -1 Instructions to Bidders
3 Section -2 Qualification Information
4 Section -3 Conditions of Contract
5 Section -4 Contract Data
6 Section -5 Technical Specification
7 Section -6 Form of Bid
8 Section -7 Bill of Quantities
9 Section -8 Securities and Other Forms
10 Section -9 Drawings
11 Section -10 Documents to be furnished by Bidder
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
INVITATION FOR BID
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
NATIONAL COMPETITIVE BIDDING
1. The Limbadi Nagarpalika invites bids for the construction of works detailed in the table.
The bidders may submit bids for any or all of the following works.
Sr. No. Name Approximate Bid Cost of Period of #Class of
of work value of works security document completion Registration /
(Rs.) (Rs.) Category of
1 As Per NIT 68,72,189.02 68,800.00 Rs. 6 month D & Above
& Details 2400+432(18%
Given Below GST) = 2832/-
Name of Work: Bid documents for “Supply, installation, testing and commissioning of pumping
machinery for water supply and drainage at different head works in Limbadi Nagarpalika area
District : Surendranagar
Prospective / Interested bidder may download the Bid Documents from website
https://www.nprocure.com free of cost till the Time and Date as mentioned on online
NIT at website https://www.nprocure.com.
2. However, Bidder who is submitting the Bid Online will have to pay the Bid Document
Fee / Tender Fee through Demand Draft only of any Schedule Bank
payable at Limbadi and in favour of ‘Chief Officer, Limbadi Nagarpalika. Once the Bid
is received online, Bid Document / Tender Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee
against Bid Security / EMD shall be submitted in electronic format through online (by
scanning) while uploading the bid, this submission shall mean that bid document /
tender fee and Bid Security / EMD has been received. Accordingly, the offer of only
those shall be opened whose Bid Document / Tender Fee and Bid Security / EMD
have been received electronically. However, for the purpose of realization of
Demand Draft, and FDR / Bank Guarantee bidder shall send the same in original
through R.P.A.D. so as to reach to #‘Chief Officer, Limbadi Nagarpalika within
mentioned in NIT (Days) from the last day of bid submission.
Penaltative action for not submitting Demand Draft / FDR / Bank Guarantee in
original to Chief Officer / Tender Inviting Authority by bidder shall be initiated.
3. Bids received online, will be opened on the time, date and place as specified in the
online NIT at website https://www.nprocure.com in the presence of the bidders or
their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the
bids will be opened on the next working day at the same time and venue.
4. A pre bid meeting will be held on ………………………………at
………………………..hrs. at the office of to clarify the issues and to answer
questions on any matter that ........ may be raised at that stage as stated in
clause 9.2 of ‘instructions to Bidders’ of the bidding documents.
5. #Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and
should be rounded off to the next thousand rupees.
6. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of
the tender submission date and time. After the tender submission date and
time, the bidder cannot modify / edit / withdraw their submitted offer in any case.
No written or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date
of submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
discussion, conferences or site visits will not be reimbursed by the Employer or
Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with
tender are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and
the bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with the
format given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked
strictly in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall result
in disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the
past, it shall not be deemed to be a ground / reason for not giving required
information for this work / bid.
L. Information supplied for earlier projects shall not be considered while evaluation
of this bid. The Government will not ask for any other information, unless it is
found absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
# For the works costing up to 7.5 crore (ROAD), 7.0 crore (BUILDING &
BRIDGE) kindly refer to SSR-10-2015-17-C dated 03-02-2017
For the works costing under 7.5 crore for Road Works and 7.0 crore for Building
and Bridge Works following documents shall be submitted in electronic format
through online by scanning and the (i) Bid Document Fee / Tender Fee (ii) Bid
Security / EMD & Other should be sent in original to the Tender opening authority
through RPAD, so as to reach the Chief Officer.
(i) Bid Document Fee / Tender Fee
(ii) Bid Security / EMD or Valid EMD Exemption Certificate of Appropriate
Class of Registration of Approved Contractors
(iii) Registration Certificate of Appropriate Class
(iv) Registration Certificate of Special Category - Road / Bridge /
Building and Category I / II / III, if required
(vi) Work Experience, if necessary…
(vii) Other Documents, as required…
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
INSTRUCTIONS TO BIDDERS (ITB)
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Section 1: Instructions to Bidders
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 9 19. Sealing & Marking of Bids
2. Source of Funds 9 20. Deadline for Submission of
3. Eligible Bidders 9 21. Late Bids
4. Qualification of the 9 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 16 E. Bid Opening and Evaluation
7. Site Visit 16 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding Documents 17 26. Examination of Bids and
Determination of
9. Clarification of Bidding 17 27. Correction of Errors
10. Amendment of Bidding 18 28. Deleted
29. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 18 F. Award of Contract
13. Bid Prices 18 31. Award Criteria
14. Currencies of Bid and 19 32. Employer’s Right to Accept
Payment any Bid and to Reject any or
15. Bid Validity 19 33. Notification of Award and
Signing of Agreement
16. Bid Security 19 34. Performance Security
17. Alternative Proposals By 20 35. Advance Payment and Security
18. Format and Signing of Bid 20 36. Dispute Review Expert
37. Correct or Fraudulent
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works (as
defined in these documents and referred to as ‘the works”) detailed in the table given in
IFB. The bidders may submit bids for any or all of the works detailed in the table given in
1.3 The successful bidder will be expected to complete the works by the intended completion
date specified in the Contract data.
1.4 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives
(bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are synonymous.
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat / Govt. of
India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project
Manager for the Contract. A firm that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of its
affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including drawings
and charts, as necessary. The proposed methodology should include a program of
construction backed with equipment planning and deployment duly supported with broad
calculations and quality assurance procedures proposed to be adopted justifying their
capability of execution and completion of work as per technical specifications, within
stipulated period of completion.
4.2 In the event that Pre-qualification of potential bidders has been undertaken, onlybidsfrom
prequalified bidders will be considered for ward of Contract. These qualifiedbidders should
submit with their bids any information updating their original prequalificationapplications or,
alternatively, confirmin their bids that the originally submittedprequalification information
remainsessentially correct as of date of bid submission. Theupdate or confirmation shouldbe
provided in Section 2. A copy of the originalprequalification application and the letter of
prequalification should also be furnished. With the updated information, the bidder must
continue to be qualified in accordance with the criteria laid down in the prequalification
document. All bidders shall also furnish the following information in Section
(i) Evidence of access to or availability of credit facilities (minimum 10% of estimated
cost) certified by the bankers.
(ii) Undertaking that bidder would be able to invest a minimum of cost upto 25% of the
contract value of work, during implementation of contract.
(iii) Proposal, if any, for sub-contracting of elements of work, costing more than 10% of
the bid amount.
(iv) Power of attorney.
(v) Latest income tax clearance certificate from concerned department.
4.3 If the Employer has not undertaken prequalification of potential bidders, all bidders shall
include the following information and documents with their bids in Section 2:
(a) copies of original documents defining the constitution or legal status, place of registration,
and principal place of business; written power of attorney of the signatory of the Bid to
commit the Bidder;
(b) total monetary value of construction work performed for each of the last five years;
(c) experience in works of a similar nature and size for each of the last five years, and details
of works underway or contractually committed; and clients who may be contacted for further
information on those contracts;
(d) major items of construction equipment proposed to carry out the Contract;
(e) qualifications and experience of key site management and technical personnel proposed
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
(f) reports on the financial standing of the Bidder, such as profit and loss statements and
auditor's reports for the past five years;
(g) evidence of access to line(s) of credit and availability of other financial resources facilities
(10% of contract value), certified by the Bankers (Not more than 3 months old)
(h) undertaking that the bidder will be able to invest a minimum cash up to 25% of contract
value of work, during implementation of work.
(i) authority to seek references from the Bidder's bankers;
(j) information regarding any litigation, current or during the last five years, in which the
Bidder is involved, the parties concerned, and disputed amount;
(k) proposals for subcontracting components of the Works amounting to more than 10 per
cent of the Bid Price (for each, the qualifications and experience of the identified sub-
contractor in the relevant field should be annexed); and
(l) the proposed methodology and programme of construction, backed with equipment
planning and deployment, duly supported with broad calculations and quality control
procedures proposed to be adopted, justifying their capability of execution and completion of
the work as per technical specifications within the stipulated period of completion as per
milestones (for all contracts over Rs.5 Crore).
4.4 Bids from Joint ventures are not acceptable.
Bids from prequalified firms or prequalified joint-ventures only will be acceptable.
#4.5 QUALIFICATION CRITERIA:
(Applicable for the works which require Post Qualification)
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/ fail
criteria regarding the Applicant’s general and particular experience, personnel and
equipment capabilities and financial positions, as demonstrated by the applicant’s
responses in the forms attached to the letter of application ( specified requirement for
joint ventures are given under para 4.6 below ) Subcontractors experience and resources
shall not be taken in to account in determining the applicants compliance with the
qualifying criteria to qualify for more than one contract, the applicant must demonstrate
having experience and resources sufficient to meet the aggregate of the qualification
criteria for each contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year (2025-2026)
Following enhancement factors will be used for the costs of works executed and the
financial figure to a common base value for works completed in India.
Effective cost of
executed work at
Year previous completed
financial year’s price
Base year of 2025-
inviting tender
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Applicant should indicate actual figures of costs and amount for the works executed by
them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency the
above enhanced multiplying factors will not be applied. Instead, the current market
exchange rate (State Bank of India BC Selling rate as on the last date of submission of
the bid) will be applied for the purpose of conversion of the amount in foreign currency
into India rupees.
4.5.3. General Experience.
To qualify, each bidder in the same name and style should have achieved the following
List of Mandatory documents to be submitted
a. Registration
b. EMD/Bid Security /Tender Fee
c. Solvency Certificate
e. Bid Capacity
f. Document supporting similar nature of work & physical criteria
g. Declaration of Non-Blacklisted / Debarred /abandoned from Anywhere in Gujarat & also in India.
The Declaration will be on the Rs.300/- Non-judicial paper should be submitted (Mandatory)
If bidder fails to submit above documents or mandatory criteria are not fulfilled, bidder shall be
considered as not qualified and their financial bid shall not be open. To qualify, each bidder in the
same name and style should have achieved the following performances:
a. Registration: As per Section: II, Instruction to Bidder, Clause
b. EMD and Tender Fees
As per tender notice.
C. Solvency Certificate
Bank Solvency of minimum Rs. 17,18,100.00/-(25% of estimated cost)Solvency Value Certificate of
the organization should be of current calendar Year issued by Nationalized Bank or Bank listed as per
latest GR of. Finance Department GR. No: FD/MSM/efile/4/2023/0057/DMO, Date:21.04.2023. Such
certificate should be issued on Banker’s letter head.
4.5.3.1 TURNOVER:
Bidder must have achieved minimum annual financial turnover (at current price level) from contract
receipt of works (in all classes of civil/ mechanical engineering construction works only) of Rs.
34,36,095/- in Last three financial years i.e., from April 2022 to March
The details pertaining to turnover for the year April 2022 to March 2025 shall be certified by
Chartered Accountant on his own letter head and duly attested. Turnover of financial year 2024-
25 shall be considered subject to submission of provisional/audited certificate from chartered
accountant by the Bidder
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
4.5.3.2 SIMILAR NATURE OF WORK:
The bidder must have completed similar nature of work i.e., Pumping machinery work within
last five financial years i.e., from April 2020 to March 2025 and up to one month prior to last date
of submission of the bid of value not less than:
One similar completed work costing not less than the amount equal to Rs. 54,97,752.00 /-
Two similar completed works costing not less than the amount equal to Rs. 34,36,095.00 /-
Three similar completed works costing not less than the amount equal to Rs. 27,48,876.00 /-
4.5.3.3 AVAILABLE BID CAPACITY
The Bidder who fulfills the qualifying criteria mentioned above shall be qualified only if he fulfils the
requirement of bidder’s capacity. The bidding capacity of any tender/ Bidder is required to be more
than or equal to the estimated cost of the work i.e., Rs. 68,72,189.02 The bidder’s capacity shall be
computed as shown below.
Available Bid Capacity = [(A x N x 2.0) - B)]
Maximum value of construction works executed in any one year during the last Five years
updated at the financial year updated at 2025-26 Price level.
B = Value of the existing commitments as on date of bid submission for works (complete or
partial) to be completed in the next (0.5 year). The details shall be countersigned by the
Executive Engineer or the equivalent officer of the employer on whose behalf the firm is
carrying out the works.
Also, declaration of financial liabilities, work on hand/completed projects on Rs.300/- non-
Judicial stamp paper.
In the case of a Joint Venture (Not Applicable), parameters A and B shall be determined
based on details pertaining to such partners who propose to undertake physical execution of
work and in proportion to their participation/stake as specified in respective clause in the
tender documents.
N = Years prescribed for completion of the work for which bids are invited. - (0.50 year)
If the Tender has been invited as a Package/Slice Minimum aggregate required Bid Capacity shall be
considered and accordingly the Bidder may qualify for less number of Packages/Slices. In case of
individual Tenders (not invited in a single Basket) the Bidder may qualify for a particular work (based on
his Technical Bid), but at the time of evaluation of Price Bid, if a greater number of such individual Bids
are evaluated simultaneously, aggregate Bid Capacity shall be considered. In such a case, if the Bidder
does not have adequate capacity for all the Bids in which his Bid is the lowest responsive Bid, he may
be considered for a smaller number of Bids. Decision of the Employer based on the least cost
combination as may be the most advantageous to Competent authority shall be final and binding to all
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
(a) The statement showing the value and details of completed works, existing commitments and
ongoing works as well as the stipulated period of completion remaining for each of the work listed
should be countersigned by the officer not below the rank of an Engineer-In-Charge.
(b) The certificate for past performance should be as per prescribed Performa in Form11...
(c) The Bidders are required to upload latest client’s certificates in Form-11 (or in any format with
yearly breakup) obtained from the concerned authorities/ employers towards proof of their having
executed contracts satisfactorily along with their bids. The quantities involved should be certified by
the top executive of the firm in the prescribed Performa in Form 11 (or in any format with yearly
breakup) of Volume-I.
(d) Physical and Financial Performance of Any Work Not Supported By Client Certificate in Form-11 or
In Any Form Will Not Be Considered For Qualification.
(e) The applicant Bidder must provide by uploading evidence of having adequate experience. The bid
should include supporting certificate or report relating to physical, financial, technical and other
capability of Bidder in their original language along with certified translation of relevant portion of
the certificate/ report in English. The Bidder should furnish the information about financial capability
in Rupees only.
(f) Depending upon the actual bid capacity assessed and other qualifying requirements, the applicant
will be qualified for the work.
(g) The bidder is required to submit the declaration of his financial liabilities, work on hand/completed
projects on Rs.300/- non-Judicial stamp paper. In case of false statement/ declaration the bidder
shall be liable for penal action. Further, the details furnished in the relevant form as per tender
should be in line to the declaration by the bidder.
(h) The criteria mentioned above at shall be evaluated based on the details submitted with the
documents. Such bidder shall have to submit the details in the prescribed Performa which are
applicable to them. Bidders should read the note under each Form/Annexure carefully and submit
the details accordingly.
(i) Turnover of previous year and cost of completed / executed similar nature of work/ O&M shall be
given additional weightage of ten percent per year to bring them to 2025-2026 Price level to
account for price escalation as illustrated below:
Effective cost of executed
Turnover/ Cost of work at previous
Executed work/O&M completed financial year’s
(i) Financial year means period beginning from the 1st April to 31st March of the next year.
(ii) The details pertaining to Turnover for the year April 2020 to March 2025 and the details pertaining
to Net Cash Accrual, Net Worth and Net Working Capital for the year April 2020 to March
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
shall be certified by Chartered Accountant on his own letter head and duly attested. The cost of
material supplied by the Government/ Client shall not be taken into account for experience against
Turnover & Similar nature of work.
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major
equipment to attain the completion of works in accordance with the prescribed
construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with their
bid, a detailed construction planning and methodology supported with layout and
necessary drawings and calculations to allow the employer to review their proposals. The
numbers, types and capacities of each plant/equipment shall be shown in the proposals
along with the cycle time for each operation for the given production capacity to match
the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid
assets (aggregate of working capital, cash in hand and uncommitted bank guarantees)
and / or credit facilities up to 25 percent of the value of the contract / contracts applied.
4.5.7. The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant’s financial position, showing long – term
profitability including an estimated financial projection for the next two years If necessary,
the employer will make inquiries with the applicant’s bankers.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting
from contracts completed or under execution by him over the last five years. A consistent
history of awards against the Applicant or any partner of a joint venture may result in
failure of the applicant.
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to be disqualified if
Made misleading or false representation in the forms, statements submitted, and / or
Record of poor performance such as abandoning the work, rescinding of contract for
which the reasons are attributable to the non – performance of the contractor; consistent
history of litigation awarded against the applicant or financial failure due to bankruptcy.
The rescinding of contract of a joint venture on account of reasons other than non –
performance, such as Most Experienced partner of joint venture pulling out, court
directions leading to breaking up of a joint venture before the start of work, which are not
attributable to the poor performance of the contractor will, however, not affect the
qualification of the individual partners.
#4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 Others)
(Applicable only for estimated project cost of 50 Crore and above) –
JV NOT APPLICABLE
4.6.1. Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given in para 4.5.3
& 4.5.6 above. The joint venture must collectively satisfy the criteria of para 4.5.3 &
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
4.5.6 above. The experience of the other joint venture partners shall be considered
if it is not less than 30 percent of the qualifying criteria in para 4.5.3 & 4.5.6 above.
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8 above.
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, and shall be
submitted with a copy of the joint venture agreement providing the joint and several
liabilities with respect to the contract.
4.6.2. Qualification of a joint venture does not necessarily qualify any of its partners individually
or as a partner in any other joint venture. In case dissolution of a joint venture, each one
of the constituent firms may qualify if they meet all the qualification requirements, subject
to the written approval of the Employer.
4.7. Bid Capacity.
4.8 Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have:
- Made misleading or false representation in the forms, statements and
Attachments the submitted in proof the qualification requirements; and / or Record of
poor performance such as abandoning the works, not properly completing the
contract, inordinate delay in completion, litigation history, or financial failures etc.;
and/ or participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to the
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals with the
bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his Bid,
and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine
the Site of work and its surrounding and obtain all information that may be necessary for
preparing the Bid and entering into a contract for construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda
issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder IV
8.2. Volumes I, IIand III are available online and documents to be furnished by the bidder in
compliance to section 2 will be prepared by him and furnished as Volume- IV in two parts
(refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, bill of quantities, forms, Annexes and
drawings in the Bid Document. Failure to comply with the requirements of Bid Documents
shall be at the bidder’s own risk. Pursuant to clause 26 hereof, bids which are not
substantially responsive to the requirements of the Bid Documents shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may notify the
Employer in writing or through E-mail at the Employer’s address indicated in the
invitation to bid. The Employer will respond to any request for clarification which he
received earlier than 15 days prior to the deadline for submission of bids. Employer’s
response will be published on website including a description of the enquiry but without
identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting which will
take place at the address, venue, time and date as indicated in the appendix.
9.2.3. The purpose of the meeting will be to clarify issues and to answer questions on any
matter that may be raised at that stage.
9.2.4. The bidder shall be required to submit any questions in writing or e-mail to reach the
Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the source of
enquiry) and the responses given will be published without delay on the tender website
i.e. www.nprocure.com. Any modification of the bidding documents listed in sub-
Clause 8.1 which may become necessary as a result of the pre-bid meeting shall be
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
made by the Employer exclusively through the issue of an Addendum pursuant to
Clause 10 and not through the minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a bidder.
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer will
assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause 8.1)
shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
technical as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder IV
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on the
priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and words) for all
items of the Works described in the Bill of Quantities along with total bid price (Both in
figures and words). Items for which no rate or price is entered by the bidder will not be
paid for by the Bill of Quantities.
13.3 All duties, taxes, GST and other levies are payable by the contractor under the contract,
or for any other cause shall be included in the rates, prices and total Bid Price submitted
by the Bidder. (GST will not be paid extra)
13.4 The rates and prices quoted by the bidder are subject to adjustment during the performance
of the Contract in accordance with the provisions of Clause 47 of the Conditions of Contract
(For contracts more than 12 Months period).
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The rates and the prices quoted by the bidder shall be entirely in Indian Rupees. All
payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the deadline date
forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer may
request that the bidders may extend the period of validity for a specified period. A bidder
may refuse the request without forfeiting his bid security. A bidder agreeing to the request
will not be required or permitted to modify his bid, but will be required to extend the
validity of his security for a period of the extension, and in compliance with Clause 16 in
#16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 4 of the table of IFB for this particular work. This Bid security shall be in favor of
Employer as named in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in Volume
III. (Bank Guarantee is applicable only for Bid Estimated Amount of 01 Crore
and above) and Bank Guarantee of Schedule and Private Banks shall be
considered as per GoG Finance Department’s Circular No. FD/MSM/e-
file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
# A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and Kalpsar
Department of Govt of Gujarat. Exemption Certificate is applicable only when
Registration Certificate of Appropriate Class and Category of Approved
Contractors is required as eligible criteria of bidder.(EMD Exemption not
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for the
bid shall be valid for 28 days beyond the validity of the bid i.e. total validity of 120+28 =
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated
in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as non-
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end of
the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed
the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid validity.
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) #If found necessary, the bidder will be intimated for negotiation, He will be
intimated maximum three times within the validity period for negotiation, If
contractor does not respond in time, his Bid Security (EMD) will be forfeited and
his tender will be rejected. Punitive action will be taken on such contractors. (As
per GoG R&B Dept’s Gr. No. S/22/2017/6369/D, Dt.08/06/2018)
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or time
for completion), basic technical design as indicated in the drawing and specifications.
Conditional offers or alternative offers will not be considered further in the process of
tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of
these Instructions to bidder as the “Technical Bid “and “Financial Bid” in separate parts to
D. SUBMISSION OF BIDS
19. Sealing and Marking of Bids
19.1. The Bidder shall submit the bid namely, Technical Proposal & Financial Proposal through
online by the help of Digital Signature Certificate.
-Technical Bid: To be opened on 00.00. 2026 at 14.00 Hrs. (date of Technical Bid
opening) in the presence of Evaluation Committee.
-Financial Bid: Not to be opened except with the approval of Evaluation Committee The
contents of Technical and Financial Bids will be as specified in clause
19.2. The inner, outer, and separate envelopes containing Technical and FinancialBids shall
(A) be addressed to the Employer at the address given in Appendix
(B) bear the identification as indicated in Appendix.
19.3. In addition to the identification required in Sub-Clauses 19.1 and 19.2, each of the
envelopes shall indicate the name and address of the bidder to enable the bid to be
returned unopened in case it is declared late, pursuant to Clause 21, or the Evaluation
Committee declares the bid as non responsive pursuant to Clause
19.4. If the outer envelope is not sealed and marked as above, the Employer with assume no
responsibility for the misplacement or premature opening of the bid.
20. Deadline for Submission of the Bids
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
20.1. Complete Bids must be received online by the Employer at the tender website specified
above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an amendment
in accordance with Clause 10, in which case all right and obligation of the Employer and
the bidders previously subject to the original deadline will then be subject to the new
21.1. Any Bid received by the Employer after the deadline prescribed in Clause 20 will be
returned unopened to the bidder.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.2 Withdrawal or modification of a bid between dead line for submission of bids and the
expiration of the original bid validity specified in Clause 15.1 above or as extended pursuant
to Clause 15.2 may result in the forfeiture of the Bid Security pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids and the
expiration of the original period of bid validity specified in Clause 15.1 above or as
extended pursuant to Clause 15.2 may result in the forfeiture of the Bid security
pursuant to Clause
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant to
Clause 22, in the presence of the Bidders or their representatives who choose to attend
at time, date and the place specified in Appendix in the manner specified in Clauses
and 23.3, In the event of the specified date of Bid opening being declared a holiday for
the Employer, the Bids will be opened at the appointed time and location on the next
23.2. Envelopes marked "WITHDRAWAL" shall be opened and read out first. Bids for which an
acceptable notice of withdrawal has been submitted pursuant to Clause 22shall not be
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid security
furnished with each bid will be announced. If the bid security furnished does not conform
to the amount and validity period as specified in the invitation for bid (ref. Column 4 and
paragraph 3), and has not been furnished in the form specified in Clause 16, the
technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids accompanied
with valid bid security will be taken up for evaluation with respect to the
Qualification information and other information furnished in part I of the bid
pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification letter.
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the
Evaluation Committee will finalize the list of responsive bidders whose financial
bids are eligible for consideration.
23.5. If, as a consequence of the modifications carried out by the bidder in responseto sub-
clause 23.4, the bidders desire to modify their financial bid, they will submit the
modification in separate sealed envelope so as to reach the Employer's address (refer
sub-clause 19.2) before the opening of the financial bid as intimated in the clarification
letter (refer sub-clause 23.4). The envelope shall have clear marking "MODIFICATION
TO FINANCIAL BID-Not to be opened except with the approval ofthe Evaluation
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only these
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total amount
of each bid, any discount and such other details as the Employer may consider
appropriate, will be announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found responsive in
accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will
be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid,
be opened. The responsive Bidders’ names, the Bid prices, the total amount of each bid,
any discount, and such other details as the Employer may consider appropriate, will be
announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of Estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of Bids
and recommendations for the award of a contract shall not be disclosed to Bidders or any
other persons not officially concerned with such process until the award to the successful
Bidder has been announced. Any effort by Bidder to influence the Employer’s processing
of Bids or award decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may, at
his discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit
rates. The request for clarification and the response shall be in writing or by e- mail, but
no change in the price or substances of the Bid shall be sought, offered, or permitted
except as required to confirm the correction of arithmetic errors discovered by the
Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter relating to
his Bid opening to the contract is awarded. If the Bidder wishes to bring additional
information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid
comparison or contract award decision may result in the rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether each
Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly
signed; (c) is accompanied by the required securities and; (d) is substantially responsive
to the requirements of the Bidding document. During the detailed evaluation of the
“Financial Bid”, the responsiveness of the bids will be further determined with respect to
the remaining bid conditions, i.e., priced bill of quantities, technical specifications, and
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms, conditions
and specifications of bidding documents, without material deviation or reservation. A
material deviation or reservation is one (a) which affects in any substantial way the
scope, quality, or performance of the Works; (b) which limits in any substantial way,
inconsistent with the Bidding documents, the Employer’s rights or the Bidder’s obligations
under the Contract; or (c) whose rectification would affect unfairly the competitive position
of other Bidders presenting substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer, and
may not subsequently be made responsive by correction or withdrawal of the non-
conforming deviation or reservation.
27. Correction of Errors
27.2 "Financial Bids" determined to be substantially responsive will be checked by the
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Employer for any arithmetic errors. Errors will be corrected by the Employer as follows:
(a) where there is a discrepancy between the rates in figures and in words, the rate in
words will govern; and
(b)where there is a discrepancy between the unit rate and the line item total
resulting from multiplying the unit rate by the quantity, the unit rate as quoted will
27.2 The amount stated in the "Financial Bid" will be corrected by the Employer in accordance
with the above procedure and the bid amount adjusted with the concurrence of the Bidder
in the following manner:
a) If the Bid price increases as a result of these corrections, the amount as stated in
the bid will be the 'bid price' and the increase will be treated as rebate;
b) If the bid price decreases as a result of the corrections, the decreased amount will
be treated as the 'bid price'
Such adjusted bid price shall be considered as binding upon the Bidder. If the Bidder does not
accept the corrected amount the Bid will be rejected, and the Bid security may be forfeited in
accordance with Sub-Clause 16.6 (b).
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially
responsive in accordance with Sub-Clause 26.2.
29.2. In evaluating the Bids, the employer will determine for each Bid the evaluated Bid Price by
adjusting the Bid Price as follows.
a) Making any correction for errors pursuantto Clause 27; or
b) making an appropriate adjustments for any other acceptable variations, deviations; and
c) making appropriate adjustments to reflect discounts or other price modifications offered
in accordance with Sub-Clause
29.3. The Employer reserves the right to accept or reject any variation or deviation. Variation
and deviations and other factors, which are in excess of the requirements of the Bidding
documents or otherwise result in unsolicited benefits for the Employer, shall not be taken
in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the Conditions
of Contact, during the period of implementation of the Contract, will not be taken in to
account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s
estimate of the cost of work to be performed under the contract the Employer may require
the Bidder to produce detailed consistency of those prices with the construction methods
and schedule proposed. After evaluation of the price analyses, the Employer may require
that the amount of the performance security set forth in Clause 34 be increased at the
expense of the successful /bidder to a level sufficient to protect the Employer against
financial loss in the event of default of the successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically priced
low and which cannot be substantiated satisfactorily by the bidder may be rejected as
non-responsive.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has
been determined.
(i) to be substantially responsive to the Bidding documents and who has offered the
lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price which is
the lowest evaluation in any of the packages opened earlier than the one
In no case, the contract shall be awarded to any bidder whose available bid
capacity is less than the evaluated bid price, even if the said bid is the lowest evaluated
bid. The contract will in such cases be awarded to the next lowest bidder at his
evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any Bid,
and to cancel the Bidding process and reject all Bids, at any time prior to the award of
contract, without thereby incurring any liability to the affected bidder or Bidder or any
obligation to inform the affected Bidder or Bidders of the grounds for the Employer’s
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by cable, telex or facsimile confirmed by
registered letter. This letter (hereinafter and in the condition of contract called the “Letter
of Acceptance”) will state the sum that the Employer will pay the Contractor in
consideration of the execution, completion, and maintenance of the Works by the
Contractor as prescribed by the Contract (hereinafter and in the Contract called the
“Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to the
furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the successful
Bidder. It will be signed by the Employer and to the successful Bidder, within 28 days
following the notification of award along with the Letter of Acceptance. Within 21 days of
receipt, the successful Bidder will sign the Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the Employer
will promptly notify the other Bidders that their Bids have been unsuccessful.
34. Performance Security
34.1. Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall furnish
to the Employer an irrevocable and unconditional guarantee from a Bank in the form set
forth in Section 8 (the “Performance Security”) for an amount equal to 5% (five percent) of
its Contract Price. In case of bids mentioned below, the successful Bidder, along with
the Performance Security, shall also furnish to the Authority an irrevocable and
unconditional guarantee from a Bank in the same form given at Section 8 towards an
Additional Performance Security (The “Additional Performance Security”) for an amount
calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but upto 20% of
the Estimated Project Cost, then the Additional Performance Security shall be
calculated @ 20% of the difference in the (i) Estimated Project Cost (as mentioned in
Bid Document) - Minus 10% of the Estimated Project Cost and (ii) Contract Price
offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the
Estimated Project Cost, then the Additional Performance Security shall be calculated
@ 30% of the difference in the (i) Estimated Project Cost (as mentioned in Bid
Document) - Minus 10% of the Estimated Project Cost and (ii) Contract Price offered
by the selected Bidder.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
(c) This Additional Performance Security shall be treated as part of the Performance
(D) The Performance Security shall be valid beyond 60(sixty) days of the Defects Liability
Period and the Additional Performance Security shall be valid beyond 28 (twenty-
eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a Bank
Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and
acceptable to the Employer. As per GoG Finance Department’s Circular No.
FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest amendment.
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of the Bid
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated in
the Conditions of Contract, subject to maximum amount, as stated in the Contract
36. Dispute Review Expert
36.1 The Employer proposes that [name of proposed Dispute Review Expert as indicated in
Appendix] be appointed as Dispute Review Expert under the Contract, at a daily fee as
indicated in Appendix plus reimbursable expenses. If the Bidder disagrees with this
proposal, the Bidder should so state in the Bid. If in the Letter of Acceptance, the
Employer has not agreed on the appointment of the Dispute Review Expert, the
Dispute Review Expert shall be appointed by the Council of Indian Roads Congress at
the request of either party.
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in completing for the contract in
question and will declare the firm ineligible, either indefinitely or for a stated period of
time, to be awarded a contract with National Highways Authority of India/ State PWD
and any other agencies, if it at any time determines that the firm has engaged in corrupt
or fraudulent practices in completing for the contractor, or in execution.
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of the
Conditions of Contract.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
APPENDIX TO ITB
Clause Reference with respect to Section –I
1. The Name of the Employer is [ Cl.1.1]
Chief Officer Limbadi Nagarpalika
2. The last five years.
3. This Annual Financial Turnover Amount is Rs. [Cl.4.5.3 (a)]
4. Value of Work is Rs.
6. The cost of electric work is Rs
7. The cost of water supply / sanitary works is
8. Liquid assets and / or availability of credit facilities is Rs. ………… [Cl.4.5.6 ]
9. Price level of the financial year …………… [Cl. 4.5.2]
10. The pre-bid meeting will take place at …………. [Cl. 9.2.1]
11. The technical Bid will be opened at the office of the ……………………on
12. Address of the Employer: …………..
13. Identification :
( name of Contract)
- Bid reference No 0 of 2026-27 of Limbadi Nagarpalika- ( insert number)
- Do not open before 00.00. 2026 at 14.00 Hrs - ( time and date )
14. The bid should be submitted latest by As stated on online NIT [Cl. 20.1 & 20.2]
15. The bid will be opened at …………………………… As stated on online [Cl. 23.1 ]
16. The Bank Draft in favor of ………………………..
17. Escalation factors (for the cost of works [Cl.4.5.2]
executed and financial figure to a common base value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2025-2026
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
#LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they
propose to use on the work.
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work (Reference Cl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this work
1. Two graduate Mechanical Engineers and three diploma Mechanical Engineers when cost
of the work to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is
more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but
more than Rs.5 lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of work to be executed is
less than Rs. 5 lakhs. The Engineer so employed for the Government work must have
sufficient experience to handle the work independently. Such an Engineer shall have to
stay at the site of work and he shall not be entrusted with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer,
Employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Chief
Officer-in-charge of the work the Name, Qualifications, copy of marksheet, Colour
Photograph and the appointment order issued such engineers engaged for this contract
work. If 15 days after issue of work order such designated Site Engineers do not resume or
do not remain present on site of work, the recovery at the rate of Rs.15,000-00 per month
per Engineer will be made from the bills/deposit/dues of the contractor. Such recovery shall
be non-refundable.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
QUALIFICATION INFORMATION
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the
purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders. This
information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of
Bidder (Attach Copy)
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions
Work performed in the last five years
Work performed as prime contractor, work performed in the past as a nominated sub-
contractor will also be considered the sub-contract involved execution of all main items of
work described in the bid documents, provided further that all other qualification criteria
are satisfied (in the same name) on works of a similar nature over the last five years**
and in current year before the submission of the bid.
Project Name of Description Contract Value of Date Stipulated Actual date of Remark
Name the of work No. contract of period of completion* explaining
Employer (Rs. issue completion reasons for
Crore) of delay &
order Completed
*Attach certificate(s) from the Engineer(s)in-charge
** Immediately preceding the financial year in which bids are received.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
#1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a
nominated sub-contractor, will also be considered provided the sub-contract involved
execution of all main items of work described in the bid document, provided, further that
all other qualification criteria are called (in the same name and style) in the last seven
years** and in current year before the submission of the bid.
Year Nam Name of Quantity of work Remarks*
e of the performed (KW) (indicate
the Employer contract
work Pumping Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works which
are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place Contract Name & Value Stipulated Value of Anticipated
of works & No. Address Contract Period of Works* of
State of (Rs. Cr) Completion remaining completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref. Clause
4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to be
procured purchased
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
1.6 Qualifications and experience of key personnel required for administration and execution
of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of the Conditions
Position Name Qualification Year of Year of experience
Experience in the proposed
(General) position
Project Manager & Site
1.7 Proposed sub-contract and firms involved
Sections of the works Value of Sub- Sub-Contractor (Name Experience in
Contractor & similar work
Attach copies of certificates on possession of valid license for executing water supply/
sanitary work/ building electrification works.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
1.8 Financial reports for the last five years: balance sheets, profit and loss statements,
auditors’ reports (in case of companies/corporations), etc. List them below and attach
1.9 Evidence of access to financial resources to meet the qualification requirements: cash in
hand, lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who may
provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party (ies) Employer Cause of Amount Remarks
Dispute Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction to
Bidders. (Name of Consultant engaged for project preparations is * ............................... )
1.13 Proposed work method and schedule. The Bidder should attach descriptions, drawings
and charts as necessary to comply with the requirements of the Bidding documents.
(Refer ITB Clause 4.1)
1.15 Quality Assurance Plan
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the requirements
of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
(iii) Update of original prequalification application. (*)
(iv) Copy of original prequalification application (**)
(v) Copy of prequalification letter (***)
* Delete, if prequalification has been carried out.
** Fill the Name of Consultant.
*** Delete, if prequalification has not been carried out.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR
AVAILABILITY OF CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s. is a reputed company
with a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. To
meet their working capital requirements for executing the above during the contract
Senior Bank Manager
Address of the Bank
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
1. I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
have not abandoned/Blacklisted/
Debarred from any work of Government of Gujarat/Government of India/any Board or
Corporation under Government of Gujarat/Government of India nor any contract
awarded to us for such works have been rescinded, during last five years prior to the
date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by the
Department to verify this statement or regarding any (our) competence and general
4. The Undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the
Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
I, the undersigned do hereby undertake ......... that our firm M/s
up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
CONDITIONS OF CONTRACT
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Conditions of Contract
Table of Contents
A General D. Cost Control
1 Definitions 37 Bill of Quantities
2 Interpretation 38 Changes in the Quantities
3 Language and Law 39 Variations
4 Engineer’s Decisions 40 Payments for Variations
5 Delegations 41 Cash Flow Forecasts
6 Communications 42 Payment Certificates
7 Sub-Contractors 43 Payments
8 Other Contractors 44 Compensations Events
9 Personnel 45 Tax
10 Employer’s & Contractor Risk 46 Currencies
11 Employers Risks 47 Price Adjustment
12 Contractor’s Risk 48 Retention
13 Insurance 49 Liquidated damages
14 Site Investigations Reports 50 Bonus
15 Queries about the Contract 51 Advance Payment
16 Contractors to Construct the works 52 Securities
17 The Works to be Completed By 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 54 Cost of Repair
20 Discoveries E. Finishing the Contract
21 Possession of the Site 55 Completion
22 Access to the Site 56 Taking Over
23 Instructions 57 Final Account
24 Disputes 58 Operating and Maintenance
25 Procedure for Disputes
26 Replacement of Dispute Review 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted F. Special Conditions of
30 Delays Ordered by The 63 Labour
Engineer 64 Compliance with labour regulations
31 Management Meetings 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions of
Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming
part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by the
Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute,
complete and maintain the Works till the completion of Defects Liability Period. It
consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the Work
has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the
Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and
thereafter as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and
calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the
The Engineer is the person named in the Contract Data (or any other
competent person appointed and notified to the contractor to act in replacement of the
Engineer) who is responsible for supervising the Contractor, administering the Contract,
certifying payments due to the Contractor, issuing and valuing Variations to the
Contract, awarding extensions of time, and valuing the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to the
site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter of
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified in the
Contract Data. The Intended Completion Date may be revised only by the Engineer by
issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical,
electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the Contract
and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor
shall commence execution of the works. It does not necessarily coincide with any of the
Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the
Contractor to carry out a part of the work in the Contract which includes work on the Site.
Temporary Works are works designed, constructed, installed, and removed by
the Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works. The
Works are what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male also
means female or neuter and the other way around. Heading have no significance.
Words have their normal meaning under the language of the Contract unless
specifically defined. The Engineer will provide instructions clarifying queries about
Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references to the
Completion Date and Intended Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following order of
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in the
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual
matters between the Employer and the Contractor in the role representing the
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
5.1 The Engineer may delegate any of his duties and responsibilities to other people
after notifying the Contractor and may cancel any delegation after notifying the
6. Communications
6.1 Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is delivered
(in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in
contract data, with the approval of the engineer but may not assign the Contract
without the approval of the Employer in writing. Subcontracting shall not alter the
Contractor’s obligations. Sub-contracting of supply or specific items of work
is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for the
part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public
authorities, utilities and the Employer between the dates given in the Schedule of
other Contractor. The Contractors shall as refer to in the Contract Data, also
provide facilities and services for them as described in the Schedule. The
employer may modify the schedule of other contractors and shall notify the
contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Contract Data to carry out the functions stated in
the Schedule or other personnel approved by the Engineer. The Engineer will
approve any proposed replacement of key personnel only if their qualifications,
abilities, and relevant experience are substantially equal to or better than those of
the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of the
Contractor Staff or his work force stating the reasons the Contractor shall ensure
that the person leaves the Site within seven days and has no further connection
with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks,
and the Contractor carries the risks which these Contracts states are Contractors
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as they
directly affect the execution of the Works, the risks of war, hostilities, invasion, act
of foreign enemies, rebellion, revolution, insurrection or military or usurped power,
civil war, riot commotion or disorder (unless restricted to the Contractor’s
employees), and contamination from any nuclear fuel or nuclear waste or
radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and
death which arise during and in consequence of the performance of the Contract
other than the excepted risks are the responsibility of the Contractor.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects Liability
Period, in the amounts and deductibles stated in the Contract data for the
following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the
Engineer for the Engineer’s approval before the Start Date. All such insurance
shall provide for compensation to be payable in the types and proportions of
currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates required,
the Employer may affect the insurance which the Contractor should have provided
and recover the premiums the Employer has paid from payments otherwise due to
the Contractor or, if no payment is due, the payment of the premiums shall be a
13.4 Alterations to the terms of an insurance shall not be made without the approval of
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation reports
referred to in the Contract Data, supplemented by any information available to the
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and
shall carry out the Works in accordance with the programme submitted by the
Contractor, as updated with the approval of the Engineer, and complete them by
the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed
Temporary works to the Engineer, who is to approve them if they comply with the
Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design of
the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary or
permanent work are subject to prior approval by the Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to notify
the engineer of such discoveries and carry out the Engineer’s instructions for
dealing with them.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the
Employer is deemed to have delayed the start of the relevant activities and this
will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is not
handed over to the Contractor, then contractor/ Employer may fore-close the
contract. Contractor/Employer has to foreclose the work within 30 days after
lapse of 25%-time limit and after 30 days foreclosure option will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any place
where materials or plants are being manufactured/ fabricated/ assembled for the
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to works
which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts
and records relating to the performance of the Contractor and to have them
audited by auditors appointed by the Employer, if so required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to #Chief Officer(Higher
Authority)within 14 days of the notification of the Engineer's decision. If the issue
is not resolved, any party can refer the matter for conciliation within 15 days from
the decision given by the #Chief Officer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the #Chief Officer, both the parties have to refer to the Regional
Commissioner Nagarpalika concern for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with
the decision of the #Chief Officer, both the parties have to refer to the
#ACEO GUDM, Gandhinagar for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer the
dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the
Contractor fails to refer a claim / dispute to the Higher Authority within 14 days of
the notification of the Engineer's decision, the Contractor shall not be entitled to
any additional payment/claim if he doesn’t follow the above sequence in stipulated
time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
26. Replacement of Dispute Review Expert
26.1 Should the Dispute Review Expert resign or die, or should the Employer and the
Contractor agree that the Dispute Review Expert is not fulfilling his functions in
accordance with the provisions of the Contract, a new Dispute Review Expert will
be jointly appointed by the Employer and the Contractor. In case of disagreement
between the Employer and the Contractor, within 30 days, the Dispute Review
Expert, shall be designated by the Appointing Authority designated in the Contract
Data at the request of either party, within 14 days of receipt of such request.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods, arrangements
orders, and timing for all the activities in the works along with monthly cash flow
27.2 An update of the Programme shall be a programme showing the actual progress
achieved on each activity and the effect of the progress achieved on the timing of
the remaining work including any changes to the sequence of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated programme
at intervals no longer than the period stated in the Contract data. If the Contractor
does not submit an updated programme within this period, the Engineer may
withhold the amount stated in the Contract data from the next payment after the
date on which the overdue programme has been submitted.
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the
Engineer again at any time. A revised programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation Event
occurs or a Variation is issued which makes it impossible for completion to be
achieved by the Intended Completion Date without the Contractor taking steps to
accelerate the remaining work and which would cause the Contractor to incur
additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended
Completion Date within 35 days of the Contractor asking the Engineer for a
decision upon the effect of a compensation event or Variation and submitting full
supporting information. If the Contractor has failed to give early warning of a delay
or has failed to cooperate in dealing with a delay, the delay by this failure shall not
be considered in assessing the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the contractor
for extension of Intended Completion Date refer to the Employer his decision. The
employer shall in not more than 21 days communicate to the engineer the
acceptance or otherwise of the Engineer’s decision. If the employer fails to give
his acceptance, the Engineer shall not grant the extension and the contractor may
refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any
activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to review
the plans for remaining work and to deal with matters raised in accordance with
the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the Employer.
The responsibility of the parties for actions to be taken is to be decided by the
Engineer either at the management meeting or after the management meeting
and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific likely
future events or circumstances that may adversely affect the quality of the work,
increase the Contract price or delay the execution of works. The Engineer may
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
require the contractor to provide an estimate of the expected effect of the future
event or circumstance on the contract price and completion date. The estimate is
to be provided by the Contractor as soon as reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided or
reduced by anyone involved in the work and in carrying out any resulting
instruction of the Engineer.
C. QUALITY CONTROL
# 33. Identifying Defects/ Defect liability period
33.1 : Defect liability period : The contractor shall be responsible to make good and
remedy at his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of completion. The
Engineer in charge shall give the contractor a notice in writing about the defects
and the contractor shall make good the same within 15 days of receipt of the
notice. In the case of failure on the part of the contractor, the Engineer- in-charge
may rectify or remove or re-execute the work at the risk & cost of the contractor.
The Engineer-in-charge shall be entitled to appropriate the whole or any part of
the amount of security deposit towards the expenses, if any, Incurred by him in
rectification, removal or re-execution. The Defects Liability period shall be as
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall be
3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount
put tender), the period shall be 36 (Thirty Six) months from the certified date
of completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be
Months from the certified date of completion which should include three
(d) For original building works the defect liability period will be 4 years or elapse of
monsoon period following date of possession of building taken over by user
agency following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be
treated as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular
No.TNC/10/2016/Clause 17A (Correction/(1)C Dated 12/05/2016]
33.2 Free maintenance guarantee period for works of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year
from the date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee from the
certified date of completion. During this period the contractor shall visit the site
every six months along with the concerned Section Officer / Deputy Chief
Officer and will examine the work already carried out in this contract like road
work, jungle cutting, side shoulders, side gutter, road furniture, patta etc. and
will prepare Km. wise inspection report duly signed by all concerned and any
defect observed shall be done within 15 days by the contractor at his risk and
cost as per the direction of Engineer in charge. The contractor needs to do
videography of these visits and require to submit at the time of release of
FMG. If B.T. the surface during the maintenance period of 4 years is worn out
then agency shall have to provide renewal coating as per tender item as
directed by the Engineer-in- charge. The amount equivalent to 5% of each
running bill shall be withheld and will be released after the free maintenance
guarantee period (i.e. 4 years) is over.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
However, this amount shall be released against fixed deposit or bank
guarantee pledged in the name of Chief Officer after completion certificate of
work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates under
no circumstances shall exceed the allowable limit set forth in the relevant
clause for the material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall be
withheld till the miscellaneous items like earthwork in embankment / cutting for
side shoulders, side gutters, kilometer / indicator / guard stones, sign boards
etc. are completed in all respect by the contractor. After completion of the
miscellaneous items, the above said 2% withheld amount shall be released.
(Govt. of Gujarat's G.R. No.: TNC-10-2013-3(Part-3)/C, Dtd. 13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be done as
per Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work costing
more than Rs. 5.00 Crore.
(4) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate equipment.
Till the setting up of adequate laboratory is completed & reported of this to the
engineer (subject to due verification by engineer’s representative) by
contractor in writing, Rs.2,00,000/- shall be withheld. The qualified quality
Engineer shall be deployed exclusively for this contract by the contractors. If
quality Engineer is not deployed by contractor within one month after the date
of work order, the amount equivalent to Rs.20,000 per month shall be
recovered till the actual deployment of quality engineer. The amount so
recovered towards the deployment of quality engineers shall not be refunded.
(5) Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill is paid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own risk
and cost, the existing lane(s) of the road so that the traffic worthiness and
safety thereof are at no time materially inferior as compared to their condition
10 (ten) days prior to the date of the Agreement, and shall undertake the
necessary repair and maintenance works for this purpose; provided that the
Contractor may, at his cost, interrupt and divert the flow of traffic if such
interruption and diversion is necessary for the efficient progress of works
and conforms to Good Industry Practice; provided further that such
interruption and diversion shall be undertaken by the Contractor only with the
prior written approval of the Chief Officer which approval shall not be
unreasonably withheld. For the avoidance of doubt, it is agreed that the
Contractor shall at all times be responsible for ensuring safe operation of the
33.3 The Engineer shall check the Contractor’s work and notify the Contractor of any
defects that are found. Such checking shall not affect the Contractor’s
responsibilities the Engineer may instruct the Contractor to search for a Defect
and to uncover and test any work that the Engineer considers may have a Defect.
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that it
does, the Contractor shall pay for the test and any samples. If there is no defect
the test shall be a Compensation Event.
34.2 #1% of the amount of work done should be deducted from R.A. Bill of the
contractor for testing the quality of material workmanship, irrespective of actual
34.3 Agency has to establish testing laboratory on site for the various test to be carried
out in the work for this purpose agency shall construct a pukka laboratory building
with all facility on site at location specified by the engineer in charge.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end of
the defects Liability Period, which begins at Completion and is defined in the
contract data. The Defects Liability Period shall be extended for as long as
Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified
defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is
paid for the quantity of the work done at the rate in the Bill of Quantities for each
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the
original specifications , drawings, designs and instructions that may appear to him
to be necessary or advisable during the progress of the work and the contractor
shall be bound to carry out the work in accordance with any instruction in this
connection which may be given to him in writing signed by the Engineer and such
alteration shall not invalidate the contract and any additional work which the
contractor may be directed to do in the manner above specified as part of the
work shall be carried out by the contractor on the same conditions in all respects
on which he agreed to do the main work and at the same rate as are specified in
the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the tender by
more than 10%, the contractor will be paid for the quantity in excess of 10%, at
the rate entered in the SOR of the year during which the excess in quantity is first
39.1 All Variations shall be included in updated programmes produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate is
specified in this contract, then such class of work shall be carried out as under.
(i) At the rate derived from the item within the contract which is comparable to the
one involving additional or altered class of work; where there are more than one
comparable items, the item of the contract which is nearest in comparison with
regard to class or classes of the work involved shall be selected and the decision
of the Chief Officer as to the nearest comparable item shall be final and binding
on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall
be carried out at the rate entered in the Schedule of Rates of the division for the
year in which the tender was received, increased or decreased by the percentage
by which the tender amount is more or less as compared to the amount arrived at
the rates in the “Schedule of Rates” of the Division in the year in which the tender
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
was received. If the Schedule of rates of the Division does not contain all the
items, the percentage increase or decrease of the tender shall be calculated
considering such items which were included in the “Scheduled Rates” of the
division for the year and for materials consumed on such item the rate to be
charged would be the basic rate taken into account for fixing the rate in S.O.R.
referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work
shall be carried out at the rate decided by the competent authorities on the basis
of detailed rate analysis after hearing the contractor before a Committee of two
Chief Officers stationed at the same place or the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule of
Rates” of the Division is ordered to be carried out before the rate is agreed upon,
then the contractor shall within seven days of the date of receipt by him of the
order to carry out the work, inform the Engineer-in-charge of the rate, which it is
his intention to charge for such class of work and if the Engineer in charge does
not agree to this rates, he shall by notice in writing be at liberty to cancel his order
to carry out such class of work and arrange to carry it out in such manner as he
may consider it advisable, provided always that if the contractor shall commence
work or incur any expenditure in regard thereof before the rates shall have been
determined as lastly herein before mentioned, then in such cases he shall only be
entitled to be paid in respect of the work carried out or expenditure incurred by
him prior to the date of the determination of the rate as aforesaid according to
such rate or rates as shall be fixed by the Engineer-in-charge. In the event of the
dispute, the decision of the Chief Officer of the Circle shall be final.
Where, however, the work is to be executed according to the designs,
drawings and specifications recommended by the contractor and accepted by the
competent authority, the alternation above referred to shall be within the scope of
such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the
proportion that the increase in the cost occasioned by alterations bears to the cost
of the original work and the certificate of the Engineer-in-charge as to such
proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer with an
updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the estimated
value of the work completed less the cumulative amount certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days and
certify the amount to be paid to the Contractor after taking in to account any credit
or debit for the month in question in respect of materials for the works in the
relevant amounts and under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the items
in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or reduce
the proportion of any item previously certified in any certificate in the light of later
43.1 Payments shall be adjusted for deductions for advance payments, retention, other
recoveries in terms of the contract and taxes at source, as applicable under the
law. The Employer shall pay the Contractor the amounts certified by the Engineer
within 28 days of the date of each certificate.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
43.2 No Payment of GST (prevailing rates) on the amount payable under the contract
to the Contractor will be made by the Employer. it is the responsibility of the
contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be paid
by the Employer and shall be deemed covered by other rates and prices in the
44. Compensation events
44.1 The following are compensation Events unless they are caused by the Contractor:
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being completed
beyond the Intended Completion Date then Authority will approve EOT with
eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes including GST
prevailing on due date of bid submission except GST. However, any subsequent
changes in the tax structure by Government after due date of bid submission will
be compensated (+/-) on availability or submission of actual documentation.
Contractor will have to intimate Engineer regarding changes occurred in the tax
structure after bid submission. If the contractor fails to provide such information
and if any financial obligation may arise due to change in tax structure, same will
be recovered from the contractor.
45.2 The rate are inclusive of GST, so GST will not be paid separately on the bills. it is
the responsibility of the contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of
labour, materials, fuels and lubricants in accordance with the following principles
and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date given in
the contract data up to end of the initial intended completion date or
extensions granted by the Engineer and shall not apply to the work carried out
beyond the stipulated time for reasons attributable to the contractor.
(b) The price adjustment shall be determined during each month from the formula
given in the contract data.
(c) Following expressions and meanings during to the work done during each
R = Total value of work done during the month. It would include the amount of
secured advance granted, if any, during the month less the amount of secured
advance recovered, if any during the month. It will exclude value for works
executed under variations for which price adjustment will be worked
separately based on the terms mutually agreed.
47.2 To the extent that full compensation for any rise or fall in costs to the contractor is
not covered by the provisions of this or other clause in the contract, the unit rates
and prices included in the contract shall be deemed to include amounts to cover
the contingency of such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the proportion
stated in the Contract Data until Completion of the whole of the Works.
48.2 On Completion of the whole of the Works half the total amount retained is repaid
48.2 On Completion of the whole of the Works half the total amount retained is repaid
to the Contractor and half when the Defects Liability Period has passed and the
Engineer has certified that all Defects notified by the Engineer to the Contractor
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
before the end of this period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention money
with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted
by the Employer under the provision of this clause, Employer shall consider the
said request of the Contractor provided that the refund hereunder shall be made
in tranches of not less than 1% (One Percent) of the Contract Price and
Contractor furnishes an irrevocable and unconditional Bank guarantee for an
equal amount substantially in the format of Bank Guarantee for Performance
Guarantee enclosed with SBD and valid up to 60 day beyond the scheduled /
extended Defects Liability Period. On completion of the whole works, the
contractor has however an option to submit a fresh irrevocable and unconditional
Bank Guarantee for an amount equal to 5% of the total value of work executed
substantially in the format of Bank Guarantee for Performance Guarantee
enclosed with SBD and valid up to 60 days beyond the Defect Liability Period and
yet refund the Retention Money Bank Guarantee submitted for refund of Retention
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per day
stated in the Contract Data for each day that the Completion Date is later than the
Intended Completion Date (for the whole works or the milestone as stated in the
contract data). The total amount of liquidated damages shall not exceed the
contract data). The total amount of liquidated damages shall not exceed the
amount defined in the Contract Data. The Employer may deduct liquidated
damages from payment due to the Contractor. Payment of liquidated damages
does not affect the Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have been
paid, the Engineer shall correct any overpayment of liquidated damages by the
Contractor by adjusting the next payment certificate. The Contractor shall not be
entitled for any interest on the over payment calculated from the date of payment
to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in the
tender, then the contractor shall pay to the employer the relevant sum stated in
the Contract Data as Liquidated damages for such default and not as penalty for
everyday or part of day which shall elapse between relevant time for completion
and the date stated in the taking over certificate of the whole of the works on the
relevant section, subject to the limit stated in the contract data.
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages from any monies due or to become due to
the contractor. The payment or deduction of such damages shall not relieve the
contractor from his obligation to complete the works on from any other of his
obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable any
Section, a Taking Over Certificate has been issued for any part of the Works or of
a Section, the liquidated damages for delay in completion of the remainder of the
Works or of that Section shall, for any period of delay after the date stated in such
Taking-Over-Certificate, and in the absence of alternative provisions in the
Contract, be reduced in the proportion which the value of the part so certified
bears to the value of the whole of the Works or Section, as applicable. The
provisions of this Sub-clause shall only apply to the rate of liquidated damages
and shall not affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall pay to
the contractor a sum stated in Contract Data as bonus for every completed month
but subjected to maximum amount as stated in Contract Data; which shall
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
elapse between the date of completion of all items of works as stipulated in the
contract, including variations ordered by the Engineer and the time prescribed in
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with time limit
of the works is equal or more than 6 months. The bonus would be paid as under
% of Time Saved % of Initial Contract Price
entitled for Bonus
Less than 10% 0%
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be Recorded
in writing) to the Contractor of the amounts stated in the Contract Date by the date
stated in the Contract Date, against provision by the Contactor of an
Unconditional Bank Guarantee in a form and by a bank acceptable to the
Employer in amounts and currencies equal to be at least 110% of the advance
payment. The guarantee shall remain effective until the advance payment has
been repaid, but the amount of the guarantee shall be progressively reduced by
the amounts repaid by the Contractor. The Mobilization advance would be
deemed as interest bearing advance at an interest rate of 10 % to be
compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment, plant
and Mobilization expenses required specifically for execution of the Works. The
Contractor shall demonstrate that advance payment has been used in this way by
supplying copies of invoices or other documents to the engineer.
51.3 The advance payment shall be repaid by deduction proportionate amount from
payments otherwise due to the Contractor, following the schedule of completed
percentages of the Works on a payment basis. No account shall be taken of the
advance payment or its repayment in assessing valuations of work done,
variations, price adjustments, Compensation Events, or Liquidated damages.
51.4 Secured Advance
The Engineer shall make advance payment in respect of materials intended for but
not yet incorporated in the works in accordance with conditions stipulated in the
52.1 The performance Security (including additional security for unbalanced bids) shall
be provided to the Employer no later than the date specified in the Letter of
Acceptance and shall be issued in an amount and form and by a bank or surety
acceptable to the Employer, and denominated in Indian Rupees. The performance
Security shall be valid until a date 60 days from the date of expiry of Defects
Liability Period and the additional security for unbalanced bids shall be valid until
a date 28 days from the date of issue of the certificate of completion.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages arises
from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion of
the works and the Engineer will do so upon deciding that the work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the total
amount that the Contractor considers payable as full and final settlement of all
claims under the Contract for items before the end of the Defects Liability Period.
The Engineer shall issue a Defect Liability Certificate and certify any final payment
that is due to the Contractor within 56 days of receiving the Contractor's account if
it is correct and complete. If it is not, the Engineer shall issue within 56 days a
schedule that states the scope of the corrections or additions that are necessary.
If the Final Account is still unsatisfactory after it has been resubmitted, the
Engineer shall decide on the amount payable to the Contractor and issue a
payment certificate, within 56 days of receiving the Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses
and savings in final account is observed, the Engineer/Employer shall be at liberty
to restrict the final payment of BOQ items to the lowest amount evaluated of the
bids considering the final quantities and the rates quoted including the rebates if
any. Payment of variation items shall however be made at the rates approved by
the Employer, within 90 days from the physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are required, the
Contractor shall supply them by the dates stated in the Contract data.
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates
stated in the Contract data, or they do not receive the Engineer’s approval, the
Engineer shall withhold the amount stated in the Contract Data from payments
due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the
1. The contractor stops work for 28 days when no stoppage of work is shown on
the current programme and the stoppage has not been authorized by the
2. The Engineer instructs the Contractor to delay the progress of the Works and
the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation
other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it within a
reasonable period of time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of days
for which the maximum amount of liquidated damages can be paid as defined
in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering,
giving, receiving or soliciting of anything of value to influence the action of a public
official in the procurement process or in contract execution. “Fraudulent practice”
means a misrepresentation of facts in order to influence a procurement process or
the execution of a contract to the detriment of the borrower, and includes collusive
practice among Bidders (prior to or after bid submission) designed to establish bid
prices at artificial non-competitive levels and to deprive the Borrower of the
benefits of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above, the
Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by the
Contractor, the Engineer shall issue a Certificate for the value of the work done
less advance payments received up to the date of the issue of the
certificate, less other recoveries due in terms of the contract, less taxes due to
deducted at source as per applicable law and less the percentage to apply to the
work not completed as indicated in the Contract data. Additional Liquidated
Damages shall not apply. If the total amount due to the Employer exceeds any
Damages shall not apply. If the total amount due to the Employer exceeds any
payment due to the Contractor the difference shall be a debt payable to the
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a
certificate for the value of the work done, the cost of balance material brought by
the contractor and available at site, the reasonable cost of removal of equipment,
repatriation of the Contractor’s personnel employed solely on the works, and the
Contractor’s cost of protecting and securing the Works and less advance
payment received up to the date of the certificate, less other recoveries due in
terms of the contract and less taxes due to deducted at source as per applicable
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works are
deemed to be property of the Employer, if the Contract is terminated because of a
Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event entirely
outside the control of either the Employer or the Contractor the Engineer shall
certify that the Contract has been frustrated. The Contractor shall make the Site
safe and stop work as quickly as possible after receiving this certificate and shall
be paid for all work carried out before receiving it and for any work carried out
afterwards to which commitment was made.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make his
own arrangements for the engagement of all staff and labour, local or other, and
for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a
return in detail, in such form and at such intervals as the Engineer may prescribe,
showing the staff and the numbers of the several classes of labour from time to
time employed by the Contractor on the site and such other information as the
Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor
shall abide at all times by all existing labour enactments and rules made
thereunder, regulations, notification and bye laws of the State or central
Government or local authority and any other labour law (including rules),
regulations, bye laws that may be passed or notifications that may be issued
under any labour law in future either by the State or the Central Government or
the local authority. Salient features of some of the major labour laws that are
applicable to the construction industry are given below. The Contractor shall keep
the Employer indemnified in case any action is taken against the Employer by the
competent authority on account of contravention of any of the provisions of any
Act or rules made thereunder, regulations or notifications including amendments.
If the Employer is caused to pay or reimburse, such amounts as may be
necessary to cause or observe, or for observance of the provisions stipulated in
the notifications/bye laws/Acts/Rules/regulations including amendments, if any, on
the part of the Contractor, the Engineer/employer shall have the right to deduct
any money due to the Contractor including his amount of performance security.
The Employer/Engineer shall also have the right to recover from the Contractor
any sum required or estimated to be required for making good the loss or damage
suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be
treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE
TO ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS
A) Workmen Compensation Act 1923 :- The Act provides for compensation in case of
injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under the Act
on satisfaction of certain conditions on separation if an employee has completed
years service or more on death, the rate of 15 days wages for every completed year
of service. The Act is applicable to all establishments employing 10 or more
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The benefits
payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other benefits to
women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970 : The Act provides for certain
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
welfare measures to be provided by the Contractor to contract labour and in case the
Contractor fails to provide, the same are required to be provided, by the Principal
Employer by Law. The principal Employer is required to take Certificate of
Registration and the Contractor is required to take license from the designated
Officer. The Act is applicable to the establishments or Contractor of Principal
Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if the
employment is a scheduled employment. Construction of Building, Roads, Runways
are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to be
paid, when it will be paid and what deductions can be made from the wages of the
H) Equal remunerations Act 1979 :- The Act provides for payment of equal wages for
work of equal nature to Male and Female workers and for not making discrimination
against female employees in the matter of transfer, training and promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual bonus
subject to a minimum of 8.33% of wages and maximum of 20 % of wages to
employees drawing Rs. 3500/- per month or less. The bonus to be paid to
employees getting Rs, 2500/- per month or above Rs. 3500/- per month shall be
worked out by taking wages as Rs. 2500/- per month only. The Act does not
apply to certain establishments. The newly set-up establishments are exempted for
five years in certain circumstances. Some of the State Governments have reduced
the employment size from 20 to 10 for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and procedure for
resolutions of Industrial disputes, in what situations a strike or lock-out becomes
illegal and what are the requirements for laying off or retrenching the employees or
closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced by some
of the State and Central Government to 50). The Act provides for laying down rules
governing the conditions of employment by the Employer on matters provided in the
Act and get the same certified by the designated Authority.
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade unions
of workmen and employers. The Trade Unions registered under the Act have given
certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :- The Act prohibits
employment of children below 14 years of age in certain occupations and process
and provides for regulation of employment of children in all other occupations and
processes. Employment of Child labour is prohibited in Building and Construction
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions of
service) Act 1979:- The Act is applicable to an establishment which employs 5 or
more inter-state migrant workmen through an intermediary (who has recruited
workmen in one state for employment in the establishment situated in another
state).The inter-state migrant workmen, is an establishment to which this Act
becomes applicable, are required to be provided certain facilities such as housing,
medical aid, traveling expenses from home upto the establishment and back, etc.
O) The Building and Other Construction workers (Regulation of employment and
Conditions of Service) Act 1996 and the Cess Act of 1996:- All the
establishments who carry on any building or other constructions work and employ
or more workers are covered under this Act.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
All such establishments are required to pay cess at the rate not exceeding 2% of the
cost of construction as may be modified by the government. The Employer of the
establishment is required to provide safety measures at the Building or construction
work and other welfare measures, such as canteens, First Aid facilities, Ambulance,
Housing accommodations for workers near the workplace etc. The Employer to
whom the Act applies has to obtain a registration certificate from the Registering
Officers appointed by the Government.
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans before
setting up a factory, health and safety provisions, welfare provisions, working hours,
annual earned leave and rendering information regarding accidents or dangerous
occurrences to designated authorities. It is applicable to premises employing
persons or more with aid of power or 20 or more persons without the aid of power
engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent authority as
per rule. The royalty charges paid shall be borne by the contractor and shall not be
reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from time to
time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management plan for
best energy use, waste management, the reduction of pollution as in EMS
(Environmental Management system)ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision was
wrongly taken, the decision shall be referred to #Chief Officer (Higher Authority)
within 14 days of the notification of the Engineer's decision. If the issue is not
resolved, any party can refer the matter for conciliation within 15 days from the
decision given by the #Chief Officer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the #Chief Officer, both the parties have to refer to the # Regional
Commissioner Nagarpalika concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with
the decision of the Chief Officer, both parties have to refer to the #ACEO
GUDM, Gandhinagar for the conciliation process.
If the dispute is not resolved through the conciliation process, contractor
may refer the dispute to Gujarat Public Works Contract Dispute Arbitration
Tribunal. If the Contractor fails to refer a claim / dispute to the Higher Authority
within 14 days of the notification of the Engineer's decision, the Contractor
shall not be entitled to any additional payment/claim if he doesn’t follow the
above sequence in stipulated time. However, during such period, he would not
stop the work in any case.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Item marked “N/A” do not apply to this Contract. Clause Reference With
1. The Employers is [CL.1.1]
Name : Chief Officer Limbadi Nagarpalika
Address: Nagar Seva Sadan – Limbadi
Name of authorized Representative (will be intimated later)
2. The Engineer is ………………………
Name of Authorized Representative: …………………………
3. The Defects Liability Period is 3 years from the date of [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the Notice to [CL.1.1]
proceed with the work.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
6 Months after start of work with the following milestones:
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start date
Percentage of work
Mile stone Time Time in days
6. The Site is located at Limbadi town [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
8. The works consist of Supply, installation, testing and commissioning of [CL.1.1]
pumping machinery for water supply and drainage at different head works
in Limbadi Nagarpalika area _____ Scheme for project, District : Limbadi
with items as per B.O.Q. The works shall, inter alia, include the following, as
Specified or as directed:
Any Other Items as required to fulfill all contractual obligations as per the Bid documents.
10. The following documents also form part of the Contract [CL.2.3(9)]
11. The law which applies to the Contract is the law of Union of India [ CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting [CL.3.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death is Rs. 5 [CL.13]
lakhs per occurrence with the number of occurrences limited to four. After each
occurrence, the contractor will pay an additional premium necessary to make
insurance valid for four occurrences always.
17. Site Investigation report [CL.14]
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
18. The Site Possession dates shall be…………………………. [CL.21]
19. The period for submission of programme for approval of the engineer shall be 21 [CL.27.1]
days from the issue of Letter of Acceptance.
20. The period between program updates will be 90 days. [CL27.30]
21. The amount to be withheld for late submission of an updated programme [CL.27.30]
shall be Rs One (1) lakhs.
22. The following events shall also be Compensation Events [CL.44]
Substantially adverse ground conditions encountered during the
course of execution of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently.
(ii) Significant changes in classification of soil requiring additional
mobilization by the contractor, e.g. ordinary soil to rock excavation.
(iii) Removal of unsuitable material like marsh, debris dumps, etc. not caused
by the contractor.
(iv) Artesian condition
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious structures, monuments
interfering with the works.
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that
commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as
indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm),
such that the gross % weight of the components shall remain as
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due
to labour shall be paid in accordance with the following
VL = Increase or decrease in the cost of work during the
month under consideration due to changes in rates for
L0 = The consumer price index for industrial workers for the
State on 28 days preceding the scheduled date of
opening of technical Bids as published by Labour
Bureau, Ministry of Labour, Government of India
Li = The consumer price index for industrial workers for the
State for the month under consideration as published
by the Labour Bureau, Ministry of Labour,
Government of India.
Pl = Percentage of labor component of the work.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost
of cement procured by the contractor
Vc = Increase or decrease in the cost of work during the
month under consideration due to changes in
rates for cement.
C0 = The all India wholesale price index for Ordinary
Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as
published by the Office of the Economic
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Ci = The all India average wholesale price index for Ordinary
Portland Cement for the month under consideration as
published by Office of the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by
the contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products
Rebars) on 28 days preceding the date of opening of Bids as published by the
Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long
Products Rebars) for the month under consideration as published by
Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long
products Rebars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid
in accordance with the following formula
Vb = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the
nearest centre on the day 28 days prior to the scheduled date of
opening of technical bid.
Bi = The official retail price of bitumen of IOC depot at the nearest
centre for the 15th day of the month under consideration.
Pb = Percentage of bitumen component of the work
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the
existing consumer pumps of IOC at the nearest centre on the day
prior to the date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps
of IOC at the nearest centre for the 15th day of the month of the
under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil
has been chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and
Machinery spare procured by the Contractor shall be paid in
accordance with the following formula
Vp= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer
of machinery for mining, quarrying and Construction for the
month under consideration as published Office of the Economic
Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and
parts has been chosen to represent the Plant and Machinery Spares
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials
other than cement, steel, bitumen and POL procured by the
contractor shall be paid in accordance with the following formula
Vm = Increase or decrease in the cost of work during the month
under consideration due to change in rates for local materials other
than cement, steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on
days preceding the scheduled date of opening of technical Bids, as
published by the Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Mi= The All India wholesale price index (all commodities) for the
month under consideration as published by the Office of the
Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Pm = Percentage of local material components (other than cement,
steel, bitumen and POL) of the work.
The following percentage will govern the price adjustment for the
entire contract:
6. Plant & Machinery Spares Pp………………………….2%
7. Other Materials – Pm…………………………………….55%
25. The proportion of payments retained (retention money) shall be 6% {CL.
48} from each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for For Whole of work {CL.49}
delay in completion of works (1/2000)th of the Initial contract
price, rounded off to the nearest
Thousand, per day. For sectional
Completion (wherever specified In
item 6 of Contract data) (1/2000)th of
initial contract price for #5 km
Section, rounded off to the nearest
thousand per day.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
27. Maximum limit of liquidated damages 10 percent of the Initial {CL. 49}
For delay in completion work Contract Price rounded off to
the nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
completion of work shall be given
as per CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract {CL.
50} Completion of work Price
30. The amount of the advance payment are: {CL. 51 & 52}
#Nature of Advances Amount (Rs.) Conditions
to Be fulfilled
i Mobilization 10% of the contract On submission of
unconditional Price Bank Guarantee. (to be drawn
before the end of 20% of the
contract period). The contractor
may furnish four bank
guarantees of 2.5 % of each
valid for the full period.
ii Equipment 90% for new and 50% of After equipment is brought to site
depreciated value for old (provided the Engineer is satisfied
equipment. Total amount will That the equipment is required for
equipment. Total amount will That the equipment is required for
be subject to a maximum of performance of the contract) and on
5% of the Contract Price submission of unconditional Bank
amount of advance
iii Secured Deleted
Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after
fulfillment of the above conditions).
31. Repayment of advance payment for mobilization and equipment {CL. 51.3}
The advance loan shall be repaid with percentage deduction from the interim
payments certified by the Engineer under the Contract. Deduction shall
commence in the next Interim Payment Certificate following that in which
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
total of all such payments to the Contractor has reached not less than
percent of the Contract Price or 6 (six) months from the date of payment of
first installment of advance, whichever period concludes earlier, and shall be
made at the rate of 20 percent (collectively for both Mobilization Advance
and Equipment Advance) of the amounts of all Interim Payment Certificate
until such time as the loan has been repaid, always provided that the loan
shall be completely repaid prior to the expiry of the original time for completion
pursuant to Clause 17 and
33. The securities shall be for the following minimum amounts equivalent {CL.
52} As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to
be decided after evaluation of the bid) as additional security in terms of ITB
The standard form of Performance security acceptable to the Employer shall
be an unconditional Bank Guarantee of the type as presented in Section 8 of
the Bidding Documents.
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
35. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL.
58} are required within 28 days of the issue of certificate of completion of the
whole or section of the work, as the case may be.
36. The amount to be withheld for failing to supply “as built” drawings {CL. 58} by
the Date required is Rs Two (2) Lacs.
37. The following events shall also be fundamentals breach of contract:
{CL.59.2} “The Contractor has contravened Sub- clause 7.1 and Clause 9 of
38. The percentage to apply the value of the work not completed representing {Cl
60} the Employer’s additional cost for completing the Works shall be 20 per
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
TECHNICAL SPECIFICATION
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Description of the Works:
1. We offer to execute the Works described above and remedy any defects therein
in conformity with the conditions of Contract, specification, drawings, Bill of
Quantities and Addenda for the sum (s) of
2. We undertake, if our Bid is accepted, to commence the Works as soon as is
reasonably possible after the receipt of the Engineer’s notice to commence, and
to complete the whole of the Works in the Contact within the time stated in the
3. We agree to abide by this Bid for the period of 120 Days from the date fixed for
receiving the same, and it shall remain binding upon it and may be accepted at
any time before the expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Bid, together
with your written acceptance thereof, shall constitute a binding contract between
5. We understand that you are not bound to accept the lowest or any tender you
------- duly authorized to sign bids for and on behalf of -----------------------------------
(in block capitals or typed)
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
BILL OF QUANTITIES
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to
Bidder, Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be
the actual quantities of work ordered and carried out, as measured by the
Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities, where applicable, and otherwise at
such rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set
out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities,
whether quantities are stated or not. The cost of Items against which
Contractor has failed to enter a rate or price shall be deemed to be covered by
other rates and prices entered in the Bill of Quantities (in case of Item rate
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates
and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Instructions to Bidder.
10. Vendor shall be as per GWSSB approved list .
11. If for any item vendor list is not given than vendor can be finalized by engineer in
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Item Description Qty Unit Rate Amount
1 Supply, installation, testing & commissioning of
Sewage Submersible Non clog type Pump
suitable for working on 3 phase, , 50 Hz+or -
3%, 415V +or - 3%, AC Supply 1450 RPM
syncronize speed with With 3 core flat copper
cable from pump to starter cable and
terminations.all suport ,clamps, pipe fittings
along with mechanical seal, bearing bush,
strainer etc complete set and following 2.0 No. 3,95,886.00
MOC.(Including all required electrical
components & acessories) casing CI,Impeller
SS CF8M ,wearing ring and bearing bush
bronze, TC mechanical seal, CS/SS bearing,
SS shaft with sleev, SS strainer and MS motor
body including transportion , loading and
unloading charges. 1.1: Discharge
cum/hour , 18 m head 25 HP, 18KW
Discharge 12 cum/hour , 10 m head 3 HP,
2 Supply, installation, testing & commissioning of
submerged centrifugal pumpsets (water
immersed, dry air filled, class F;insulated
TEWC motor integrally mounted on volute
casing pumpsets for water duty, 3-phase,
50±3% Hz, 415±10% V along with suitable
foundation/installation device with cable length
from pumps to panels & of following Material of
Construction: Impeller: CF8M, Casing: C.I. FG
260, Wearing Ring: SS, TC mechanical seal,
CS/SS bearing, SS shaft with sleeve, SS
strainer & MS motor including transportion
, loading and unloading charges.Discharge
cum/hour , 32 m head 54HP , 40 KW 3 No
3 Installation, testing & commissioning for 54 HP
pump set with suitable foundation/installation 3.0 No. 34,913.00
device with cable length from pumps to panels
4 Supply, installation, testing & commissioning of
horizontal split casing centrifugal pump motor
set of specified duty parameters & guaranteed
efficiency of following MOC with specified
capacity, horizontal foot mounted TEFC
squirrel cage induction motor (with minimum IE-
3 efficiency class), working on three phase AC
supply with 50 Hz ± 3%, 415 V ± 10%, rated 150.0 KW 8,206.00
speed 1450 RPM along with fabricated MS
base frame, coupling, coupling guard,
foundation bolts etc. as per relevant IS.M.O.C.:
Impeller & Wearing Rings: CF8M, Casing: Cast
Steel WCB , Shaft: SS 410, Shaft Sleeve: SS
410, Mechanical Seal (Above 30 kW), Base
Frame: MS.including transportion , loading and
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Item Description Qty Unit Rate Amount
unloading charges.4.1 :Discharge
cum/hour , 35 m head 101 HP, 75 KW 2 No
Discharge 380 cum/hour , 35 m head 74 HP,
5 Control panel board :Supply, installation, testing
& commissioning of Auto transformer starter
suitable for local & remote pump control
application consisting of auto transformer
(vacuum impregnated, air cooled having three
(3) tappings at 50%, 65% and 80%), incomer
mccb / mpcb, overload relay and contactors as
per type ii coordination including digital mfm
with rs 485 communication port, analogue type
ammeter with selector switch, run hour meter,
required protective relays & control
accessories.including transportion , loading and
unloading charges.5.1:ATS from 51 to
5.2 ATS from 71 to 80 HP(for 74 HP) 2.0 No. 65,760.00
5.3 ATS from 101 to 110 HP(for 101 HP) 2.0 No. 92,906.00
6 Supply, installation, testing & commissioning of
horizontal mono submersible pump set (Drain
pump) as per IS: 14220 / 1994 & its latest
amendments of following duty parameters with
suitable submersible motor as per IS: 9283 /
1994 & its latest amendments working on
phase, 415 V ± 10%, 50 ± 3% Hz power supply,
rated speed 2900 RPM of following duty
capacity.Material of Constructions: Impeller:
High tensile brass / LTB II; Casing: CI FG 260;
Pump & Motor shaft: SS 304; Bearing Bush:
LTB III,including transportion , loading and
unloading charges.Discharge 50 Cum/hour
7 Supply, installation, testing & commissioning of
20 HP diesel pump for slurry water mud pump.
Supply of 20 HP diesel pump for slurry water
,mud self-priming mud pump all CI construction
high grade CI volute bearing. housing impeller&
wear plate alloy steel shaft ss 410 sleeve. flow 1.0 No. 2,30,000.00
capacity 158m/3 hr. @10mtr head including
require Accessories for mud pump couple drive
MS fabricated trolly base couple & couple
guard. including transportion , loading and
unloading charges etc complete.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Item Description Qty Unit Rate Amount
8 Supply, installation, testing & commissioning of
20 HP diesel pump for slurry water mud pump.
Supply of 20 HP diesel pump for slurry water
,mud self-priming mud pump all CI construction
high grade CI volute bearing. housing impeller&
wear plate alloy steel shaft ss 410 sleeve. flow 1.0 No. 2,30,000.00
capacity 33 m/3 hr. @28mtr head including
require Accessories for mud pump couple drive
MS fabricated trolly base couple & couple
guard. including transportion , loading and
unloading charges etc complete.
Total Net Amount
I/We am/are willing to carry out the work at………………….% above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work
as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of
4 GST Will not be Paid Extra.
SIGN OF CONTRACTOR SIGN OF OWNER
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
SECURITIES AND OTHER FORMS
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
BID SECURITY (BANK GUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter called
the “The Bidder”) has submitted his bid Dated ------------------------ (Date) for the
construction of ------------- (Name of Contractor hereinafter called “the Bid”)
KNOW ALL PEOPLE by these presents that We -------------------------------------------------
(name of Bank) of ---------------------------------------------- (name of country) having our
registered office at -------------------------------------------------------( hereinafter called
“the bank”) are bound unto --------------------------------------------(name of Employer)
(hereinafter called “The Employer”) in the sum of ----------------------------------------- *
for which payment well and truly to be made to the said Employer the Bank itself, his
successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this ---------------------- day of --
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder withdraws his bid during the period of Bid
validity specified in the Form of Bid;
(2) If the Bidder has been notified of the acceptance of his bid by the
Employer during the period of Bid Validity:
A Fails or refuses to execute the Form of Agreement in accordance with
the Instructions to Bidders, if required; or
B. Fails or refuse to furnish the Performance Security, in accordance with the
Instructions to Bidders; or
C. does not accept the correction of the Bid Price pursuant to Clause
27 (Correction of Errors)
We undertake to pay to the Employer up to the above amount upon
receipt of his first written demand, without the employer having to
substantiate his demand, provided that in his demand the Employer will note
that the amount claimed by him is due to him owing to the occurrence of one
or any of the three conditions, specifying the occurred conditions or
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
This Guarantee will remain in force up to and including the date----------------- **
days after the deadline for submission of Bids as such the deadline is stated in
the Instructions to Bidders or as it may be extended by the Employer, notice of
which extension (s) to the Bank is hereby waived. Any demand in respect of
this guarantee should reach the Bank not later than the above date
(Signature, name and address)
* The Bidder should insert the amount of the guarantee in words and figures
denominated in Indian Rupees. This figure should be the same as shown
in Clause 16.1(Bid Security) of the Instructions to Bidders.
**45 days after the end of the validity period of the Bid. Date should be
inserted by the Employer before the Bidding documents are issued.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
PERFORMANCE SECURITY
contractor) (hereafter called “the Contractor”) has undertaken, in pursuance
--------- (name of Contract and brief description of Works) (hereinafter called
“The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the
sum specified therein as security for compliance with his obligation in accordance
with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible
to you on behalf of the Contractor, up to a total of ------------------------------------
(amount of guarantee)* ---------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and
we undertake to pay you, upon your first written demand and without cavil or
argument, any sum or sums within the limits of ----------------------------------------
(amount of guarantee) as aforesaid without your needing to prove or to show
grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the
contractor before presenting is with the demand.
We further agree that no change or addition to or other modification of the terms
of the Contract to of the Works to be performed thereunder or of any of the
Contract documents which may be made between your and the Contractor shall
in any way release us from any liability under this guarantee, and we hereby
waive notice of any such charge, addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring of the
Defect Liabilities period.
Signature and Seal of the guarantor -----------------------------
*An amount shall be inserted by the Guarantor, representing the percentage the
Contract price specified in the Contract denominated in Indian Rupees.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
ADDITIONAL PERFORMANCE SECURITY
[Clause 34.1. (A)]
contractor) (hereafter called “The Contractor”) has undertaken, in pursuance
--------- (Name of Contract and brief description of Works) (hereinafter called “The
AND WHEREAS it has been stipulated by you in the said Contract that the
Contractor shall furnish you with a Bank Guarantee by a recognized bank for the
sum specified therein as security for compliance with his obligation in accordance
with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible
to you on behalf of the Contractor, up to a total of ------------------------------------
(amount of guarantee) ---------------------------- (in words), such sum being payable in
types and proportions of currencies in which the Contract prices is payable, and
we undertake to pay you, upon your first written demand and without cavil or
argument, any sum or sums within the limits of ----------------------------------------
(amount of guarantee) as aforesaid without your needing to prove or to show
grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the
contractor before presenting is with the demand
We further agree that no change or addition to or other modification of the terms
of the Contract to of the Works to be performed thereunder or of any of the
Contract documents which may be made between your and the Contractor shall
in any way release us from any liability under this guarantee, and we hereby
waive notice of any such charge, addition or modifications.
This guarantee shall be valid until 28 days from the project completion date.
Signature and Seal of the guarantor -----------------------------
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
BANK GUARANTEE FOR ADVANCE PAYMENT
In accordance with the provisions of the Conditions of Contract, sub-clause
51.1 (“Advance Payment”) of the above mentioned Contract, -------------------------------
------------------- (name and address of Contractor) (hereinafter called “the
Contractor”) shall deposit with--------------------------------------------------------- (name
Employer) a bank guarantee his proper and faithful performance under the
said Clause of the Contract in an amount of ------------------ (amount of Guarantee)*
We, the --------------------------------- (bank of financial institution), as instructed
by the Contractor, agree unconditionally and irrevocably to guarantee as primary
obligator and not as Surety merely, the payment to ----------------------------------------
(name of Employer) on his first demand without whatsoever right of obligation on
our part and without his first claim to the Contractor, in the amount not exceeding -
We further agree that no change or addition to or other modifications of the terms
of the Contractor or Works to be performed thereunder or of any of the Contract
documents which may be made between --------------------------------- (name of
Employer) and the Contractor, shall in any way release us from any liability under
this guarantee, and we hereby waive notice of any such change, addition or
This guarantee shall remain valid and in full effect from the date of the
advance payment under the Contract until -------------------------------------- (name of
employer) receives full repayment of the same amount from the contractor.
Signature and Seal
Name of Bank/ Financial Institution
* An amount shall be inserted by that Bank or Financial Institution representing the
amount of the Advance Payment, and denominated in Indian Rupees.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Letter of Acceptance
(Letter head paper of the Employer)
(Name and address of the Contractor)
This is to notify you that your Bid dated for execution of
the (Name of the contract and identification number, as
given in the Instructions to Bidders) for the Contract Price of Rupees
( ) (amount in words and figures) as corrected and modified in
accordance with the Instructions to Bidders* is hereby accepted by our agency.
You are requested to furnish performance security, in the form detailed in
para 34.1 of ITB for an amount equivalent to Rs. within 10 days of the
receipt of this letter of acceptance up to beyond 60 days from the date of expiry of
defects Liability period i.e. up to and the Additional Performance Security for
an amount equivalent to Rs. shall be valid beyond 28 (twenty-eight) days of
Project Completion Date i.e. up to and sign the contract,
failing which action as stated in Para 34.3 of ITB will be taken.
Yours Faithfully
Authorized Signature
Name and title of
Signatory Name of
* Delete “Corrected and” or and modified if only one of these actions applies. Delete as
corrected and modified in accordance with the Instructions to Bidders, if corrections
or modifications have not been affected.
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
Issue of Notice to proceed with the work
(Letterhead of the Employer)
(Name and address of the Contractor)
Pursuant to your furnishing the requisite security in ITB Clause
and signing of the Contract for the construction of
at a bid Price of Rs.
You are hereby instructed to proceed with the execution of the said works in
accordance with the contract documents.
Yours faithfully
(Signature, name and title of signatory
authorized To sign on behalf of Employer)
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
This agreement, made on the day of between
(name and address of Employer) (Hereinafter called “the
Employer) and (name and address of
contractor) hereinafter called “the Contractor” of the other
Whereas the Employer is desirous that the Contractor execute
Name and identification number of contract (hereinafter called “the works”) and
the employer has accepted the Bid by the Contractor for the execution and
completion of such works and the remedying of any defects therein, at a cost of
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS
1. In this Agreement, words and expression shall have the same meanings as
are respectively assigned to them in the conditions of contract hereinafter
referred to and they shall be deemed to form and be read construed as part of
this Agreement.
2. In Consideration of the payment to be made by the Employer to the contractor
as hereinafter mentioned, the Contractor hereby covenants with the Employer
to executive and complete the works and remedy any defects therein in
conformity in all aspects with the provisions of the contracts.
3. The employer hereby covenants to pay the Contractor in consideration of the
execution and completion of the works and the remedying the defects wherein
contract price or such other sum as may become payable under the provisions
of the Contract at the times and in the manner prescribed by the contract.
4. The Following documents shall be deemed to form and be ready and
construed as part of this Agreement viz
i) letter of Acceptance
ii ) Notice to proceed with the works:
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
iii ) Contractor’s Bid
iv ) Conditions of contract: General and
v) Contract Data
vi) Additional conditions
viii ) Bill of Quantities and
ix ) Any other documents listed in the
data as forming part of the Contract.
In witness whereof the parties there to have caused this Agreement to be
executed the day and year first before written
The Common seal of
Was hereunto affixed in the presence of :
Signed, sealed and Delivered by the said
In the presence of
Binding signature of Employer
Binding Signature of Contractor
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
(For Investment)
I, the undersigned do hereby undertake that our firm M/s
minimum cash up to 25% of the value of the work during implementation of the
(Signed by an Authorized officer of the firm)
Title of officer
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
I, the undersigned do hereby undertake that our firm M/s
……………..……………………………….. agree to abide by this bid for a period ....... days
for date fixed for receiving the same and it shall be binding on us and may be
accepted at any time before the expiration of that period.
(Signed by an Authorized officer of the firm)
Title of officer
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
DECLARATION/AUTHORITY LETTER FOR SITE VISIT
AND GEO-TAGGING
Name of Work: -
Name of Contractor/Agency: -
I My self hereby declare/authorize
mt authorized representative to carry out site visit
and inspect/visit other important location on site of above mentioned.
Signature with Stamp of the
Contractor/Agency
I Myself/authorized representative have personally inspected the work site on the
date , time PM/AM & have made myself/our self-acquainted.
Satisfied with the site condition. The details of Geo-Tagging along with my official
intimation duly submitted before due date is also attached as mentioned in the tender
will be uploaded in envelope no. 1 of the tender & certified that I/we as above
visited/inspected the site & accordingly Bid offer is submitted.
Signature with Stamp of the
Contractor/Agency
Municipal Engineer
Limbadi Nagarpalika
Limbadi Nagarpalika
Standard Bidding Document for works Limbadi
DOCUMENTS TO BE FURNISHED BY BIDDER
Limbadi Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00_NIT_Limbadi.pdf
01_Volume-I SBD Book and BOQ_Limbadi.pdf
02_Technical Specification (Mechanical).pdf
03_GST Resolution New.pdf
04_Paripatra-01.pdf
05_Paripatra-02.pdf
06_Paripatra-03.pdf
07_Paripatra-04.pdf
08_Paripatra-05.pdf
09_Vendor list (Mechanical) Dt. 21.07.2026.pdf
10_Schedule-B for Pumping Machinery.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .