| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC SREELAKSHMI HOUSE KOLAKKOTTUCHOLA P O MALAPPURAM KERALA | MALAPPURAM | MALAPPURAM | KERALA | 676517 | ₹1.0 Cr Quoted ₹1.1 Cr | L1 | Accepted-AOC lowest |
| 2 | L2₹1.1 Cr+₹2.1 L (1.86%)Rejected-AOC MELMURI | ₹1.1 Cr+₹2.1 L (1.86%) | L2 | Rejected-AOC 2nd lowest |
Tender Value
₹1.0 Cr
EMD Value
₹50,000
Closing Date
9 Dec 2022, 3:00 pmClosed
The Regional Project Director, KRWSA Malappuram
Kerala Rural Water Supply and Sanitation Agency, Regional Project Management Unit, Malappuram, MMC.X/108-112, UMK Tower, Uphill, Jubilee Road, Near Passport Office, Malappuram P.O. - 676 505
Conversion of 177no.s domestic wells into protected and sustainable drinking water source at Kattippara, Purameri, Maniyur GPs in Kozhikkode Dist, Pothukallu and Chaliyar GPs in Malappuram dist and Kavassery,Ayalur and Pallassana GPs in Palakkad dist
2022_KRWSA_533112_1
01/WEL/KRWSA/MPM/KMP/2022
Open Tender
Civil Works - Water Works
Item Rate
90 days
Kozhikkode and Palakkad
As per NIT
7 documents required · 7 mandatory
₹5,000
₹50,000
26 Jan 2023
25 Nov 2022
12 Dec 2022
25 Nov 2022
9 Dec 2022
25 Nov 2022
25 Nov 2022 - 30 Nov 2022
Amount
Conversion of Domestic wells into protected and sustainable drinking water source-For wells in Kozhikode District (70 nos)
Supply and fixing of gutter pipe with 160 mm PVC 6kg/cm2 at the edge of the sloped roof including all clamping/ welding clamps for holding the gutter pipes in the position etc including cost of all specials, end closures, tees and labour charges etc complete.
Supply of uPVC Pipe, IS 4985: 2000 , 6kg/cm2, 75mm Dia..
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :" Ordinary Rock. (Ref. Item No. 2.13
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).75 mm nominal outer dia pipes.
Supplying and fixing 75mm PVC Flush valve with specials.
Recharge pit Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Supplying and packing of 40mm stone aggregate (shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
Supplying and packing of 20mm stone aggregate (shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
Supplying and packing of 6mm stone aggregate (shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
Supplying and packing of fine sand (hard and clean, free from clay, dust and other impurities) including cost of materials, labour charges and conveyance of materials up to 5 km and as per the directions of the department officers etc. complete and as per CPHEEO specification.
Well: Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work50 mm dia nominal bore
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work40 mm dia nominal bore
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Desilting open wells of dia upto 2.5m and depth upto 7.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pumset of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc complete.
Desilting open wells of dia 2-6m and depth upto 10.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pumset of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc complete.
Conversion of Domestic wells into protected and sustainable drinking water source-For wells in Malappuram District (44 nos)
Supply and fixing of gutter pipe with 160 mm PVC 6kg/cm2 at the edge of the sloped roof including all clamping/ welding clamps for holding the gutter pipes in the position etc including cost of all specials, end closures, tees and labour charges etc complete.
Supply of uPVC Pipe, IS 4985: 2000 , 6kg/cm2, 75mm Dia..
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :" Ordinary Rock. (Ref. Item No. 2.13
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).75 mm nominal outer dia pipes.
Supplying and fixing 75mm PVC Flush valve with specials.
recharge pit : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Supplying and packing of 40mm stone aggregate (shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
Supplying and packing of 20mm stone aggregate (shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
Supplying and packing of 6mm stone aggregate (shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
Supplying and packing of fine sand (hard and clean, free from clay, dust and other impurities) including cost of materials, labour charges and conveyance of materials up to 5 km and as per the directions of the department officers etc. complete and as per CPHEEO specification.
Well : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work50 mm dia nominal bore
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work40 mm dia nominal bore
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Desilting open wells of dia upto 2.5m and depth upto 7.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pumset of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc complete.
Desilting open wells of dia 2-6m and depth upto 10.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pumset of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc complete.
Conversion of Domestic wells into protected and sustainable drinking water source in Palakkad District (67 nos)
Supply and fixing of gutter pipe with 160 mm PVC 6kg/cm2 at the edge of the sloped roof including all clamping/ welding clamps for holding the gutter pipes in the position etc including cost of all specials, end closures, tees and labour charges etc complete.
Supply of uPVC Pipe, IS 4985: 2000 , 6kg/cm2, 75mm Dia..
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidatingeach deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :" Ordinary Rock. (Ref. Item No. 2.13
Laying UPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure (excluding cost of pipes and specials).75 mm nominal outer dia pipes.
Supplying and fixing 75mm PVC Flush valve with specials.
Recharge pit Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Supplying and packing of 40mm stone aggregate (shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
Supplying and packing of 20mm stone aggregate (shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
Supplying and packing of 6mm stone aggregate (shall be hard, clean, free from clay, dust and other impurities), stacking in standard heaps for measurement including cost, conveyance up to 5 km and labour charges for stacking, spreading, testing and as per the directions of the department officers etc. complete as per CPHEEO specifications.
Supplying and packing of fine sand (hard and clean, free from clay, dust and other impurities) including cost of materials, labour charges and conveyance of materials up to 5 km and as per the directions of the department officers etc. complete and as per CPHEEO specification.
Well : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work50 mm dia nominal bore
Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work40 mm dia nominal bore
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Desilting open wells of dia upto 2.5m and depth upto 7.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pumset of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc complete.
Desilting open wells of dia 2-6m and depth upto 10.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pumset of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc complete.
Mujeeb Rahman C
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .