Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | L1 | Accepted-AOC L1 accept | |
| 2 | L2₹8.9 L+₹50,000 (5.93%)Accepted-AOC | L2 | Accepted-AOC L2 reject |
| Sl No | Description | Qty | Unit | MOHAMMED SANJEED A P L1 | SHABEER K.K. L2 |
|---|---|---|---|---|---|
| 1.00PREMONSOON WORK | |||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 13 | cum | 2,338.48 ₹30,400.24 Lowest | 2,338.48 ₹30,400.24 Lowest |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 5 | cum | 2,418.35 ₹12,091.75 Lowest | 2,418.35 ₹12,091.75 Lowest |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 13 | cum | 5,293.97 ₹68,821.61 Lowest | 5,293.97 ₹68,821.61 Lowest |
| 1.00 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 5 | cum | 11,914.53 ₹59,572.65 Lowest | 11,914.53 ₹59,572.65 Lowest |
| 1.00 | OD44459/2026-2027:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including of cost of material, laying charges, transportation to site etc complete Rate is arrived for a bag of 25kg | 200 | each | 764.97 ₹1,52,994 Lowest | 764.97 ₹1,52,994 Lowest |
| 1.01 | OD44460/2026-2027:Engaging Man Mazdoor for lifting , removing and replacing the cover slabs for
clearing the chocked culvert and drains etc. complete | 100 | each | 1,030.32 ₹1,03,032 Lowest | 1,030.32 ₹1,03,032 Lowest |
| 1.01 | OD44464/2026-2027:Engaging tipper (5 cum) for loading and unloading materials. (Hourly basis) | 78 | cum | 748.79 ₹58,405.62 Lowest | 748.79 ₹58,405.62 Lowest |
| 1.01 | OD44465/2026-2027:Engaging JCB (Hydraulic excavator) for removing the obstruction such as unserviceable soil and dumped earth along shoulder side of carriage way. | 100 | cum | 1,397.73 ₹1,39,773 Lowest | 1,397.73 ₹1,39,773 Lowest |
| 1.01 | OD44468/2026-2027:Cutting of grass and light jungle using brush cutter with all expenses | 50 | hour | 361.19 ₹18,059.5 Lowest | 1,361.19 ₹68,059.5 |
Tender Value
₹8.5 L
EMD Value
₹21,171
Closing Date
25 Jun 2026, 2:30 pmClosed
AEE pwd roads sub division ponnan
AEE pwd roads sub division ponnan
GENERAL Pre Monsoon Works 2026 27 Pothole filling Clearing chocked culverts side drains removal of wind fallen trees and clearing of jungles etc in various roads under Roads section Ponnani
2026_PWD_856291_1
PWD/RB/TR/8882/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
180 days
PONNANI
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,870
Yes
₹21,171
Yes
25 Jul 2026
17 Jun 2026
27 Jun 2026
17 Jun 2026
25 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PREMONSOON WORK | |||||
| 1.001 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | - | cum | - | - |
| 1.002 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | - | cum | - | - |
| 1.003 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | - | cum | - | - |
| 1.004 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | - | cum | - | - |
| 1.005 | OD44459/2026-2027:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including of cost of material, laying charges, transportation to site etc complete Rate is arrived for a bag of 25kg | - | each | - | - |
| 1.006 | OD44460/2026-2027:Engaging Man Mazdoor for lifting , removing and replacing the cover slabs for
clearing the chocked culvert and drains etc. complete | - | each | - | - |
| 1.007 | OD44464/2026-2027:Engaging tipper (5 cum) for loading and unloading materials. (Hourly basis) | - | cum | - | - |
| 1.008 | OD44465/2026-2027:Engaging JCB (Hydraulic excavator) for removing the obstruction such as unserviceable soil and dumped earth along shoulder side of carriage way. | - | cum | - | - |
| 1.009 | OD44468/2026-2027:Cutting of grass and light jungle using brush cutter with all expenses | - | hour | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
BOQ_1447365.xls
BOQ • 0.30 MB
corregendem.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .