Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC KOICKAL H POICKATTUSSERY CHENGAMANADU KERALA | ERNAKULAM | KERALA | 683572 | ₹13.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.8 LRejected-AOC | ₹13.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ITTEERA K.I. L1 | CRISTIN M J L2 |
|---|---|---|---|---|---|
| 1.00Estimate | |||||
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 5.78 | cum | 768.82 ₹4,442.24 | 790.68 ₹4,568.55 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 1.8 | cum | 2,681.81 ₹4,827.26 | 2,758.07 ₹4,964.53 |
| 1.00 | OD127117/2025-2026:Random rubble masonry with departmental rubble in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.35 | cum | 5,839.78 ₹7,883.7 | 6,005.84 ₹8,107.88 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 9 | cum | 8,802.38 ₹79,221.42 | 9,052.69 ₹81,474.21 |
| 1.00 | OD296954/2025-2026:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 33.59 | cum | 8,137.78 ₹2,73,364.31 | 8,369.19 ₹2,81,137.83 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.92 | cum | 11,065.65 ₹65,552.91 | 11,380.32 ₹67,417.02 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 710.88 | kilogram | 118.61 ₹84,317.48 | 121.99 ₹86,720.25 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 28.83 | sqm | 885.78 ₹25,537.04 | 910.97 ₹26,263.27 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.54 | cum | 9,743.95 ₹5,261.73 | 10,021.03 ₹5,411.36 |
Tender Value
₹12.7 L
EMD Value
₹31,762
Closing Date
21 Feb 2026, 11:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer PWD Buildings Subdivision Aluva
The provisions in the estimate are solid block 12 mm plastering painting RCC belt etc complete
2026_PWD_836228_1
PWD/BLDG/TR/15565/2025_5_1_1/1
Open Tender
Civil Works - Buildings
180 days
Kurumassery
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹31,762
Yes
30 Jun 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
21 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Estimate | |||||
| 1.001 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 1 | cum | - | - |
| 1.002 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | - | cum | - | - |
| 1.003 | OD127117/2025-2026:Random rubble masonry with departmental rubble in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.004 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.005 | OD296954/2025-2026:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 1 | cum | - | - |
| 1.006 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.008 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1 | sqm | - | - |
| 1.009 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1407534.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Preagt.pdf
Tender Documents • 0.43 MB
affidavit-1.pdf
Tender Documents • 0.17 MB
formoftender.pdf
Tender Documents • 0.36 MB
instruction.pdf
Tender Documents • 0.45 MB
viewsbd.pdf
Other Document • 1.63 MB
BOQ_1407534.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid