| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.8 LAdmitted-Finance BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | UNA | HIMACHAL PRADESH | 174301 | ₹69.8 L | L1 | Admitted-Finance |
| 2 | L2₹75.0 L+₹5.2 L (7.49%)Admitted-Finance SET NO 75 TYPE III BROACK HURST CHHOTA SHIMLA TEHSIL DISTRICT SHIMLA HP 171002 | SHIMLA | HIMACHAL PRADESH | 171002 | ₹75.0 L+₹5.2 L (7.49%) | L2 | Admitted-Finance |
| 3 | L3₹90.3 L+₹20.5 L (29.3%)Admitted-Finance | ₹90.3 L+₹20.5 L (29.3%) | L3 | Admitted-Finance |
| 4 | L4₹1.0 Cr+₹32.3 L (46.3%)Admitted-Finance | ₹1.0 Cr+₹32.3 L (46.3%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical non responsive |
| Sl No | Description | Qty | Unit | GAURAV SHARMA L2 | MAHERBAN RANA L4 | Ankit Thakur Contractor L1 | PAWAN KUMAR SHANDIL L3 |
|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. | |||||||
| 1.01 | All kinds of soil | 78.79 | Per Cubic Meter | 200 ₹15,758 Lowest | 250 ₹19,697.5 | 270 ₹21,273.3 | 300 ₹23,637 |
| 2.00 | Stone /Boulder filling under floor dry hand packed including carriage of material upto all leads and lifts and as per direction of Engineer incharge. | 53.29 | Per Cubic Meter | 2,200 ₹1,17,238 | 1,200 ₹63,948 Lowest | 1,300 ₹69,277 | 2,000 ₹1,06,580 |
| 3.00Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. | |||||||
| 3.01 | Ordinary rock | 33.77 | Per Cubic Meter | 300 ₹10,131 | 250 ₹8,442.5 Lowest | 275 ₹9,286.75 | 400 ₹13,508 |
| 4.00Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. | |||||||
| 4.01 | All kinds of soil | 7.17 | Per Cubic Meter | 100 ₹717 Lowest | 300 ₹2,151 | 300 ₹2,151 | 400 ₹2,868 |
| 4.02 | Ordinary or hard rock | 3.07 | Per Cubic Meter | 200 ₹614 Lowest | 300 ₹921 | 300 ₹921 | 300 ₹921 |
| 5.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. | |||||||
| 5.01 | All kinds of soil. | 66.68 | Per Cubic Meter | 200 ₹13,336 Lowest | 350 ₹23,338 | 300 ₹20,004 | 300 ₹20,004 |
Tender Value
₹90.7 L
EMD Value
₹1.8 L
Closing Date
20 Jul 2026, 11:00 amClosed
Executive Engineer
O/O Project Director HPTDB Shanti Bhawan Phase 3 Kangnadhar Shimla 9
Proposed Upgadation and Renovation of Damaged Green Tax Barrier, Aloo Ground, Manali, Tehsil Mandi, District Kullu, H.P
2026_DTCA1_138877_1
Proposed Upgadation and Renovation of Damaged Green Tax Barrier, Aloo Ground, Manali, Tehsil Mandi
Open Tender
Civil Works
Item Rate
180 days
As Per Tender Docunent
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Yes
Director Tourism and Civil Aviation Shimla
₹1.8 L
24 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. | |||||
| 1.01 | All kinds of soil | 78.79 | Per Cubic Meter | - | - |
| 2 | Stone /Boulder filling under floor dry hand packed including carriage of material upto all leads and lifts and as per direction of Engineer incharge. | 53.29 | Per Cubic Meter | - | - |
| 3Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. | |||||
| 3.01 | Ordinary rock | 33.77 | Per Cubic Meter | - | - |
| 4Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. | |||||
| 4.01 | All kinds of soil | 7.17 | Per Cubic Meter | - | - |
| 4.02 | Ordinary or hard rock | 3.07 | Per Cubic Meter | - | - |
| 5Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil including carriage of material up to all leads and lifts and as per direction of Engineer incharge dumping site/disposal site shall be arranged by the contractor at he own cost and nothing shall be paid extra. | |||||
| 5.01 | All kinds of soil. | 66.68 | Per Cubic Meter | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
TenderDocforGreenTaxbarrierManali.pdf
Tender Documents • 2.22 MB
BOQ_205678.xls
BOQ • 0.83 MB
extensionofbidsubmission.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .