| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC D NO 5 13 24 1 BEHIND SAHUWALA CYLINDERS IDA AUTONAGAR VISAKHAPATNAM 530 012 | VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530012 | ₹2.5 Cr Quoted ₹2.7 Cr | L1 | Accepted-AOC After deduction of Schedule of Credit of Amount 1483280 rupees |
| 2 | L2₹2.8 Cr+₹10.8 L (4.07%)Rejected-Finance 11 SANJIV BAUG SOCIETY NEW SHARDA MANDIR ROAD PALDI AHMEDABAD GUJARAT 380007 | AHMADABAD | GUJARAT | 380007 | ₹2.8 Cr+₹10.8 L (4.07%) | L2 | Rejected-Finance Other than Lowest Bidder |
| 3 | L3₹3.7 Cr+₹1.0 Cr (38.6%)Rejected-Finance | ₹3.7 Cr+₹1.0 Cr (38.6%) | L3 | Rejected-Finance Other than Lowest Bidder |
| 4 | L4₹3.7 Cr+₹1.0 Cr (38.7%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | ₹3.7 Cr+₹1.0 Cr (38.7%) | L4 | Rejected-Finance Other than Lowest Bidder |
| 5 | Rejected-Technical III 6 7 2ND FLOOR ABOVE BANK OF BARODA GOPINATH BAZAR DELHI CANTT 110 010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | - | - | Rejected-Technical NO in WLR HQ CEEC for QE June 2020 |
Tender Value
₹5 Cr
EMD Value
₹5.8 L
Closing Date
3 Mar 2020, 6:00 pmClosed
Chief Engineer Navy Visakhapatnam
HQ Chief Engineer Navy, MES, Station Road, Visakhapatnam - 530 004
SPECIAL REPAIRS FOR REPLACEMENT OF 12 NOS BER LIFTS UNDER GE U 1 VISAKHAPATNAM
2018_MES_217539_2
CE NAVY/VIZ/TOKEN/22 OF 2018-19
Open Tender
Miscellaneous Works
Item Rate
270 days
GE U -1, VISAKHAPATNAM
As per NIT
8 documents required · 8 mandatory
₹2,000
Garrison Engineer U-1, Visakhapatnam
₹5.8 L
Yes
24 Dec 2020
7 Dec 2019
5 Mar 2020
7 Dec 2019
3 Mar 2020
12 Feb 2020
Amount
SCHEDULE 'A' PART-I PHASE -I & II
Dismantling existing electrically operated passenger lift (G+9) installed at various locations of capacity 680 Kgs complete including control panel motors and gear boxes power control and trolly wiring, limit switches, levelling devices, ropes, sheaves, counter weights, with guards, buffers, joists, beams, and call indicators car as a whole including all guide rails landing doors etc including any other accessories all as specified and directed. ( Urvashi, Padmini, Ragini, Nandini, Yamini, Sagar, Zameer- 7 Nos )
Dismantling existing electrically operated passenger lift (G+14) installed at various locations of capacity (884 Kgs- 2 Nos, 544 Kgs- 2 Nos) complete including control panel motors and gear boxes power control and trolly wiring, limit switches, levelling devices, ropes, sheaves, counter weights, with guards, buffers, joists, beams, and call indicators car as a whole including all guide rails landing doors including any other accessories all as specified and directed. ( Jhelum-2, Mahanadi-2)
Dismantling existing electrically operated passenger lift(G+5) installed at various locations of capacity 544 Kgs complete including control panel motors and gear boxes power control and trolly wiring, limit switches, levelling devices, ropes, sheaves, counter weights, with guards, buffers, joists, beams, and call indicators car as a whole including all guide rails landing doors including any other accessories all as specified and directed. ( Arjuna-1 ) Notes: For Item No. 1, 2 & 3 after dismantling and taking down old lifts- All Landing door opening are to be closed/blocked with wooden shutters for the safety of people.
a) Fire man switch at Ground Floor landing door.
b) Automatic rescue device (A.R.D) during power failure including manual operation provision with suitable capacity of battery designed for running the lift with full load.
c) Battery operated emergency light (LED ceiling fitting ), alarm (speaker for emergency alarm system to be fixed) and stop button in car with rechargeable arrangement for battery .
d) Six sleek circular LED light fitting 5W-4 Nos in false ceiling.
e) One sleek circular PVC heavy duty fan 300 mm sweep in false ceiling. Make for (c), (d) and (e) : Philips/ Bajaj / Havells / Crompton Greaves.
f) Aluminium chequered plate (3mm thick) as flooring joint in chequered plate should not more than one and top covering with PVC flooring complete.
g) Non stop button /independent operation
h) Over load warning indicator both audio and visual type with tripping system having relays etc (overload protection/tripping system).
j) Front landing door of stainless steel moon rock finish operations with a minimum time of 10 seconds and up to a maximum time of 30 seconds.
k) Car size shall be in confirmity with IS -3534-1976 and body to be stainless steel of 16 gauge SS moon rock finish with stainless steel hand rail 38mm hairline finish
l) Set of three in number limit switches at the bottom and top most position of lift hoist ways as specified in IS
m) Hand rail 38mm round SS finish
n) Opening with mirror of 5mm thick 200X600 mm size in all the doors (Car)
o) Specification plate with complete details.
p) Continous earthing for machine and equipments.
q) Steel Wire rope of adequate size as per relevent IS and as per manufacturer specification
r) Other standard fixtures and fittings like guide rails, sheaves, counter weights with guards ,buffers, gear unit breakes, control panel ,locks ,governor ,car operational panel,power, control and trailing cables complete.
s) Full length display indicator panel.
t) Main drives and control shall be of latest , high effective and low power consumption.
u) Suitable phase reversal relay shall be provided on the controller to protect lift/equipment against phase reversal, phase failure and low voltage.
v) Stainless steel front opened landing door with small opening for vision of size 200mm x 800mm with toughened glass not less than 8mm thick.
w) Intercom be connected with nearest security post
All as per item no.4 here-in-before but 8 passenger lift (544 Kgs) Capacity(G+14) but with SS moon rock finish and 20mm thick granite flooring complete. (Location/Building: Jhelum-01, Mahanadi-01)
All as per item no.4 here-in-before but 10 passenger lift (680 Kgs) Capacity(G+9) but with SS moon rock finish and 20mm thick granite flooring complete. (Location/Building: Urvashi, Padmini,Ragini, Nandini, Sagar, Yamini, Zameer)(One in each Building)
All as per item no.4 here-in-before but 8 passenger lift (544 Kgs) Capacity(G+5) but with SS moon rock finish and 20mm thick granite flooring complete. (Location/Building- Arjuna at INS Circars)
Earthing complete with galvanised steel earth plate of electrode 600X600X 6mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below groundlevel) with top edge of the plate not less then 1.5 metres below normal ground level, connected galvanised earth strip of size 32X6 mm by means of bolts, nuts,checknuts and washers galvanised iron or steel all as shown in electrical plate No. 3 connected to earthing test point all as specified or indicated including testing on completion including taking down old GI earth plate all as specified and directed. Note: The rate deemed to be included for necessary excavation/earth work, drilling of holes for electrode, PCC 1:3:6 type C1(Using 20mm graded stone aggregate), RCC cover slab 50mm thick with 1:2:4 type B1(Using 20mm graded stone aggregate), Reinforcement 8mm dia TMT bars of 140mm C/C both ways with suitable handles, watering pipe 20mm dia light grade, Funnel, Charcoal, salt and galvanised earth strip of size 32X6 mm upto 7.50m.
Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 25X3 mm aluminium strip complete with saddles and fixing screws for fitting the strip including taking down old Aluminium strip all as directed.
SCHEDULE 'A' PART-II PHASE -III COMPREHENSIVE MAINTENANCE OF LIFTS AFTER DEFECTS LIABILITY PERIOD OF 02 YEARS
Comprehensive maintenance of Electrically Operated 13 passenger lifts(884 Kgs) to serve G+14 upper floors all as mentioned vide SI No. 4 of Sch "A" Phase-I Jhelum-01, Mahanadi-01 (Two Lifts) during 1st year after expiry of defects liability period all as specified and directed
All as per description of item No. 10.00 but second year after expiry of defects liability period.
All as per description of item No. 10.00 but third year after expiry of defects liability period.
Comprehensive maintenance of Electrically Operated 08 passenger lifts(544 Kgs) to serve G+14 upper floors all as mentioned vide SI No. 5 of Sch "A" Phase-I Jhelum-01, Mahanadi-01 (Two Lifts) during 1st year after expiry of defects liability period all as specified and directed
All as per description of item No. 13.00 but second year after expiry of defects liability period.
All as per description of item No. 13.00 but third year after expiry of defects liability period.
Comprehensive maintenance of Electrically Operated 10 passenger lifts(680 Kgs) to serve G+9 upper floors all as mentioned vide SI No. 6 of Sch "A" Phase-I Urvashi, Padmini,Ragini, Nandini, Sagar, Yamini, Zameer (Seven Lifts) during 1st year after expiry of defects liability period all as specified and directed
All as per description of item No. 16 but second year after expiry of defects liability period.
All as per description of item No. 16 but third year after expiry of defects liability period.
Comprehensive maintenance of Electrically Operated 08 passenger lifts(544 Kgs) to serve G+5 upper floors all as mentioned vide SI No. 7 of Sch "A" Phase-I Arjuna-01 (One Lift) during 1st year after expiry of defects liability period all as specified and directed
All as per description of item No. 19 but second year after expiry of defects liability period.
All as per description of item No. 19 but third year after expiry of defects liability period.
Note for SL No: 10 to 21 :- (i) Comprehensive maintenance consists of preventive and breakdown services including replacement of material and labour for major/minor spare parts and consumables like topping of Oils/grease/door rollers/relays/door belts/gate lock contacts and hardware like bolts and nuts including load testing of lift for satisfactory performance once in a year complete and rate quoted by the tenderer includes for the above Lifts. (ii) Preventive maintenance consists of carrying out routine check by skilled personnel as specified in Particular specifications and as directed by Engineer-in-Charge and lubricating to all moving parts, topping parts, topping up of oils as per Lubrication Chart including Material and labour for all consumable and major/minor spare parts. (iii) Breakdown maintenance consists of attending to the faults that may occur and carrying out necessary repairs to electrical, control circuits and mechanical components including materials & labour for all minor & major spare parts and consumables of the lift that may occur during the operation.
(iv) Fortnightly, quarterly maintenance registers shall be maintained and signed by the site engineer and contractor. (v) Load testing shall be arranged by the contractor to the Lift for which repairs were carried out as and when directed by Engr -in-Charge. (vi) All maintenance works shall be carried out by well qualified tradesmen and supervisor of OEM.
(vii) The quoted rate shall be deemed to be included the above aspect and for consumables such as timely toping up oils,acrylic covers, fuses, grease,waste cotton, stationery and other miscellaneous items and all minor & major spare parts. (viii) The tenderer shall submit MoU from the original manufacturer of the lift for comprehensive maintenance to undertake comprehensive maintenance during and after Defects Liability Period directly or through their nearest authorized/accredited agencies service personel. The MoU shall be submitted at least 06 months prior to issue of completion certificate of main contract as per Work Order No I.
Omega Elevators
N K BUILDERS
Escon Elevators Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .