| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.9 LAccepted-AOC SANJAY CHOWK BYPASS ROAD MAITHON DHANBAD JHARKHAND | DHANBAD | DHANBAD | JHARKHAND | 828207 | L-1 | Accepted-AOC As per TC recommendation. | |
| 2 | Rejected-Technical 000 DEBIANA DEBIANA NIRSHA DHANBAD JHARKHAND 828205 | DHANBAD | JHARKHAND | 828205 | - | Rejected-Technical As per TC recommendation. | |
| 3 | Rejected-Technical AT GOPALPURA TOWNSHIP P O MUGMA DIST DHANBAD 828204 | DHANBAD | JHARKHAND | 828204 | - | Rejected-Technical As per TC recommendation. |
Tender Value
₹6.8 L
EMD Value
₹8,500
Closing Date
7 Oct 2024, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE (Civil), Mugma Area
Office of The General Manager, Mugma Area, P.O-Mugma, Dist.- Dhanbad, 828204
Cleaning and beautification of canteen at Area office under Mugma Area (Special campaign 4.0)
2024_ECL_318444_1
ECL/GM/MA/CE/24-25/eTender/302 Dt. 30.09.2024
Open Tender
Civil Works - Buildings
Percentage
20 days
Mugma Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,500
7 Sept 2026
1 Oct 2024
7 Oct 2024
1 Oct 2024
7 Oct 2024
1 Oct 2024
1 Oct 2024 - 3 Oct 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Based on analysis | - | - | - | - |
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 180.9 | sqm | 33.85 | ₹6,123.47 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 0.92 | cum | 2,180.9 | ₹2,004.25 |
| 3 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 90.44 | sqm | 15.9 | ₹1,438.04 |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 49.68 | sqm | 46.25 | ₹2,297.7 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.5 | cum | 6,007.2 | ₹27,032.4 |
| 6 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.92 | cum | 8,420.4 | ₹7,738.35 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 102.81 | kg | 95.75 | ₹9,844.06 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form forSuspended floors, roofs, landings, balconies and access platform | 10.31 | sqm | 617 | ₹6,363.12 |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 151.2 | kg | 124.25 | ₹18,786.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_2.pdf
Tender Document • 0.68 MB
Tendernotice_1.pdf
Tender Document • 1.09 MB
BOQ_330080.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .