| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.6 LAccepted-AOC | L1 | Accepted-AOC Agreement Executed | |
| 2 | L2₹80.0 L+₹2.4 L (3.11%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹81.7 L+₹4.2 L (5.36%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹81.7 L+₹4.2 L (5.37%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹82.0 L+₹4.5 L (5.79%)Rejected-Finance LSGD SECTION MALAYALAPUZHA GRAMA PANCHAYATH | PALAKKAD | KERALA | 678001 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | J CHANDY L2 | D MANOHARAN L3 | Vibin Thomas L1 | SUNIL M G L4 | Anthyalankavu Engineering & Labour Contract Society Ltd No 321 L6 | SHYJU T JOHN L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00BLOCK OFFICE BUILDING | |||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 192.45 | cum | 351.99 ₹67,739.07 | 359.72 ₹69,226.68 | 337.64 ₹64,977.47 Lowest | 359 ₹69,088.11 | 350 ₹67,356.1 | 360 ₹69,280.56 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 26.03 | cum | 7,762.33 ₹2,02,061.21 | 7,932.89 ₹2,06,501.06 | 7,446.14 ₹1,93,830.47 Lowest | 7,932 ₹2,06,477.89 | 9,999 ₹2,60,283.97 | 8,000 ₹2,08,248 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 55.65 | sqm | 377.86 ₹21,026.02 | 386.16 ₹21,487.87 | 362.46 ₹20,169.09 Lowest | 386 ₹21,478.97 | 500 ₹27,822.5 | 387 ₹21,534.62 |
| 1.00 | 5.33.1.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 58.93 | cum | 10,655.44 ₹6,27,914.42 | 10,889.57 ₹6,41,711.47 | 10,221.4 ₹6,02,336.88 | 10,895 ₹6,42,031.46 | 9,999 ₹5,89,231.07 Lowest | 11,000 ₹6,48,219 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 46.09 | cum | 311.62 ₹14,363.9 | 318.47 ₹14,679.56 | 298.92 ₹13,778.42 Lowest | 318 ₹14,657.89 | 500 ₹23,047 | 319 ₹14,703.99 |
| 1.01 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 91.37 | cum | 12,646.2 ₹11,55,483.29 | 12,924.06 ₹11,80,871.36 | 11,784.62 ₹10,76,760.73 | 12,924 ₹11,80,865.88 | 9,999 ₹9,13,608.63 Lowest | 13,000 ₹11,87,810 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 94.2 | metre | 223.23 ₹21,028.27 | 228.13 ₹21,489.85 | 214.13 ₹20,171.05 Lowest | 228 ₹21,477.6 | 500 ₹47,100 | 230 ₹21,666 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 282.4 | sqm | 940.57 ₹2,65,616.97 | 961.24 ₹2,71,454.18 | 902.25 ₹2,54,795.4 | 961 ₹2,71,386.4 | 500 ₹1,41,200 Lowest | 965 ₹2,72,516 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 40.46 | sqm | 999.97 ₹40,456.79 | 1,021.94 ₹41,345.65 | 959.23 ₹38,808.53 | 1,021 ₹41,307.62 | 750 ₹30,343.5 Lowest | 1,025 ₹41,469.45 |
Tender Value
₹81.7 L
EMD Value
₹50,000
Closing Date
19 Mar 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
LIDEW DIVISION PTA
LAC-ADS-2023-24-CONSTRUCTION OF MALLAPPALLY BLOCK PANCHAYATH OFFICE BUILDING-General Civil Work
2026_LSGD_845762_3
14/2025-26/EE/LIDEW/PTA
Open Tender
Civil Works - Buildings
Item Rate
270 days
PATHANAMTHITTA
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
20 Jun 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BLOCK OFFICE BUILDING | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 192.45 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 26.03 | cum | - | - |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 55.65 | sqm | - | - |
| 1.004 | 5.33.1.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 58.93 | cum | - | - |
| 1.005 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 46.09 | cum | - | - |
| 1.006 | 5.33.2.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement
All work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 91.37 | cum | - | - |
| 1.007 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 94.2 | metre | - | - |
| 1.008 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 282.4 | sqm | - | - |
| 1.009 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 40.46 | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1428540.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.32 MB
AFF3.pdf
Tender Documents • 0.24 MB
E_PAYMENT.pdf
Tender Documents • 0.23 MB
I_PACT.pdf
Tender Documents • 0.23 MB
PRE3.pdf
Tender Documents • 0.26 MB
BOQ_1428540.xls
BOQ • 0.34 MB
F3.pdf
Tender Documents • 0.25 MB
SBD_NIT.pdf
Tender Documents • 5.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .