Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.0 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹15.0 L+₹2,098 (0.14%)Accepted-AOC | 2 | Accepted-AOC 2 | |
| 3 | 3₹15.2 L+₹20,239 (1.35%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | 4₹15.3 L+₹35,382 (2.36%)Rejected-Finance | 4 | Rejected-Finance 4 | |
| 5 | 5₹15.7 L+₹74,666 (4.99%)Rejected-Finance | 5 | Rejected-Finance 5 |
Tender Value
₹22 L
EMD Value
₹33,000
Closing Date
30 Oct 2021, 4:30 pmClosed
AE
AE, Neyyattinkara Municipality
Neyyattinkara municipality Nilamel thode check dam kavalakulam ward (394/22)
2021_LSGD_447660_19
4/AEE/LSGD/NTA/21-22
Open Tender
Civil Works - Roads
Item Rate
180 days
Neyyattinkara
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹33,000
Yes
17 Dec 2021
23 Oct 2021
1 Nov 2021
23 Oct 2021
30 Oct 2021
23 Oct 2021
Amount
check dam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.7.4 : DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.23 : Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 ( cement : 3 fine sand).
50.2.3.1 : Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
S.ROBINSON
Anandhu
PAARVANA CONSTUCTIONS
Madhu j
STEPHEN D
Bidder Name
Madhu j
S.ROBINSON
ISRAYEL Y L
PAARVANA CONSTUCTIONS
Anandhu
STEPHEN D
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_638842.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .