| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L-1 | Accepted-Finance ADMITTED |
| 2 | L-2₹1.3 CrRejected-Finance GRAM GUTHNA BUZURG POST KAMHARA JANPAD LAKHIMPUR | LAKHIMPUR | UTTAR PRADESH | ₹1.3 Cr | L-2 | Rejected-Finance ADMITTED |
| 3 | L-3₹1.4 CrRejected-Finance C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | ₹1.4 Cr | L-3 | Rejected-Finance ADMITTED |
| Sl No | Description | Qty | Unit | M/S OM BALA JEE CONSTRUCTION L3 | SINGH CONTRACTOR L2 | VIRAT CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry ordinary soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming fo excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge. | 494.28 | CuM | 20 ₹9,885.6 Lowest | 72 ₹35,588.16 | 90 ₹44,485.2 |
| 2.00 | Laying C.C. 1:3:6 Mix (M-10) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 442.19 | CuM | 4,000 ₹17,68,760 Lowest | 5,403 ₹23,89,152.57 | 4,491 ₹19,85,875.29 |
| 3.00 | Supply and Installation of concrete Pannel Boundary wall height 1.800m ( Presthessed concrete of grade M-25 with 4 Nos of 4 mm STS wire) slab of size 2160 mm x 300 mm x 50 mm with fixing of same at proper position between two pillers/column with samd grade of concrete ( pre stressed with 7 Nos of STS wire) of size 2400 mm x 150 mm 150 mm with provision of edge groove (50 mm x 50 mm ) on two opposite phase for holding precast slab/Pannel including all material, Labour, T&P etc also i/c carriage at site complete. | 4,487 | RM | 2,470 ₹1,10,82,890 | 1,790 ₹80,31,730 Lowest | 1,848 ₹82,91,976 |
| 4.00 | Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete. | 19.11 | CuM | 6,000 ₹1,14,660 | 5,410 ₹1,03,385.1 | 4,496 ₹85,918.56 Lowest |
| 5.00 | Laying 12 mm thick Plaster with C.M.1:4 Mix cement & coarse sand including cost of material,labour and T&P etc.Complete. | 94.02 | SqM | 200 ₹18,804 | 172 ₹16,171.44 | 162 ₹15,231.24 Lowest |
| 6.00 | Finishing of wall with water proof cement paint of approved make and quality on new work with two coats to give an even shade, including supply of all materials,labour and T&P etc.required for proper completion of the work. | 19,163.77 | SqM | 25 ₹4,79,094.25 Lowest | 51 ₹9,77,352.27 | 51 ₹9,77,352.27 |
| 7.00 | Fabrication of mild steel of iron work in all sizes such as steel Gates including drilling holes,rivetting or welding where necessary,and also including supply of steel bolts,nuts and wastage etc.and its fixing required for proper completion of work. | 10 | Nos. | 29,000 ₹2,90,000 | 26,185 ₹2,61,850 | 21,763 ₹2,17,630 Lowest |
| 8.00 | Earth work for filling by power transported earth earth with lead beyond 200 m and upto 1.00 km Including excavation,loading,unloading Royality,manual compaction dressing and all lift complete excluding royality will be applicable from time to time on govt.order. | 8,173.6 | CuM | 30 ₹2,45,208 Lowest | 95 ₹7,76,492 | 118 ₹9,64,484.8 |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
8 Jul 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY
Janpad Bareilly main rohilkhand nahar khand ki sharda pranali ke antragat nirikshan bhavno evam rajkiye bhumi ke suraksha hetu pre cast boundary wall ke nirman ka karye.
2026_UPIDC_1164095_1
01/SE/2026-27
Open Tender
Civil Works
Item Rate
360 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹3.4 L
Yes
31 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry ordinary soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming fo excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge. | 494.28 | CuM | - | - |
| 2 | Laying C.C. 1:3:6 Mix (M-10) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 442.19 | CuM | - | - |
| 3 | Supply and Installation of concrete Pannel Boundary wall height 1.800m ( Presthessed concrete of grade M-25 with 4 Nos of 4 mm STS wire) slab of size 2160 mm x 300 mm x 50 mm with fixing of same at proper position between two pillers/column with samd grade of concrete ( pre stressed with 7 Nos of STS wire) of size 2400 mm x 150 mm 150 mm with provision of edge groove (50 mm x 50 mm ) on two opposite phase for holding precast slab/Pannel including all material, Labour, T&P etc also i/c carriage at site complete. | 4,487 | RM | - | - |
| 4 | Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete. | 19.11 | CuM | - | - |
| 5 | Laying 12 mm thick Plaster with C.M.1:4 Mix cement & coarse sand including cost of material,labour and T&P etc.Complete. | 94.02 | SqM | - | - |
| 6 | Finishing of wall with water proof cement paint of approved make and quality on new work with two coats to give an even shade, including supply of all materials,labour and T&P etc.required for proper completion of the work. | 19,163.77 | SqM | - | - |
| 7 | Fabrication of mild steel of iron work in all sizes such as steel Gates including drilling holes,rivetting or welding where necessary,and also including supply of steel bolts,nuts and wastage etc.and its fixing required for proper completion of work. | 10 | Nos. | - | - |
| 8 | Earth work for filling by power transported earth earth with lead beyond 200 m and upto 1.00 km Including excavation,loading,unloading Royality,manual compaction dressing and all lift complete excluding royality will be applicable from time to time on govt.order. | 8,173.6 | CuM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
LOT03.pdf
Tender Documents • 2.29 MB
BOQ_2182565.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].