| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance R O VILLAGE SAGNAHER P O CHAUNTRA TEHSIL JOGINDER NAGAR DISTT MANDI H P | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.0 L+₹4,229.60 (1.44%)Rejected-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹3.0 L+₹4,229.60 (1.44%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.3 L+₹34,809.45 (11.9%)Rejected-Finance | ₹3.3 L+₹34,809.45 (11.9%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.4 L+₹46,755.10 (15.9%)Rejected-Finance HIMACHAL PRADESH HP | ₹3.4 L+₹46,755.10 (15.9%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.7 L+₹75,922.50 (25.9%)Rejected-Finance | ₹3.7 L+₹75,922.50 (25.9%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | VIKAS KUMAR L4 | dilbag singh L3 | Pardeep Kumar L1 | Naveen Kumar L2 | Jeet Kumar L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches, etc., in all types of soil, including pick work, jumper work, chiselling of hard or soft rock where blasting is prohibited, and excavation in slushy, marshy (daldal), or saturated soil; including dewatering by pumping or bailing out water at all depths. The work also includes stacking the excavated soil within site limits, away from the edge of excavation; refilling the stacked soil in 15 cm (fifteen centimeters) thick layers into plinths or foundations, as required; consolidating each layer by ramming and watering; and disposing of all surplus excavated earth — complete in all respects, as per the direction and to the full satisfaction of the Engineer-in-Charge, within all leads and lifts. | 34.67 | Cum | 350 ₹12,134.5 | 355 ₹12,307.85 | 250 ₹8,667.5 Lowest | 300 ₹10,401 | 300 ₹10,401 |
| 2.00 | Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth i/c carriage of material complete in all respect within all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 2.6 | Cum | 7,000 ₹18,200 | 6,500 ₹16,900 | 5,000 ₹13,000 Lowest | 5,200 ₹13,520 | 6,500 ₹16,900 |
| 3.00 | Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor two ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in: Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect including all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | 74.93 | sqm | 220 ₹16,484.6 | 220 ₹16,484.6 | 50 ₹3,746.5 Lowest | 220 ₹16,484.6 | 350 ₹26,225.5 |
| 4.00 | Providing and laying cement concrete 1:3:6 (1cement:3 sand:6 graded stone aggregate 20mm nominal size) curring complete excluding cost of form work in foundation and plinth complete in all respect including all leads and Lifts as per the direction and to be entire satisfaction of Engineer-In-Charge. | 24.25 | Cum | 7,400 ₹1,79,450 | 7,100 ₹1,72,175 | 6,000 ₹1,45,500 Lowest | 6,200 ₹1,50,350 | 7,000 ₹1,69,750 |
| 5.00 | Providing and laying cement concrete work 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : In foundation and Plinth complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 3.46 | Cum | 8,000 ₹27,680 | 7,800 ₹26,988 | 6,000 ₹20,760 Lowest | 7,000 ₹24,220 | 8,000 ₹27,680 |
| 6.00 | Providing and laying mild steel /tor steel reinforcement for RCC work i/c bending binding and placing in position complete including cost of binding wire up to all floor level complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 480 | Kg | 80 ₹38,400 Lowest | 84 ₹40,320 | 95 ₹45,600 | 84 ₹40,320 | 100 ₹48,000 |
| 7.00 | WIRE ROPES & ACCESSORIES SUSPENSION BRIDGES Supplying, hoisting and streching to specified profile wire rope for suspension bridges. (including guy ropes) complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | 1.31 | Qtl. | 14,000 ₹18,340 | 12,800 ₹16,768 | 11,000 ₹14,410 Lowest | 12,800 ₹16,768 | 15,000 ₹19,650 |
| 8.00 | Providing and fixing in position steel accessories like clamps, suspenders, rope grips,U-Bolts ancherage bolts with pulleys etc.alongwith fixrures for suspension bridges complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.. | 1 | Qtl. | 11,000 ₹11,000 | 10,400 ₹10,400 | 8,000 ₹8,000 Lowest | 10,000 ₹10,000 | 9,000 ₹9,000 |
| 9.00Dismentalling of old laid Galvanized Mild Steel Tube fitting including testing of following dias from trenches tube fitting (earth work in trenches to be measured and paid to separately) complete in all respect as per the direction and to the entire of Engineer-in-Charge within all leads and lifts. | ||||||||
| 9.10 | 125 mm dia (M. P/E) | 50 | Rmt. | 120 ₹6,000 | 95 ₹4,750 | 150 ₹7,500 | 90 ₹4,500 Lowest | 200 ₹10,000 |
Tender Value
Refer Docs
EMD Value
₹6,890
Closing Date
31 Mar 2026, 11:00 amClosed
Executive Engineer
JSV Division Dharamshala
Construction of Khad Xing No2 at over Charan Khad Near Tau Cholla and Dismentaling Relaying and jointing of GI Pipe 125mm dia
2026_HPIPH_132368_1
NO. EE-JSD-EA-I-2026-19526-615
Open Tender
Civil Works
Item Rate
Dharamshala
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
Yes
₹6,890
13 Apr 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
31 Mar 2026
26 Mar 2026
24 Mar 2026 - 26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation in foundations, trenches, etc., in all types of soil, including pick work, jumper work, chiselling of hard or soft rock where blasting is prohibited, and excavation in slushy, marshy (daldal), or saturated soil; including dewatering by pumping or bailing out water at all depths. The work also includes stacking the excavated soil within site limits, away from the edge of excavation; refilling the stacked soil in 15 cm (fifteen centimeters) thick layers into plinths or foundations, as required; consolidating each layer by ramming and watering; and disposing of all surplus excavated earth — complete in all respects, as per the direction and to the full satisfaction of the Engineer-in-Charge, within all leads and lifts. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:4:8(1:cement :4 sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth i/c carriage of material complete in all respect within all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | - | Cum | - | - |
| - | Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30 x 30 x 5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor two ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in: Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course complete in all respect including all leads and lifts as per direction and to the entire satisfaction of Engineer-in-Charge. | - | sqm | - | - |
| - | Providing and laying cement concrete 1:3:6 (1cement:3 sand:6 graded stone aggregate 20mm nominal size) curring complete excluding cost of form work in foundation and plinth complete in all respect including all leads and Lifts as per the direction and to be entire satisfaction of Engineer-In-Charge. | - | Cum | - | - |
| - | Providing and laying cement concrete work 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : In foundation and Plinth complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | - | Cum | - | - |
| - | Providing and laying mild steel /tor steel reinforcement for RCC work i/c bending binding and placing in position complete including cost of binding wire up to all floor level complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | - | Kg | - | - |
| - | WIRE ROPES & ACCESSORIES SUSPENSION BRIDGES Supplying, hoisting and streching to specified profile wire rope for suspension bridges. (including guy ropes) complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts. | - | Qtl. | - | - |
| - | Providing and fixing in position steel accessories like clamps, suspenders, rope grips,U-Bolts ancherage bolts with pulleys etc.alongwith fixrures for suspension bridges complete in all respect as per direction and to the entire satisfaction of Engineer-in-Charge within all leads and lifts.. | - | Qtl. | - | - |
| - | Dismentalling of old laid Galvanized Mild Steel Tube fitting including testing of following dias from trenches tube fitting (earth work in trenches to be measured and paid to separately) complete in all respect as per the direction and to the entire of Engineer-in-Charge within all leads and lifts. | - | - | - | - |
| - | 125 mm dia (M. P/E) | - | Rmt. | - | - |
stage.html
html • 0.05 MB
technical_195731.pdf
techsummary_195731.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_195731.xls
BOQ • 0.28 MB
form68.pdf
Tender Documents • 0.89 MB
terms.pdf
Additional Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .