Loading…
Loading…
Tender ID
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
2 Apr 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of drain from House of Ahmad Sheikh and others at GG Sheikh
2026_PWDJK_306505_1
5th Call RnB E-NIT No 93 of 2025-26 EE-RnB-Grz-10381-88 E-tendering Dated-20-03-2026
Open Tender
Civil Works
Percentage
15 days
Gurez
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer RnB Division Gurez
₹2,000
20 Mar 2026
20 Mar 2026
3 Apr 2026
20 Mar 2026
2 Apr 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil | |||||
| 2P/L of stone soling duly hand packed including watering dressing and ramming with all carriages loading unloading and stacking etc complete | |||||
| 3Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)Nallah aggregates incl.carriage ,complete job (using 15% plum) | |||||
| 3.01 | plum | - | Cum | - | - |
| 4Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)Nallah aggregates incl.carriage ,complete job(using 15% plum) | |||||
| 4.01 | plum | - | Cum | - | - |
| 5Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | |||||
| 6Carriage of materials by mechanical means. Cement avg. lead of 38 Km | |||||
| 7Carriage of Material by Head lead Cement/Sand/Stone agg. (Subjected to actual) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_995179.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .