Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.8 LAccepted-AOC AT PO NEAR RELIANCE PETROL PUMP R CANTT DISTT RAMGARH JHARKHAND | RAMGARH | RAMGARH | JHARKHAND | 100018 | L-1 | Accepted-AOC Techno-commercially acceptable | |
| 2 | L-2₹6.2 L+₹37,905.14 (6.53%)Rejected-Finance INDRA NAGAR RANCHI ROAD RANCHI ROAD RANCHI ROAD RAMGARH HAZARIBAG JHARKHAND 829117 | RAMGARH | JHARKHAND | 829117 | L-2 | Rejected-Finance techno-commercially not acceptable | |
| 3 | L-3₹6.9 L+₹1.1 L (19.7%)Rejected-Finance AT REAL KAJORA COLLIERY P O KAJORA GRAM DIST PASCHIM BARDHAMAN WEST BENGAL 713338 | KAJORA GRAM | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | L-3 | Rejected-Finance techno-commercially not acceptable | |
| 4 | Rejected-Technical 521 UBI ROAD SINGRAULI SINGRAULI SINGRAULI MADHYA PRADESH 486889 | SINGRAULI | MADHYA PRADESH | 486889 | - | Rejected-Technical Technically not acceptable |
Tender Value
₹6.3 L
EMD Value
₹8,000
Closing Date
28 Mar 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(EnM(
GM Office Charhi
Rewinding and repairing of two number HT Motors 350KW 3.3KV 1490 RPM Induction motor Crompton Greeves make and 240KW 3.3KV 1490 RPM Induction motor Marathon make of PEOCP under Hazaribagh Area
2023_CCL_275710_1
GM(H)/EnM/Tender/22-23/75
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
PEOCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,000
16 May 2024
17 Mar 2023
29 Mar 2023
18 Mar 2023
28 Mar 2023
18 Mar 2023
18 Mar 2023 - 21 Mar 2023
Amount
Cost of DPC Copper Strip (60 Coil =280 Kg) (Cost of copper to be quoted less Scrap copper cost)
Cost of Insulating Material
Cost of Labour Charge
Cost of moulding with class H insulation on DGC Mica as required for one coil
Contractor Profit
Cost of DPC Copper Strip (60 Coil =192 Kg) (Cost of copper to be quoted less Scrap copper cost)
Cost of Insulating Material
Cost of Labour Charge
Cost of moulding with class H insulation on DGC Mica as required for one coil
Contractor Profit
Total impact of GST for the purpose of CTC
Rajneesh Electricals
Maa Chhinnamasta Electrical Works
M.k. Traders
techsummary_285398.pdf
PDF • 0.68 MB
finsummary_285398.pdf
PDF • 0.68 MB
WO.pdf
PDF • 0.31 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .