Tender Value
₹16 L
EMD Value
₹32,000
Closing Date
13 Oct 2026, 3:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
S.E. AGRA CIRCLE
Office Complex, Sector-13, Sikandra Yojna, Agra
Construction work of toilet block in Kasturba Gandhi Balika Vidyalaya, Municipal Corporation, Hathras under the second phase in Hathras district
2026_UPHDB_1192418_1
2884/UPHDB/DW-24/217 Date 24-09-2026
Open Tender
Civil Works
Percentage
90 days
Hathras
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Executive Engineer, CDAGRA-02
₹32,000
Yes
3 Oct 2026
3 Oct 2026
14 Oct 2026
3 Oct 2026
13 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | TOILET BLOCK
Earth work in excavation in trenches for foundations and pipes cables etc in ordinary soil (loan clay or sand) including lift upto 1.5 m, lead upto 50 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer- in- charge with in a lead of 50m .(Including royalty). | 35.17 | CUM | 129.24 | ₹4,545.37 |
| 2 | Filling of good earth for filling low land pocket from 8 km distence including loading unloading & ramming watering proper compaction with 20 cm layer not exceeding work executed as per direction of engineer-in-charge complete. | 5.5 | CUM | 510.06 | ₹2,804.82 |
| 3 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors. | 10.66 | CUM | 4,960.03 | ₹52,893.76 |
| 4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not excluding 8km from the site of work and including watering dressing etc. rate to include cost of all materials, labour and T&P etc.required for proper completion of the work. | 4.19 | CUM | 1,546.37 | ₹6,479.29 |
| 5 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4)Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 5 liters/sqm (6) Treatment of soil apron along external perimeter 5 liter per SQM. | 107.91 | SQM | 225.76 | ₹24,361.76 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Above plinth to floor-V lvl Below Plinth
(ii) R.C.C. work in Plinth Beam | 1.5 | CUM | 6,586.49 | ₹9,879.74 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Above plinth to floor-V lvl (i) R.C.C. work in Lintel | 0.89 | CUM | 8,377.51 | ₹7,455.98 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Above plinth to floor-V lvl
(i) R.C.C. work in Beam | 0.48 | CUM | 8,377.51 | ₹4,021.2 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Above plinth to floor-V lvl
(iv) R.C.C. work in Slab | 4.63 | CUM | 8,377.51 | ₹38,787.87 |
| 10 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. with water proof ply 12 mm thick | 26.18 | SQM | 613.05 | ₹16,049.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
07THECHI_HATHRAS_compressed.pdf
Tender Documents • 3.17 MB
07FINHATHRAS.pdf
Tender Documents • 1.04 MB
BOQ_2250514.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .