Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance CONTRACTOR WARD NO 10 DEVINAGAR PAONTA SAHIB DISTRICT SIRMOUR H P | SIRMAUR | HIMACHAL PRADESH | 173001 | Admitted-Finance |
| 2 | Admitted-Finance GHUMARWIN DIVISION HP PWD GHUMARWIN | Admitted-Finance |
Tender Value
₹7.3 L
EMD Value
₹18,162
Closing Date
10 Jun 2022, 11:00 amClosed
Executive Officer
Municipal Council Paonta Sahib
Construction of Shops in front of Civil Hospital Paonta Sahib in Ward No 7
2022_UDDHP_61158_3
JEMCB/0522/923
Open Tender
Civil Works
Item Rate
60 days
Paonta Sahib
Please refer Detailed Tender Notice
3 documents required · 3 mandatory
₹500
Executive Officer
₹18,162
Yes
17 Jun 2022
28 May 2022
10 Jun 2022
28 May 2022
10 Jun 2022
28 May 2022
Amount
Earth work in ecxcavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains 9not exceeding 1.5m in width or10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All kind of soil.
Providing and laying in position cement of sprcified grade excluding the cost of centering and shuttering- all work up to plinth level: 1:4:8 (1 cement : 4 sand : 8 graded stone aggregate 40 mm nominal size) plinth including carriage of material in all leads & lifts.
Brick work with common burnt clay modular bricks of class designation 7.5 conforming in exposed brick work including making horizontal and vertical grroves 10mm wide 12mm deep complete in cement mortar 1:6 (1 cement : 6 coarse sand) above plinth level upto floor V level
Cement concrete flooring 1:2:4 ( 1 cement : 2 sand : 4 graded stone aggregate ) finished with a floating coat of neat cement including cement slurry but excluding the cost of nosing of steps et complete 40mm thick with 20mm nominal size stone aggregate
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermomechanically treated bars of grade Fe-500 D or more
Centering and shuttering including strutting, propping etc and removal of form for : Foundations, Footings, bases of columns etc for mass concrete
Centering and shuttering including strutting, propping etc and removal of form for : Lintels, beams, plinth beams, girders, bresummers and cantilevers
Providing and laying in position reinforced cement of sprcified grade excluding the cost of centering and shuttering- all work up to plinth level: 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20 mm nominal size) plinth including carriage of material in all leads & lifts.
12mm cement plaster of mix 1:4 ( 1 cement : 4 fine sand)
Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer’s specification.Two or more coats on new work
White Washing with lime to give an even shade : 13.37.1 New work (three or more coats)
Providing and fixing 1 mm thick M.S. sheet slidingshutters, with frame and diagonal braces of 40x40x6 mm angle iron, 3 mm M.S. gusset plates at the junctions and corners, 25 mm dia pulley, 40x40x6 mm angle and Tiron guide at the top and bottom respectively, including applying a priming coat of approved steel primer
Rajender Singh
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .