Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.6 LAdmitted-Finance | -59.99% | ₹32.6 L | L1 | Admitted-Finance |
| 2 | L2₹58.6 L+₹26.0 L (79.9%)Admitted-Finance | -28.03% | ₹58.6 L+₹26.0 L (79.9%) | L2 | Admitted-Finance |
| 3 | L3₹62.6 L+₹30.1 L (92.5%)Admitted-Finance AT KENTAL PS KISHORENAGAR DIST CUTTACK | CUTTACK | ODISHA | 752120 | -23.00% | ₹62.6 L+₹30.1 L (92.5%) | L3 | Admitted-Finance |
| 4 | L4₹64.3 L+₹31.7 L (97.5%)Admitted-Finance | -20.99% | ₹64.3 L+₹31.7 L (97.5%) | L4 | Admitted-Finance |
| 5 | L5₹65.1 L+₹32.5 L (100.0%)Admitted-Finance | -19.99% | ₹65.1 L+₹32.5 L (100.0%) | L5 | Admitted-Finance |
Tender Value
₹81.4 L
EMD Value
₹81,400
Closing Date
20 Aug 2026, 5:30 pmClosed
Superintending Engineer., Nimapara Irr Divn.
Office of the Superintending Engineer Nimapara Irrigation Division, Nimapara Puri.
Improvement to Bhargavi Left Embankment from RD 11.00Km. to RD 13.00Km.
2026_CELBB_138087_18
e-Procurement Notice No.- 04 of 2026-27
Open Tender
Civil Works - Others
Percentage
330 days
Nimapara
Please refer Tender Documents
3 documents required · 3 mandatory
₹10,000
₹81,400
Yes
6 Sept 2026
6 Aug 2026
21 Aug 2026
6 Aug 2026
20 Aug 2026
6 Aug 2026
6 Aug 2026 - 17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth up to 300 mm & removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking the serviceable materials to be used or auctioned up to a lead of 1000 Meters including removal and disposal of top organic soil not exceeding 150mm in thickness etc. complete as per direction of the Engineer-in-charge. | 12,730 | One Sqm | 8.6 | ₹1,09,478 |
| 2 | Earthwork in all kinds of soil except sand, sandy or slushy soil in borrow area by mechanical means and transportation of excavated earth by mechanical means with all leads, lifts, delfts, rehandling, conveyance, royalty,EMF,DMF, Additional charges of materials, labour cess, including loading and unloading the same on prepared and approved surface including rough dressing and breaking the clods to maximum 5 cm. to 7 cm. in size and laying in layers not exceeding 22.5 cm.layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area with labour, T & P etc. complete as per direction of the Engineer-in-charge. (Earth will be arranged by the bidder at his own cost and risk. Earth should be free from clods, roots, brickbats and other debris.. Measurement of the fill to be taken on the finished level section) only | 9,412.2 | One Cum | 300.6 | ₹28,29,307.32 |
| 3 | Collecting , supplying and stacking good quality moorum & sand at work site in irregular box heaps of size 1.50 x 1.50 x0.50M to be measured as one cum and conveying from stacks and mixing the moourm and sand in proportion 60:40(60% :40%) and spreading the admixture over the prepared surface not exceeding 100 mm in layers to required thickness including watering and compacting to required density with P.R.R including cost,conveyance,royalty and all other taxes of all materials and labour, T &P,EMF,DMF, Additional charges of materials,cess with hire and running charges of P.R.R. including all leads, lifts and delifts in all respect etc. .complete as per direction of the Engineer-in-charge. | 1,425 | One cum | 1,562.5 | ₹22,26,562.5 |
| 4 | Collecting, supplying and stacking at work site for premeasurement of IRC Grade-II metal (63 mm to 45mm) using gravel/ moorum of specific size to water bound macadam from stacks and hand packing rolling with 3 wheeled steel roller 8-10 tones in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill the interstices of coarse aggregates, watering and compacting to the required density and thickness of 100mm as per clause No.404 of MOSRT& H specification for road and bridge work (4th revision ) and consolidation with P.R.R. including hire and running charges of P.R.R. with all cost, carriage, royalty, labour, T&P, EMF,DMF, Additional charges of materials, cess etc.complete as per direction of the Engineer-in-charge. | 534.38 | One Cum | 3,824.7 | ₹20,43,843.19 |
| 5 | Collecting, supplying and stacking good quality laterite moorum at work site in standard box heap size of 1.50M x 1.50M x 0.50M to be measured as 1 cum for pre-measurement beyond the trafficable berms and conveying from stacks, spreading mrooum with all leads, lifts and delifts, handling and rehanding charges including cost, conveyance, royalty of all material, EMF,DMF, Additional charges of materials,etc. labours and hire charges of T&P materials required for the work, watering and consolidation with PRR including all incidental charges with labour cess complete as per specification and direction of the Engineer-in-charge. | 584.25 | One cum | 1,586 | ₹9,26,620.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.38 MB
BOQ_604939.xls
BOQ • 0.24 MB
BidDocumentNID90.pdf
Tender Documents • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .