Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance | ₹3.8 L | L1 | Admitted-Finance |
| 2 | L2₹4.1 LAdmitted-Finance LOCATION UTTARAKHAND UT | ₹4.1 L | L2 | Admitted-Finance |
| 3 | L3₹4.1 LAdmitted-Finance | ₹4.1 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rawat Electrical Works L1 | AJAY KUMAR CHAUHAN L2 | SRI NARAYAN ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Top Chennel Clamp For SP-23 With N&B | 30 | Nos | 250 ₹7,500 | 290 ₹8,700 | 300 ₹9,000 |
| 2.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 30 | Nos | 375 ₹11,250 | 420 ₹12,600 | 400 ₹12,000 |
| 3.00 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 16 | Nos | 244 ₹3,904 | 280 ₹4,480 | 280 ₹4,480 |
| 4.00 | HT Stay Insulator | 30 | Nos | 150 ₹4,500 | 150 ₹4,500 | 170 ₹5,100 |
| 5.00 | BRACING CLAMP TOP FOR SP-23 WITH N/B | 20 | Nos | 264 ₹5,280 | 325 ₹6,500 | 325 ₹6,500 |
| 6.00 | BRACING CLAMP BOTTOM FOR SP-23 WITH N/B | 20 | Nos | 264 ₹5,280 | 325 ₹6,500 | 350 ₹7,000 |
| 7.00 | ERECTION OF EARTHING ROD | 10 | Nos | 725 ₹7,250 | 780 ₹7,800 | 800 ₹8,000 |
| 8.00 | FABRICATION OF STEEL | 700 | KG | 22.97 ₹16,079 | 26 ₹18,200 | 30 ₹21,000 |
| 9.00 | EXCAVATION OF PIT FOR STAY SET | 19.44 | CBM | 300 ₹5,832 | 300 ₹5,832 | 400 ₹7,776 |
| 10.00 | ERECTION OF 11 KV STAY SET | 45 | NOS | 625 ₹28,125 | 650 ₹29,250 | 650 ₹29,250 |
Tender Value
Refer Docs
EMD Value
₹11,500
Closing Date
15 Dec 2025, 3:00 pmClosed
EXECUTIVE ENGINEER
EDD Bhikiyasain
as per NIT
2025_UPCL9_89044_1
16/E-TENDER/2025-26
Open Tender
Electrical Works
90 days
EDSD BHIKIYASAIN
Please refer Tender documents.
2 documents required · 2 mandatory
₹295
E E EDD
₹11,500
20 Jan 2026
21 Nov 2025
16 Dec 2025
21 Nov 2025
15 Dec 2025
21 Nov 2025
Top Chennel Clamp For SP-23 With N&B
STAY CLAMP FOR SP-23 WITH NUT & BOLT
EARTH WIRE CLAMP FOR SP-23 WITH N/B
HT Stay Insulator
BRACING CLAMP TOP FOR SP-23 WITH N/B
BRACING CLAMP BOTTOM FOR SP-23 WITH N/B
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
DISMANTLING OF SP-21/SP-23 SINGLE POLE
DISMANTLING OF SP-23 DOUBLE POLE
DISMANTLING OF 11 KV LINE(RABBIT)
LAYING OF RABBIT CONDUCTOR IN HT LINE
CARTAGE SP-21/23 POLE, 51-70 KM
CARTAGE OF PETTY MATERIAL,51-70 KM
HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
BACK CARTAGE OF PETTY MATERIAL,51-70 KM
BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
TD16.pdf
Tender Documents • 0.83 MB
BOQ_105628.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid