Tender ID
Tender Value
₹26.8 Cr
EMD Value
₹14.9 L
Closing Date
17 Mar 2026, 12:00 pmClosed
Yes (up to 3 members)
Yes (up to 3 members)
Two Packet System
Normal Tender
Yes
27/02/2026 11:00
Lowest to Highest
120 days
Expenditure
Capital (Works)
DY.CE CON3
13 conditions · 2 needing a document upload
AS PER RFP TENDER DOCUMENT
AS PER RFP TENDER DOCUMENT
10 conditions · 1 needing a document upload
The tenderers in their bids shall indicate the details of their Jurisdictional Assessing Officer/GST (Designation, address & email Id). In case of a contract award, a copy of the LOA/Purchase Order shall be immediately forwarded by Purchaser to the Jurisdictional Assessing Officer/GST mentioned in the tenderer's bid.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The rates to be quoted by the firm shall be excluding of the GST.
Appointment of Authority Engineer for providing project management services for "Design, Procurement & Construction of RCC Box Metro tunnel including Birati UG Station building & Subways (with Entry-Exit Structures) for two underground Metro Stations (Birati & Michael Nagar) by Cut & Cover Method (Top Down with Diaphragm Wall/ Bottom Up Method with support arrangement) including architectural finishing, firefighting, water supply, sanitary installation, drainage & BLT works, E&M service, ECS Service, TVS Services, Power Supply System with 750 V DC Traction System including composite Aluminium third Rail, from Ch: 6.250 Km to Ch: 9.840 Km including all ancillary works in connection with extension of Metro Railway from Noapara to Barasat
Civil-2548-2026
. EPC-2489-2024".
Open
(Project Management Services)
1820 Days
Kolkata, West Bengal
₹0
₹14.9 L
18 Feb 2026
18 Feb 2026
3 Mar 2026
27 Feb 2026
33 items across 4 schedules · ₹26,81,63,244 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Team Leader Cum Project Manager | Man- Month | 66.00 | 3,46,331 | 2,28,57,846 |
| 2 | Lead Designer (Civil) | Man- Month | 36.00 | 1,47,597 | 53,13,492 |
| 3 | Lead Designer (Electrical) | Man- Month | 36.00 | 1,47,597 | 53,13,492 |
| 4 | Resident Engineer-Civil (Station & Tunnel) | Man- Month | 120.00 | 2,13,252 | 2,55,90,240 |
| 5 | Resident Engineer-Electrical/Mechanical | Man- Month | 60.00 | 2,26,276 | 1,35,76,560 |
| 6 | Sector Expert- Civil (Tunnel & Station) | Man- Month | 60.00 | 1,21,253 | 72,75,180 |
| 7 | Sector Expert- Civil (BLT) | Man- Month | 30.00 | 1,18,318 | 35,49,540 |
| 8 | Sector Expert- Electrical | Man- Month | 60.00 | 1,24,898 | 74,93,880 |
| 9 | Site Surveyor | Man- Month | 36.00 | 85,772 | 30,87,792 |
| 10 | Supervisor (Civil) | Man- Month | 192.00 | 83,942 | 1,61,16,864 |
| 11 | Supervisor (Electrical-ECS/TVS/E&M/ Traction) | Man- Month | 192.00 | 85,696 | 1,64,53,632 |
| 12 | S.O. - Finance | Man- Month | 60.00 | 83,942 | 50,36,520 |
| 13 | Design Engineer -Civil | Man- Month | 72.00 | 85,309 | 61,42,248 |
| 14 | Design Engineer- Electrical | Man- Month | 72.00 | 85,309 | 61,42,248 |
| 15 | Software professionals (Experts in BIM-5D, Project Management software, Autocad, MS-Projects & Excel etc.,) | Man- Month | 60.00 | 53,466 | 32,07,960 |
| 16 | Legal Expert | Man- Month | 60.00 | 1,34,667 | 80,80,020 |
| 17 | Computer Operator cum Stenographer | Man- Month | 670.00 | 35,557 | 2,38,23,190 |
| 18 | Office Attendant | Man- Month | 900.00 | 18,672 | 1,68,04,800 |
| 19 | Draftsman/ AutoCAD Operator | Man- Month | 72.00 | 45,311 | 32,62,392 |
| 20 | Independent Safety & SHE Expert | Man- Month | 36.00 | 1,06,244 | 38,24,784 |
| 21 | Project Architect | Man- Month | 36.00 | 1,15,610 | 41,61,960 |
| 22 | Legal Assistant | Man- Month | 60.00 | 83,038 | 49,82,280 |
| 23 | Sector Expert-Finance | Man- Month | 60.00 | 1,06,276 | 63,76,560 |
| Schedule total | ₹21,84,73,480 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Outline_Construction_Specification-Civil_worksEPC_2489_2024.pdf
ATTACHMENT
OUTLINE_CONSTRUCTION_SPECIFICATION_ARCHITECTURAL_FINISHES_EPC_2489_2024.pdf Cont EPC
ATTACHMENT
OUTLINE_DESIGN_SPECIFICATIONS-CIVIL_EPC_2489_2024.pdf
ATTACHMENT
OUTLINE_DESIGN_SPECIFICATIONS-ARCHITECTURE_EPC_2489_2024.pdf
ATTACHMENT
EMPLOYERS_REQUIREMENT_EPC_2489_2024.pdf
ATTACHMENT
SAFETY_HEALTH_ENVIRONMENT_REQUIREMENTS_EPC_2489_2024.pdf
ATTACHMENT
FinalAgreementEPC-2489-2024-Part-1of2.pdf
ATTACHMENT
OUTLINE_CONSTRUCTION_SPECIFICATION_ARCHITECTURAL_FINISHES_EPC_2489_2024.pdf
ATTACHMENT
FinalAgreementEPC-2489-2024-Part-2of2.pdf
ATTACHMENT
RPF-for-PMS-Civil-2548-2026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .