| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.2 LRejected-AOC | ₹5.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | FRANCIS PINHERO L1 | JEFRIN PINHERO L2 |
|---|---|---|---|---|---|
| 1.00Parikappally LIS | |||||
| 1.00 | OD246424/2025-2026: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 19,684 ₹19,684 | 19,684 ₹19,684 |
| 1.00 | OD246423/2025-2026: Fully Comprehensive Annual Maintenance of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 24,697 ₹24,697 | 54,697 ₹54,697 |
| 2.00Palissery LIS | |||||
| 2.00 | OD246428/2025-2026: Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed. | 1 | job | 7,962 ₹7,962 | 7,962 ₹7,962 |
| 2.00 | OD246430/2025-2026: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 19,684.58 ₹19,684.58 | 19,684.58 ₹19,684.58 |
| 2.00 | OD246429/2025-2026: Fully Comprehensive Annual Maintenance of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 24,697.97 ₹24,697.97 | 24,697.97 ₹24,697.97 |
| 2.00 | OD62381/2025-2026:Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 1,103 ₹1,103 | 1,103 ₹1,103 |
| 2.00 | OD62382/2025-2026:Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 4,516.05 ₹4,516.05 | 4,516.05 ₹4,516.05 |
| 2.01 | OD62383/2025-2026: Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load | 1 | each | 5,615.42 ₹5,615.42 | 5,615.42 ₹5,615.42 |
Tender Value
₹3.3 L
EMD Value
₹8,133
Closing Date
28 Jan 2026, 6:00 pmClosed
Assistant Executive Engineer
Electrical Wing Irrigation Subdivision Chalakkudy
GENERAL AMC 2025 26 Parikappally Palissery Koyas Compund and Thandathikulam Fully Comprehensive Annual Maintenance Contract for the year 2025 26 General Electrical Work
2026_Irrig_827554_4
C-ETN-JAN/EL/2025-26
Open Tender
Electrical Works
365 days
Chalakkudy
Please refer Tender documents.
10 documents required · 10 mandatory
₹720
₹8,133
4 Apr 2026
19 Jan 2026
30 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
Parikappally LIS
OD246424/2025-2026: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD246423/2025-2026: Fully Comprehensive Annual Maintenance of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Palissery LIS
OD246428/2025-2026: Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed.
OD246430/2025-2026: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD246429/2025-2026: Fully Comprehensive Annual Maintenance of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD62381/2025-2026:Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD62382/2025-2026:Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD62383/2025-2026: Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD62384/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD62385/2025-2026:Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD62386/2025-2026: Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Koya's Compound LIS
OD246431/2025-2026:Fully Comprehensive Annual Maintenance contract of 1-3 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed.
OD246432/2025-2026: Fully Comprehensive Annual Maintenance of 11-30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD110558/2025-2026: Lowering down and erecting upto 1-3 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD110559/2025-2026:Lowering down and erecting 11-30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD110560/2025-2026: Lifting the upto 1-3 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD110561/2025-2026:Lifting the 11-30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Thandathikulam LIS
OD246451/2025-2026:Fully Comprehensive Annual Maintenance contract of 1-3 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed.
OD246452/2025-2026: Fully Comprehensive Annual Maintenance of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter throughout the year as required( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Common items
OD62440/2025-2026:Conveyance charge of 20-120 HP motor / pump / panel board / starter board etc pump house to workshop and bring back to pump house.
OD220220/2025-2026:Supply , Conveyance and fitting 160 A, HRC Fuse Base with suitable HRC Fuse
OD220221/2025-2026:Supply , Conveyance and fitting 125 A, HRC Fuse Base with suitable HRC Fuse
OD251269/2025-2026:Charges for rewinding the burnt rotor/stator - separate motor in to stator and rotor, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new stator/rotor lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running.
OD251270/2025-2026:S & F CURRENT TRANSFORMER -CURRENT TRANSFORMER - 120/5 A, 5 VA, accuracy class 1, Tape wound Metering CT
OD251271/2025-2026:Supply ,fixing and installation of Three Phase Ammeter accuracy class 1-digital type
OD251272/2025-2026:Supply ,fixing and installation of Three Phase Voltmeter accuracy class 1-Digitaltype
OD251273/2025-2026:Supply and fixing LED indicators for all voltage ranges - Red, Green, Black, Yellow or Orange Color.
90.14.24.2:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.2 KVAr, 3 phase, 440 V, delta connected standard duty Metalised Poly Propylene Capacitor, Cylinderical Type, suitable for direct connection to motors.
90.14.24.5:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.5 KVAr, 3 phase, 440 V, delta connected standard duty Metalised Poly Propylene Cylinderical Type Capacitor suitable for direct connection to motors.
90.14.24.7:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.7.5 KVAr, 3 phase, 440 V, delta connected standard duty Metalised Poly Propylene Cylinderical Type Capacitor suitable for direct connection to motors.
90.14.24.8:Supply & fixing the following Power Capacitors 3 phase delta connected in positon and giving connection.10 KVAr, 3 phase, 440 V, delta connected standard duty Metalised Poly Propylene Cylinderical Type Capacitor suitable for direct connection to motors.
90.15.4.1:Supply Conveyance, installation, testing and commissioning of 20W LED street light output greater than 105lumen/W 4000-6000 K with IP 66 protection LED Chip make Cree/Lumilled/Nichea with power factor greater than 0.95 at full load, internal surge protection up to 8 KV,and Aluminium pressure die-cast Powder coated housing,acrylic cover complete with THD Less than10%, power factor greater than 0.98, RoHS compliant, duly wired up for use on 230 V AC supply. Driver compartment should be seperatly accessible for maintenance (LM 79&80 certificates from NABL accredited Third party lab to be produced mentioning chip manufacturer)
90.3.21.3:Supply & installation of light fittings on 'C/U' shaped flat iron bracket Supply, conveyance, installation, testing and commissioning the light fittings of following types made from 0.5mm CRCA sheet complete with all accessories and lamps etc. directly on wall using 2 nos. 'C/U' brackets made from 20 x 3 mm MS flat, painting the flat iron bracket and giving connections with required length of 16/0.20mm 3 core copper conductor flex wire conforming to relevant ISS or extending the original wiring and giving connection etc. as required.1200 mm 1X20W LED Lamp with box type fixture
1.10.1:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group A
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1388912.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 0.47 MB
BOQ_1388912.xls
BOQ • 0.33 MB
Parikappally11263NITSBDmerged.pdf
Tender Documents • 1.66 MB
Download all tender documents and submit your bid