Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 CrAdmitted-Finance | -31.99% | ₹3.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 Cr+₹7.2 L (2.12%)Admitted-Finance R O FIRDOUS COLONY BUCHPORA SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | -30.55% | ₹3.5 Cr+₹7.2 L (2.12%) | L2 | Admitted-Finance |
| 3 | L3₹3.5 Cr+₹10.0 L (2.93%)Admitted-Finance KEDAR BADI KHAIRAGARH ROAD DONGARGARH DISTT RAJNANDGAON CHHATTISGARH 491445 | RAJNANDGAON | CHHATTISGARH | 491445 | -30.00% | ₹3.5 Cr+₹10.0 L (2.93%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 Cr+₹54.6 L (16.0%)Admitted-Finance | -21.11% | ₹4.0 Cr+₹54.6 L (16.0%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹5.0 Cr
EMD Value
₹10.0 L
Closing Date
11 May 2026, 4:00 pmClosed
executive Engineer RnB kangan
executive Engineer RnB kangan
Construction of 12 Roomed Triple Storey Building along with allied works for Girls Hr. Secondary School Kangan near Degree College
2026_PWDJK_308889_1
ENIT 05
Open Tender
Civil Works
Percentage
730 days
Kangan
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,500
executive Engineer RnB kangan
₹10.0 L
Superintending Engineer PW RnB Circle Ganderbal
26 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
11 May 2026
28 Apr 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A (Main Building) | - | - | - | - |
| 2 | Dewatering with pumps of adequate HP including Suction Delivery pipe & DG Sets, Diesel, man power etc. so as to dewater the entire site for laying foundation including plugging of inflow water complete job as per the directions of Engineer Incharge. | 504.97 | K Ltr | 167.8 | ₹84,733.97 |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1,009.8 | Cum | 187.3 | ₹1,89,135.54 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 605.88 | Cum | 218.4 | ₹1,32,324.19 |
| 5 | P/L of dry stone soling duly hand packed including all carriages loading unloading complete job before laying of mud mate in trenches incl. all carriages of material involved & head load. | 30.45 | Cum | 1,000 | ₹30,450 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 129.5 | Cum | 5,673.4 | ₹7,34,705.3 |
| 7 | Supplying and filling in plinth with Nallah boulders of (size 75mm to 150mm) under floors including, watering, ramming, consolidating and dressing including carriage of materials from approved source to site of work complete in all respects. | 543.4 | Cum | 900 | ₹4,89,060 |
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ Cum. Excess/ less cement used as per design mix is payable/ recoverable separately. All works upto plinth level | 175.44 | Cum | 8,520.15 | ₹14,94,775.12 |
| 9 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ Cum. Excess/ less cement used as per design mix is payable/ recoverable separately. All works above plinth level upto floor V level | 376.7 | Cum | 9,911.1 | ₹37,33,511.37 |
| 10 | Asumming quantity of cement as 450 kg for M-25 Design Mix, extra cement shall be paid seperatley as per the design requirement to achive the desised garde of concrete. | 552.15 | Qtls | 941 | ₹5,19,573.15 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Tendernotice_2.pdf
PDF • 1.28 MB
BOQ_1000507.xls
BOQ • 0.37 MB
Corrigendum.pdf
PDF • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .