Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹6.8 L+₹12,069.15 (1.82%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹7.2 L+₹51,047.57 (7.68%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹7.4 L+₹73,078.60 (11.0%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹7.5 L+₹80,704.22 (12.1%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | V.HARIKUMAR L4 | B V Prakash L2 | VIJAYAN J L6 | Y SANTHOSHKUMAR L5 | Hillurudheen.A L7 | SINDHU BALAN L3 | Adarshdas D A L8 | RAJESH S R L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Rubble masonry | |||||||||||
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 90 | sqm | 31.42 ₹2,827.8 | 28.82 ₹2,593.8 Lowest | 32.1 ₹2,889 | 31.74 ₹2,856.6 | 32.5 ₹2,925 | 30.48 ₹2,743.2 | 33 ₹2,970 | 75 ₹6,750 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 33.75 | cum | 2,263.28 ₹76,385.7 | 2,076.19 ₹70,071.41 | 2,312.66 ₹78,052.28 | 2,286.67 ₹77,175.11 | 2,341.24 ₹79,016.85 | 2,195.72 ₹74,105.55 | 2,389 ₹80,628.75 | 500 ₹16,875 Lowest |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 0.5 | cum | 1,383.99 ₹692 | 1,269.59 ₹634.8 | 1,414.18 ₹707.09 | 1,398.29 ₹699.15 | 1,431.66 ₹715.83 | 1,342.68 ₹671.34 | 1,461 ₹730.5 | 1,250 ₹625 Lowest |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 20.7 | cum | 1,896.32 ₹39,253.82 | 1,739.56 ₹36,008.89 | 1,937.68 ₹40,109.98 | 1,915.91 ₹39,659.34 | 1,961.63 ₹40,605.74 | 1,839.71 ₹38,082 | 2,002 ₹41,441.4 | 1,000 ₹20,700 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.2 | cum | 7,063.1 ₹29,665.02 | 6,479.23 ₹27,212.77 | 7,217.17 ₹30,312.11 | 7,136.08 ₹29,971.54 | 7,306.37 ₹30,686.75 | 6,852.26 ₹28,779.49 | 8,105 ₹34,041 | 5,000 ₹21,000 Lowest |
| 1.01 | OD154816/2025-2026:Random rubble masonry with hard stone in foundation and plinth with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 23.29 | cum | 6,714.81 ₹1,56,374.5 | 6,159.74 ₹1,43,448.03 Lowest | 6,861.29 ₹1,59,785.72 | 6,784.19 ₹1,57,990.22 | 6,946.09 ₹1,61,760.54 | 6,514.37 ₹1,51,706.65 | 7,370 ₹1,71,632.56 | 6,500 ₹1,51,372 |
| 1.01 | OD147615/2025-2026:Random rubble masonry with departmental hard stone in foundation and plinth up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand). | 25.31 | cum | 4,783.5 ₹1,21,084.74 | 4,388.08 ₹1,11,075.47 | 4,887.84 ₹1,23,725.89 | 4,832.92 ₹1,22,335.7 | 4,948.26 ₹1,25,255.31 | 4,640.71 ₹1,17,470.29 | 3,583 ₹90,696.48 Lowest | 4,500 ₹1,13,908.5 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.05 | cum | 8,871.44 ₹35,929.33 | 8,138.09 ₹32,959.26 Lowest | 9,064.96 ₹36,713.09 | 8,963.11 ₹36,300.6 | 9,177 ₹37,166.85 | 8,606.62 ₹34,856.81 | 9,366 ₹37,932.3 | 8,500 ₹34,425 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 98.17 | kilogram | 100.1 ₹9,827.32 | 91.82 ₹9,014.43 Lowest | 102.28 ₹10,041.34 | 101.13 ₹9,928.44 | 103.54 ₹10,165.04 | 97.11 ₹9,533.77 | 105 ₹10,308.38 | 110 ₹10,799.25 |
Tender Value
₹8.5 L
EMD Value
₹21,183
Closing Date
26 Sept 2026, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Special Buildings Subdivision, Ayurveda College, Thiruvananthapuram
DEPOSIT- Construction of Compound wall at the backside of Govt Ayurveda College, Panchakarma Hospital, Poojappura-civil work-General Civil Work
2026_PWD_869238_1
PWD/BLDG/TR/16865/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
Yes
₹21,183
Yes
29 Sept 2026
11 Sept 2026
28 Sept 2026
11 Sept 2026
26 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rubble masonry | |||||
| 1.001 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 90 | sqm | - | - |
| 1.002 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 33.75 | cum | - | - |
| 1.003 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 0.5 | cum | - | - |
| 1.004 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 20.7 | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.2 | cum | - | - |
| 1.006 | OD154816/2025-2026:Random rubble masonry with hard stone in foundation and plinth with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 23.29 | cum | - | - |
| 1.007 | OD147615/2025-2026:Random rubble masonry with departmental hard stone in foundation and plinth up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand). | 25.31 | cum | - | - |
| 1.008 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.05 | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 98.18 | kilogram | - | - |
stage.html
html • 0.04 MB
finance_1472500.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
epaymentnew.pdf
Tender Documents • 0.05 MB
preliminaryagmt.pdf
Tender Documents • 0.25 MB
FormofTender.pdf
Tender Documents • 0.03 MB
affidavitnew.pdf
Tender Documents • 0.03 MB
IntegrityPact.pdf
Tender Documents • 0.05 MB
viewsbd.pdf
Additional Documents • 1.63 MB
BOQ_1472500.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .