| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 CrAccepted-AOC 1 DHANLAXMI CHHIPWAD VALSAD VALSAD GUJARAT 396001 | VALSAD | GUJARAT | 396001 | ₹3.1 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹3.2 Cr+₹4.6 L (1.48%)Rejected-AOC MANSA | PATIALA | PUNJAB | 140401 | ₹3.2 Cr+₹4.6 L (1.48%) | 2 | Rejected-AOC L3 |
| 3 | 3₹3.3 Cr+₹21.5 L (6.86%)Rejected-AOC BHAGWANPURA DISTY SYSYTEM CONCRETE LINING M 15 WITH 10 ENHANCED CAPACITY FROM RD 28900 42528 OFFTAKING AT RD 90200 R 2ND PATIALA FEEDER | ₹3.3 Cr+₹21.5 L (6.86%) | 3 | Rejected-AOC L3 |
Tender Value
₹3.3 Cr
EMD Value
₹6.6 L
Closing Date
2 Nov 2023, 5:00 pmClosed
XEN BML CANAL AND GROUND WATER DIV PTA
XEN BML CANAL AND GROUND WATER DIV PTA
Rehabilitation of Khanna Disty Rd 51000-61100 by concrete lining including pucca structure
2023_WR_110883_1
50/23-24
Open Tender
Civil Works - Canal
Item Rate
60 days
SAMRALA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹6.6 L
XEN BML CANAL AND GROUND WATER DIV PTA
23 Nov 2023
13 Oct 2023
3 Nov 2023
13 Oct 2023
2 Nov 2023
13 Oct 2023
18 Oct 2023
Amount
Ordinary jungle clearance of both banks of Distributries, minors and drains with discharge 1.50 to 4.50 cumecs including boundary road
Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m
Excavation in soil using hydraulic jcb and hydraulic trolley with disposal upto 450 m including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead. (lead = 9 km )
Earthwork for compaction in 20 cm layers and dressing., Extra for watering the earth., Extra for rolling to specifications.
Dressing of earthwork.
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above upto 1.50 m
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above1.5 mtr depth but upto 3.0 m
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.
Dressing of Bed and prepration of sub grade for lining complete in all respect as per pwd specification.
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes.
Cement concrete lining 100 mm thick or less with mechanical paver for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (for vertical height upto 2.0 m)(For Lining)
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For coping)
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For Sleeper)
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Filling Contraction/Construction Joint with sealing compound complete in all respect
Filling expansion joints with special impervious hot pour 12.5 mm wide.
Extra bitumen painting over concrete surface at joints @ 0.69 kg per Sqm
250 wide LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
Providing and Fixing Distance Marks
Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete.
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
Laying Reinforced cement concrete (M-20) mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering in super structure.
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
providing apm cast iron block complete in all respects including supply of pig iron casting anf pattern making as per ISI specification No7986-1976
Making arrangement for lifting of RCC slab with JCB, sleepers, gutka including labour charges at site of work.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Ordinary soil, Manual Means, Depth up to 3 m
Dismantling of brick work in cement sand mortar / lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical Means)
Dismantling of brick work in cement pcc including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 metre (By Mechanical Means)
PCC 1:3:6 nominal mix in foundation with crushed Stone 40 mm nominal size mechinalcally mixed ,placed in foundation and compacted by vibration i/c curing for 14 days
Plain/Reinforced cement concrete M25 in sub-structure With Batching Plant, Transit Mixer and Concrete Pump complete as per drawing and Technical Specifications
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and MoRT&H Specifications
BRIJ LAL GOVT CONTRACTOR
ASHOK KUMAR BANSAL GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .