Loading…
Loading…
Tender Value
₹59.4 L
EMD Value
₹59,430
Closing Date
27 Jan 2026, 6:00 pmClosed
Superintending Engineer, Project Implementation Unit, Health & Family Welfare Department.
Supply, Installation, Testing and Commissioning of Modular Operation Theatre at SDH Khedbrahma, Ta. Khedbrahma, Dist. Sabarkantha.
255558
2025-26/113/13
Open
Civil Works
Gandhinagar
1 document required · 1 mandatory
₹2,400
PIU-General Fund A/c 11-114
₹59,430
18 Dec 2025
18 Dec 2025
18 Dec 2025
27 Jan 2026
18 Dec 2025
Name of Work : Supply, Installation, Testing and Commissioning of Modular Operation Theatre at SDH Khedbrahma, Ta. Khedbrahma, Dist.
Memorandum showing items of works to be carried out
Item No. Quantity Item Description Unit Rate
1 2 3 4 5 In Words
Supply, Installation, Testing and Commissioning of Pre Fabricated Modular Operation Theater Panels (Walls and
Ceiling) made out Polyurethane foam injected at 40 Kg/m3 sandwiched between 0.8 mm thick GP/SP sheet on
front side and 0.5 mm GP/SP/PPGI sheet on back-side. The inner surface walls be fixed to the bricks wall with
essential support. There will be minimum possible cavity/gap in between solid and steel walls and will be variable
to suit the architects lay out for the flush mounting of the equipments. The wall and ceiling panels must comply
with necessary provision of to JIS Z 2801/ISO 22196, BS EN 1363-1:2020, EN 1363-2:1999, EN 1364-1:2015,
Sq Rupees Six Thousand Five
1 Penels 126.00 DIN 52210-2:1984-08, DIN 4102-1, Class A2. Any Third-party compliance certificate mandatory. Panel should be Mtrs.
Hundred Fifty Only
covered with protective sheath of 300 d.f.t Anti-bacterial Paint having undergone Washability/Water resistance
Test JIS K 5663.7.12, permeability test less than 200 unit of permeability, Anti-bacterial effect against
staphyloccoccus aureus, Escherichia coli (via HALO test) and safety and causative agents such as formaldehyde,
toluene, xylene, paradichlorobenzene etc. Third party (NABL approved Lab) certification for EGP and thickness
test certificate to be submitted
at time of supply.
Supply, Installation, Testing and Commissioning of Ceiling Filtration System - The ceiling filtration system in the
surgical theatre should ensure a unidirectional distribution of sterile air, covering all areas affected by the airflow. It
should consist of a laminar flow system incorporated within a frame made from thick extruded aluminum profiles,
complete with a sealed gasket to prevent leaks. The system should incorporate "H 14" class HEPA filters
positioned in the ceiling plenum. These filters should achieve an MPPS average efficiency greater than 99.95%
and a 3-micron DOP efficiency greater than 99.99%. The filters should also be designed to handle a final pressure
drop of no more than 600 Pa, operate at a maximum temperature of 60 degrees Celsius, and function effectively
within a relative humidity range of 40-50%. The filtration ceiling system should be capable of maintaining a
constant airflow velocity of 0.25 m/s at the diffuser. This should be accomplished through the use of a diffuser or
Rupees Three Lakh Ninety
2 HEPA filters 1.00 flow equalizer that ensures uniform and constant air distribution over the entire surface area. The structure holding Nos.
the filtration system, including the filter frames and top plenum, should be made from either aluminum or stainless
steel. The system should be CE/UL certified and designed to achieve an ISO 14644/1 classification of ISO 5, with
a bacteriological class of B (5 CFU/m3) and particle decontamination kinetics CP of 5 minutes. After installation,
the system's performance should be validated by a third-party government-approved environmental lab to ensure
compliance with specified standards. A positive pressure should be maintained inside the operating theatre to
prevent contamination from external air sources. The supplier should provide test certificates for the HEPA filters
and the laminar airflow systems from the original manufacturers. Furthermore, the size of the laminar airflow
system should be a minimum of 8 feet by 8 feet. Finally, the entire system should meet CE/BIS certification
standards, ensuring it adheres to both European and Indian safety and performance regulations.
Item No. Quantity Item Description Unit Rate
The flooring within the surgical theatre should consist of a minimum of2 mm thick antistatic seamless PVC,
ensuring durability and safety. This floor should be smooth, non-slip, and made from an impervious material with
sufficient conductivity to dissipate static electricity effectively, yet not so conductive as to risk electric shock to
personnel. The PVC used should be of very high quality, particularly designed for electrostatic charge dissipation,
and should not be less than 2 mm in thickness. The installation process should utilize continuous rolls, and joints
should be seamlessly welded using special PVC thermal welding units with welding bars of the same color to
ensure uniformity and prevent contamination. The sheets should be highly durable, capable of resisting shocks,
indentations, and scratches. The conductive material should be uniformly impregnated within the PVC as grains to
enhance its antistatic properties. Additionally, the flooring should be inert to body fluids, chemicals, and
disinfectants, and remain unaffected by temperature variations typical within an operating theatre. It should
efficiently discharge electric charges up to 2 kV, and the electrical resistance (point to ground) should be
Sq Rupees Four Thousand Two
3 Vinyl Flooring 55.00 maintained within 2.5x10^4 to 5x10^6 ohms, ensuring no buildup of electrical charge beyond 100 volts. Floor Mtrs.
Hundred Fifty Only
installation should be performed by skilled workers from accredited agencies authorized by the PVC sheet
supplier. The installation should include a conductive copper grid beneath the PVC sheet, supported by liquid
epoxy compounds to create a uniform and level surface. Copper strips should be made visible by grinding and not
project more than 0.5mm above the floor level to prevent damage to the PVC sheet, with one earthing lead
brought out from every 150 sq.ft area and attached to the main earthing strip/ground. The flooring should also be
mechanically shockproof, scratchproof, flame retardant, and antimicrobial. Corners of the flooring should be
uniformly curved, and a concealed cove-former (aluminium) should overlap the wall panel to a height of
approximately 25mm and be sealed perfectly and uniformly. Before laying the PVC, suitable self-leveling
compounds should be used to prevent any undulations within the operating theatre. The final surface should be
non-corrosive to biological fluids and detergents, with a color that is uniform, pleasant, and matching with the
ambience as approved by the respective consignee.
The door to the surgical theatre should be a hermetically sealed, single sliding door measuring 2.1 meters in
height and 1.5 meters in width. The door should be equipped with a controller capable of being operated by elbow
switches, foot switches, and a touchless sensor, providing multiple, accessible control options. The track for the
door should be made from stainless steel or aluminum, with the running surface for the top rollers angled
appropriately to minimize resistance and facilitate smoother movement. The door leaf should be suspended using
high-quality hard plastic rollers with double bearings at the top. These rollers should run under the stainless steel
or aluminum track to ensure smooth and noiseless operation. The opening and closing mechanisms of the door
should be controlled by a microprocessor for precise electromechanical movement. The material of the door
should be either SMS or HPL, with a color that matches the interior design. The door should be designed to be
strong yet lightweight for ease of use. In case the automatic mechanism fails, the door should still be able to open
and close effortlessly manually. The handle of the door should be made from stainless steel with a matte finish
and equipped with a high-quality cylindrical or ESPg lock for security. The door leaf should incorporate a high- Rupees Two Lakh NinetyFive
quality synthetic rubber gasket with long durability to ensure hermetic sealing and maintain a 99.99% air tightness Thousand Only
at a minimum pressure of 75Pa. The floor on either side of the door should be perfectly level, with a maximum
permissible difference of +1mm, to avoid any tripping hazards or unsealed gaps. The overall thickness of the
finished door should range from 30-60mm, with the inner part of the door filled with CFC-free polyurethane foam,
approximately 48mm thick, sealed airtight to block any microbial ingress. The door and its controls should comply
with IEE regulations, utilizing DC brushless or PMDC motors that are effectively isolated from mains power to
ensure safety and reliability. Additionally, the door should include a vision window measuring 300mm x 300mm,
featuring double-glazed panels that are hermetically sealed to maintain the integrity of the seal. The movement of
the door should be as quiet as possible, and the time to start moving after receiving a signal should be adjustable
between 0.5 to 20 seconds.The door controller should be CE marked, BIS certified, or IEC 60601 certified to meet
international and national safety standards. A test certificate for the hermetically sealed door frame should be
included in the pre-dispatch documents to verify compliance with the specified standards and functionality. 1 door
Item No. Quantity Item Description Unit Rate
Supply, Installation, Testing and Commissioning of Membrane-Type Operation Switch and Communication
Controller - The Operation Switch and Comms Controller should encompass all necessary controls to ensure the
proper operation and monitoring of equipment and services in the operating room (OR). Positioned for optimal
visibility in the surgeon's line of sight and the OT staff, the wall-mounted membrane-buttons should be easily
accessible to the nurse for operation and assistance. In addition to hosting a digital clock and elapsed time
indicator, the panel should feature a medical gas alarm, clearly indicating high and low gas pressures for each
gas service, including vacuum, supported by an audible alarm. The Operation Switch and Comms Controller
should also provide an alarm mute option for fault annunciation, with pressure sensors strategically located near Rupees One Lakh NinetyFive
5 Control Panel 1.00 Nos. 195000.00
isolation valves. Controls for general lighting, including ON/OFF and dimming, organized in groups for uniform Thousand Only
illumination, should be present. Furthermore, the panel should facilitate control over operating lights (major and
satellite) and camera functions (on/off and intensity). A hands-free telephone set with memory should be
conveniently situated, and temperature and humidity controls for the room, linked to the AHU (+/5%) using NO/NC
or Chilled Water/Hot Water Actuator Control Valve (whichever is applicable), should be adjustable from the
Operation Switch and Comms Controller. Real-time indicators, such as a digital room pressure indicator and
HEPA filter bank differential pressure indicator, are essential for monitoring and maintaining a safe and controlled
environment in the operating room. Telephone with Alpha-numeric keyboard is required with Speed-dialing option
Hatch boxes should be provided in each operating theater to facilitate the safe and efficient removal of waste
materials to the dirty linen area or adjacent corridor. Each hatch box should be equipped with two doors, operated
electrically or motorized, designed such that only one door can be opened at a time to prevent cross-
Rupees One Lakh Fifteen
6 Hatch boxes 1.00 contamination. UV lighting should be installed to ensure sterilization and should remain on when both doors are Nos.
closed, automatically turning off when either door is opened. Indicators should be provided on both sides of the
operating theater to monitor the door open/close status. The material of the hatch box should also be SS304
grade stainless steel, with a minimum size of 600mm x 600mm.
In each operating theater, an operating list board should be installed. It should be made of ceramic with magnetic
properties and should be flush with the wall to maintain cleanliness and ease of use. LED type flat panel X-ray
viewing panels should be provided, complying with relevant electrical safety codes, and mounted flush with the
Rupees TwentyEight
7 list board 1.00 wall to prevent dust accumulation and microbial growth. The body should be made of extruded aluminum, powder- Nos.
Thousand Five Hundred Only
coated with a bacteria-resistant and disinfectant-resistant finish. The diffuser on the front panel should provide a
uniformly lit screen, and dimming controls should be easily accessible. Additionally, a proper spring-loaded film
clip with rollers should be included to securely hold and easily remove films without causing scratches.
LED type flat panel X-ray viewing panel should be supplied. This should comply with relevant electrical safely
codes. This should be a 2-panel viewing screen. Mounting should be flush with the wall to avoid dust
X-ray viewing accumulation and growth or organisms between wall and panel. Body should be of extruded aluminium powder Rupees FourtyOne
coated black with bacteria resistant and disinfectant resistant finish. The diffuser on the front panel should be a Thousand Five Hundred Only
uniformly lit screen. Dimming electronic control should be enclosed at the bottom of the cabinet. Proper spring-
loaded film clip with rollers should be provided to hold the films firmly and to remove the film without scratches
Item No. Quantity Item Description Unit Rate
Supply, Installation, Testing and Commissioning of Double-Bay Scrub Sink - The scrub station should be
compact, designed for use in the OT complex, and facilitate pre-procedural scrubbing. It should be made from
heavy gauge type 304 stainless steel with a minimum thickness of 1.5mm and feature seamless welded
construction polished to a satin finish. The scrub sink should have a front access panel for easy maintenance of
Double-Bay Rupees One Lakh TwentySix
1.00 water control valves, waste connections, stoppers, and strainers. Hands-free operation should be enabled through Nos.
infrared sensors with programmable adjustments. Thermostatic mixing valve control should maintain constant
water temperature and be located behind the access panel. Timing should be adjustable to meet individual usage
requirements, and units should have reduced anti-splash fronts. An additional knee/foot-operated switch should
also be provided for enhanced functionality.
Supply, Installation, Testing and Commissioning of Storage Units - Storage units should be constructed with same
material, as wall and ceiling panels. The shelves, made of glass and, should be removable for cleaning. The unit
Rupees EightyFive Thousand
10 Storage Units 2.00 should be divided into two or more parts, each with individual glass doors equipped with a high-quality locking Nos.
system. The overall size of the storage unit should
be approximately 200 cm (H) x 120 cm (W) x 35 cm (D).
Supply, Installation, Testing and Commissioning of Peripheral Lighting - To enhance the operational environment
of each operating theatre, peripheral lighting and clean room luminaries should be installed, with a minimum of
eight units per theatre. These lights should offer an intensity of at least 500 Lux and be housed in highly specular
anodized aluminum with an optical antiglare system to minimize visual fatigue and glare. Each peripheral light
should measure 2' x 1'. The covers for these luminaries should be constructed from highly resistant, disinfectant-
proof laminated safety glass or acrylic, featuring a stylish, fine-grained surface that complements the clean and
sterile environment of the operating theatre. The body of the luminaries should be made from sheet steel,
Peripheral perfectly powder-coated to resist contamination and facilitate easy cleaning, and should be ready for connection Rupees TwentyTwo
either as individual units or within a series circuit. This setup should include digital electronic control gear utilizing Thousand Five Hundred Only
multilamp technology to optimize energy efficiency and light output. The installation of these luminaries should
ensure that the recess frames are gas tight. Each fitting should be flush with the ceiling and designed to be
removable from either the top or bottom for ease of maintenance. It is crucial that the light fittings are uniformly
and aesthetically distributed across the ceiling to provide consistent illumination throughout the OT, without
interfering with visibility during procedures such as green mode endoscopy. Furthermore, the peripheral lighting
system should conform to IP65 or IP54 international protection ratings, ensuring that the fixtures are dust tight and
protected against water ingress, suitable for the demanding conditions of an operating theatre.
Control equipment for both general lighting and light dimming functionalities should be centralized within the
Rupees EightyFive Thousand
12 1.00 theatre control panel, allowing for precise adjustments to meet varying procedural requirements and enhance the Nos.
functionality and flexibility of the lighting system in the operating theatre.
Item No. Quantity Item Description Unit Rate
Supply, Installation, Testing and Commissioning of Electrical Wiring inside OT - Power distribution within each
Operating Theatre (OT) should be handled via distribution boards located locally to each theatre using Fire
Resistance Low Smoke Wiring, layed in PVC conduits of reputed brand. The sub mains power to these panels
should be provided by the general electrical contractor, and all distribution services within the departments should
run from these panels. The power distribution unit should hold certifications such as EN, CE, FDA, IEC, and BIS
to ensure compliance with international safety and performance standards. Each wall of the MOT should have a
minimum of two hybrid switch sockets (6/16A) on each wall, in compliance with IEC standards. Light fittings within
the clinical areas should be recessed LED types equipped with control gear and sealed in accordance with the
IP54 standard. This standard ensures that the fittings are protected against limited dust ingress and water spray
from all directions, suitable for clinical environments. All equipment should be fully and permanently labeled to Rupees Two Lakh
clearly identify and describe the function, operation, and voltage of the apparatus concerned. Upon completion of NinetyNine Thousand Only
the electrical installation, tests should be carried out in accordance with the relevant sections of local wiring
regulations, with results duly recorded. Each OT should have a distribution board (DBs) installed, with suitable
wiring. A separate enclosure should house all high-voltage equipment to ensure safety and isolation. The remote
cabinet should contain operating lamp transformers, mains failure relays, UPS, electrical distribution equipment,
and circuit protection equipment for all circuits within the operating theatre. All internal wiring within the DBs
should terminate in connectors equipped with screws and clamp springs. Connections should be of the clip-on
type mounted on a rail approved by CE/IEC/BIS standards and labeled with indelible proprietary labels. All internal
circuits should be protected by individual fuses or miniature circuit breakers to ensure safety and manage
potential electrical faults effectively.
AIR HENDALING UNIT Make:KrVelocity: Not More Then 8 to 10 mt/second. , Canvass Connection-Heavy duty,
non partical shreding,Fire Retardentuger,Nikotra only , Type: PLUG,Drirect Driven,Dynamically Balanced
Selection of fan-Should run comfortably at 50 HZ at rated capecity. Motor Make:Siemence,B.B,Crompton,ABB
Type:TEFC, IP:55, Foot Mounted, VFD compitable and I2 generation Safety: Motor should have interlocked with
AIR AHU Motor door/excess/Fire DamperType-TWO TIRE, Floor Mounted , Inner const.:0.6mm plain G.I , Outer
Rupees Twelve Lakh
14 HENDALING 1.00 const.:0.8 mm G.I. Pre coated / Powder coated Thickness of Insulation: 25mm,PUF injected having density 40 to job
TwentyFive Thousand Only
UNIT 42 kg/m3. ,Colour:As approved by CLIENT CONDENSING UNIT :
Condensing unit for AHU with all assesories and instalation (Copper pipie provide 3 mtr Only
Extra will charged extra) consider 1200 sqfeet insulation and ducting
Item No. Quantity Item Description Unit Rate
Double Dome OT Light with Ceiling mounted Double Dome LED OT lights having following features and
enclosed technical specifications, having Mobile App Connectivity, Battery Backup
-Light intensity Ec - 160 000 & 160 000 lux, - Light intensity adjustment - 10 – 100% (using Digital Capacitive
Touch (Fully Remote Controlled)
- Color temperature Tc (with adjustment)
-Light field diameter d10 at Ec - 100 - 150 mm
-Working range - 1 m Rupees Three Lakh Ninety
15 OT Light 1.00 Nos. 390000.00
-Color rendering index 93Ra Thousand Only
- Focusing Preset: Adjustable
- LED Average life - 50000-60000 hrs
- Diameter of Light - not less than 650 mm per dome
- Power Consumption - not more than 120W
OT Light should be BIS marked; manufacturer should have CDSCO License for this product under Class A,
Compliant to IEC standards such as IEC60601-1:2005+A2:2020, IEC 60601-2-41:201 (Relevant Test Certificates
to be submitted with Bid) Clause-wise Technical Compliance to be
Single-arm surgery/anesthesia pendant designed for Operating Theatres should feature a compact, modular
configuration to meet the precise requirements of hospitals, enabling customization to suit specific operational
needs of both Operating Theatres and Intensive Care Units. It should be equipped with robust ceiling support
capable of mounting a selection of arms. The extension arm, pivotal for functionality, should allow horizontal
movement with a radius of 800-900mm and provide a level rotation ranging from 0 to 330/340 degrees, with both
the extension arm and terminal box designed to rotate together and independently for maximum versatility. The
pendant should support a net loading capacity of min. 100 kg, accommodating a variety of medical instruments
and devices securely. For medical and electrical services, it should offer configurations that include at least two
oxygen outlets, two vacuum outlets, one medical air, one medical air at 7 bar, and an optional nitrous oxide outlet
(In-scope of MGPS vendor) Additionally, there should be six main sockets, each capable of supporting 5 to 15 Rupees Two Lakh
16 Pendant 1.00 Nos. 284000.00
amps, conforming to universal standards to facilitate the operation of various medical and electronic devices. In EightyFour Thousand Only
terms of materials and construction, the pendant should be crafted from high-strength aluminum alloy with a
sealed design to enhance durability and maintain sterile conditions. The arm itself should be made from high-
density aluminum alloy extrusion, ensuring both strength and reliability. Installation of the pendant should be
ceiling-mounted to provide a reliable and firm setup, optimizing space usage in the Operating Theatre or ICU
while seamlessly integrating with existing medical systems for managing medical gas, electrical services, data
communication, and equipment. Additionally, the pendant should include practical features such as a stainless
steel IV pole and a ward vacuum unit clamp to further enhance its utility in a medical setting. With a net weight of
approximately 105 kg, accessible by the equipment carrier, the pendant should be robust yet manageable,
ensuring it meets the rigorous demands of modern medical environments.
Rupees Three Lakh
17 UPS 1.00 Providing and fixing UPS (10KVA) Of Good Quality as directed by engineer incharge job
SeventyFive Thousand Only
Medical Gas Pipe Line Of Required dia for OT oxygen , Vaccum , Air.. Etc reuired Point(from existing line ) as
Rupees Three Lakh
18 MGPS 1.00 directed by engineer incharge from Outer Nearest Passage to OT Pendant Rate Including , Alarm , Valve (for all job
FourtyFive Thousand Only
line) , Point ,Flowmeter and Probe . if alredy then no payment given
Item No. Quantity Item Description Unit Rate
RUPEES FIFTY NINE LAKH(S) FORTY THREE THOUSAND FIFTY ONLY
( Percent should be written in figures and words ) of the Estimated rates mentioned above. Amount of my/our tender works out as under.
Estimated Amount put to tender Rs.
Add/Deduct ___________% above/ below Rs.
In words Rupees:-
1 All works shall be carried out as per Public Work Department Handbook and other specification of Division or as directed.
2 All the columns in Schedules should be filled in ink and the total of the entries ink last column should be struck by the contractor under his signature
3 Rates quoted include clearance of site ( prior commencement of work and at its close ). In all respect and hold good for work under all condition, site, moisture, weather etc.
4 Serviceable material available ( if any ) after Demolishing / Dismentalling any item should be hand over to the concerned PIU Site Engineer In Charge as per instruction.
Signature of concrtactor with seal Signature of conctracting authority with seal
Dy.Executive Engineer Executive Engineer
PIU,Sabarkantha PIU,Sabarkantha
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01-Make List-4171-06-10-2017.pdf
02-Make List - Civil Items-05-02-2020.pdf
Building-Specification.pdf
Electrical-Specification.pdf
Ele-List of Approved Products-FINAL.pdf
19-Special Conditions-07-02-2025.pdf
GRs and Conditions-11-06-24.pdf
Insurance Clause-03-11-2025.pdf
4. SBD SDH Khedbrahma.pdf
5. Schedule-B Modular OT SDH Khedbrahma.pdf
7. Drawing Modular OT SDH Khedbrahma.pdf
Tender Details-113-13.pdf
6372 Make List 14.10.2025.pdf
01-Corrigendum-01.pdf
Download all tender documents and submit your bid