Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.6 Cr
EMD Value
₹2.4 L
Closing Date
16 Apr 2026, 6:00 pmClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl Miz
PDG AND LYG OF HMP READY MIX BC 30 MM TH INCL CLEANING RD SURFACE APPLYING TACK COAT, CORRECTION WKS WITH BM 75 MM FOR RE-SURF FOR THE FY 2026-27 WKS BW KM 0.0 TO KM 7.60 (NET LENGTH 7.600 KM) ON NORTH-VANLAIPHAI-THINGSAI RD UNDER 74 RCC MIZORAM
2026_BRO_756948_1
NIT-38 of 2025-26
Open Tender
Civil Works - Roads
Item Rate
240 days
Km 0.00 To Km 7.60 N-V-T Rd
As per Tender documents
8 documents required · 8 mandatory
₹0
₹2.4 L
Yes
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl Miz
17 Apr 2026
19 Mar 2026
17 Apr 2026
20 Mar 2026
16 Apr 2026
3 Apr 2026
23 Mar 2026 - 2 Apr 2026
25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Re-Surfacing work on various locations between Km 0.000 to Km 7.600 (Net length 7.600 Km) on North-Vanlaiphai-Thingsai road | - | - | - | - |
| 1.01 | Providing and laying of HMP ready mix Bituminous Concrete (BC) 30 mm thick compacted with bitumen VG-30 as per clause 507 of MoRT&H Specifications (Fifth revision) for road and bridge work , tack coat as per clause 503 of MoRT&H Specifications (Fifth revision) on the existing BT surface, correction work with BM 75 mm thick compacted as per clause No 504 of MoRT&H Specifications (Fifth revision) including Prime Coat as per clause 502 of MoRT&H Specifications (Fifth revision ) duly maintaining the road profile with paver finisher and rolled as per clause 501.6 and 501.7 of MoRT&H Specifications (fifth revision) to achieve desired compaction including all labourers, materials and machinery as specified and directed by Engg-In-Charge.
Note: 1. The specification given in clause 3004.2 of MoRT&H Specifications (Fifth revision) will be complied while carrying out correction work.
2. The maximum area of correction work with BM 75 mm thick compacted will be 10% of the cost of BC 30 mm. | - | Sqm | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Tendernotice_3.pdf
PDF • 1.53 MB
BOQ_847889.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .