| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Fee/PreQual/Technical/Finance | -3.10% | ₹7.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.8 L+₹24,159.28 (3.20%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹7.8 L+₹24,159.28 (3.20%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.8 L
EMD Value
₹19,500
Closing Date
4 Jul 2026, 3:00 pmClosed
Assistant Executive Engineer
Electrical Sub Division Kattappana
LT Reconductoring with LT ABC at Kattappana Town Part 3
2026_KSEB_856791_1
DB19/E TENDER/ESD KTP/2026-27/04
Open Tender
Electrical Works
Percentage
90 days
Kattappana
Please refer tender documents
4 documents required · 4 mandatory
₹1,888
₹19,500
7 Jul 2026
20 Jun 2026
6 Jul 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 28 | Trip | 3,142.26 | ₹87,983.28 |
| 1.02 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. | 60 | No | 2,017.73 | ₹1,21,063.8 |
| 1.03 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 60 | No | 478.82 | ₹28,729.2 |
| 1.04 | Providing End Caps | 210 | No | 6.34 | ₹1,331.4 |
| 1.05 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. | 100 | No | 434.91 | ₹43,491 |
| 1.06 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. | 50 | No | 938.82 | ₹46,941 |
| 1.07 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after
completing the line work. | 600 | No | 96.18 | ₹57,708 |
| 1.08 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after
completing the line work | 180 | No | 149.5 | ₹26,910 |
| 1.09 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size | 100 | No | 48.16 | ₹4,816 |
stage.html
html • 0.02 MB
finance_1448149.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BIDDOCUMENT.pdf
Tender Documents • 0.41 MB
AdditionalSafetyConditions.pdf
Additional Documents • 0.67 MB
BOQ_1448149.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .