Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Finance | -46.99% | ₹4.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.9 L+₹10,650.81 (2.24%)Admitted-Finance | -45.80% | ₹4.9 L+₹10,650.81 (2.24%) | L2 | Admitted-Finance |
| 3 | L3₹4.9 L+₹16,915.98 (3.57%)Admitted-Finance | -45.10% | ₹4.9 L+₹16,915.98 (3.57%) | L3 | Admitted-Finance |
| 4 | L4₹5.0 L+₹25,776.74 (5.43%)Admitted-Finance | -44.11% | ₹5.0 L+₹25,776.74 (5.43%) | L4 | Admitted-Finance |
| 5 | L5₹5.4 L+₹66,589.91 (14.0%)Admitted-Finance | -39.55% | ₹5.4 L+₹66,589.91 (14.0%) | L5 | Admitted-Finance |
Tender Value
₹8.9 L
EMD Value
₹17,900
Closing Date
17 Aug 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Rajouri
Restoration of road from Shahpur to Thatyali.
2026_PWDJK_320601_7
e NIT NO 63 OF 2026-27 Dated 11-08-2026
Open Tender
Civil Works
Percentage
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer
₹17,900
11 Sept 2026
12 Aug 2026
18 Aug 2026
12 Aug 2026
17 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drain/ Slip Clearence In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. | 57.6 | Cum | 331.15 | ₹19,074.24 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 13.92 | Cum | 256.85 | ₹3,575.35 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) | 3.48 | Cum | 4,826.5 | ₹16,796.22 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level 1:3:6 using 20% plum of nallah split stone ( 1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20mm nominal size ) crushed | 129.6 | Cum | 4,774.46 | ₹6,18,770.02 |
| 5Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete | |||||
| 5.1 | Foundations, footings, bases for columns | 308.5 | Sqm | 286.35 | ₹88,338.98 |
| 6 | Stone filling hand packed in horizontal level including the cost of the stone | 28.8 | Cum | 937.9 | ₹27,011.52 |
| 7Carriages | |||||
| 7.1 | Sand for an average distance of 120 kms by M.T | 50.36 | Cum | 1,513.94 | ₹76,242.02 |
| 7.2 | Stone aggregate below 40 mm nominal size for an average distance 20 kms by M.T | 95.37 | Cum | 409.94 | ₹39,095.98 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1066315.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .