Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹95.3 L
EMD Value
₹95,300
Closing Date
27 Nov 2026, 6:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, P H Mech Division, Godhra
work of Drilling of 165 mm dia. x 90 Mts. Deep bore by DTH Rig with Providing and installation of I.M.II Hand pump and construction of C.C. platform as per UNICEF design & drawing with soak pit incl. supply of 175 mm ND CS types UPVC Casing pipe & 32 mm NB ISI marked medium duty GI Pipe at diff.villages of Talukas (Shahera-Morva(H)) of Dist. Panchmahal under Different Programme.
357926
04/2026-27
Open
Drilling Works
Works
Panchmahal
4 documents required · 3 mandatory · 1 optional
₹2,400
Executive Engineer, Public Health Works Division, GWSSB, Godhra
₹95,300
27 Nov 2026
23 Oct 2026
30 Nov 2026
23 Oct 2026
18 Nov 2026
23 Oct 2026
180 days
Estimated Cost : Rs.95,27,343.00
Executive Engineer
P. H. Mechanical Division
Gujarat Water Supply & Sewerage Board
2nd Floor, “Jal Bhavan”, Near Old RTO Office,
Godhra, Dist. Panchmahal –
DTH Tender Panchmahal Godhra Page
GUJARAT WATER SUPPLY AND SEWERAGE BOARD
GANDHINAGAR – 382
PUBLIC HEALTH MECHANICAL DIVISION, GODHRA
Bid Documents for work of Drilling of 165 mm dia. x 90 Mts. Deep bore by DTH Rig
with Providing and installation of I.M.II Hand pump and construction of C.C.
platform as per UNICEF design & drawing with soak pit incl. supply of 175 mm ND
"CS" types UPVC Casing pipe & 32 mm NB ISI marked medium duty GI Pipe at diff.
villages of Talukas (Shahera-Morva(H)) of Dist. Panchmahal under Different
Sr. No. DESCRIPTION Page No.
1 MILE STONE DATES 4 To
2 PRE-QUALIFICATION CRITERIA
3 GENERAL TERMS & CONDITIONS 10 To
4 COMMERCIAL TERMS & CONDITIONS 15 To
5 TECHNICAL SPECIFICATIONS 24 To
7 PRICE BID (SCHDULE - B) 46 To
8 AFFADAVIT & FORM OF BANK GAURANTEE 48 To
9 C.E. (M), GWSSB, GANDHINAGAR LETTER REGARDING
GUIDE LINE FOR PROTECTION OF SMALL CHILDREN
FALLING INTO ABANDONED BORE WELL NO. CE(M)/
NCPR/ BORE/ 1111 DT.31.12.2019
10 CIRCULAR FOR EMD
11 CIRCULAR FOR GST
DTH Tender Panchmahal Godhra Page
For tender and the work details queries, please contact following officers:
Sr. Name of Officer Designation Contact Nos.
Superintending Engineer
1 Shri D. M. Shah Mobile:
Zone-1, Vadodara
Executive Engineer,
2 Shri T. V. Patel P. H. Mechanical Mobile:
Division, Godhra
DTH Tender Panchmahal Godhra Page
MILE STONE DATES
Gujarat Water Supply & Sewerage Board
TENDER NOTICE NUMBER: of 2026-27.
GWSSB invites Online tender for Drilling of 165 mm dia. x 90 Mts. Deep bore by DTH Rig with
providing and installation of I.M.II Hand pump and construction of C.C. platform as per UNICEF
design & drawing with soak pit incl. supply of 175 mm ND "CS" types UPVC Casing pipe & 32 mm
NB ISI marked medium duty GI Pipe at diff. villages of Talukas (Shahera - -Morva(H)) of Dist.
Panchmahal under Different Programme.
(A) Details of Tender Item:
Sr. Name of Work Estimated EMD Tender Period of
No. Value in Rs. In Rs. fee completio
In Rs. n of Work
1. Tender for Drilling of 165 mm dia. 9527343.00 95,300.00 2400.00 12 Months
x 90 Mts. Deep bore by DTH Rig form Date of
with Providing and installation of LOA
I.M.II Hand pump and construction
of C.C. platform as per UNICEF
design & drawing with soak pit incl.
supply of 175 mm ND "CS" types
UPVC Casing pipe & 32 mm NB ISI
marked medium duty GI Pipe at
diff. villages of Talukas (Shahera-
Morva(H)) of Dist. Panchmahal
under Different Programme.
(B) Schedule for e-tendering is fixed as under:
(i) Site Visit (If any) No Visit
ii) Pre-bid Conference No pre-bid.
(iii) Bid documents Downloading Start date /00/2026
(iv) Bid documents Downloading End date Up to date: 00/ 00/2026 up to 15.00 hrs
(v) Physical submission of Tender Fee, Earnest Instruments of tender fee & EMD shall be
Money Deposit and Affidavit. submitted in electronic format only
through online (By scanning) while
uploading the bid. The submission shall
mean that tender fee and EMD are received
for purpose of opening the bid.
Accordingly offer of those shall be opened
whose tender fee, EMD and Affidavit is
received electronically. However for the
purpose of realization of instruments of
DTH Tender Panchmahal Godhra Page
tender fee, EMD and Affidavit bidder shall
send the same in original through RPAD/
Speed Post/ Hand Delivery so as to reach
to the office of the Executive Engineer,
Public Health Mechanical Division, 2nd
floor, Jal Bhavan, Nr. Old RTO office,
Godhra up to Next working day of the
last date of bid submission date:
00/00/2026 upto 15.00 Hrs. For not
submitting the DD, FDR, Affidavit in
original bidder shall be debarred from
participating in any tender of the GWSSB
for period of 3 years as a punitive action.
All the documents in supporting of tender
bid shall be submitted in electronic format
only through online (By scanning). Hard
copy will not be accepted separately.
Tender Fee (Document Fee):
Rs.2400.00 (Rupees Two Thousand
Four Hundred only) in form of demand
draft in favour of Executive Engineer,
Public Health Works Division, Godhra
payable at Godhra. Demand draft shall be
issued by any Nationalized banks or as per
list mentioned in GR of Finance
Department, GR. No.: FD/ MSM / e – File /
01/04/2026 (Enclosed).
Earnest Money Deposit:
Rs.95,300.00 (Rupees Ninety Five
Thousand Three Hundred only) in form
of FDR/BG in favour of Executive
Engineer, Public Health Works
Division, Godhra and shall be valid for
180 days from the last date of
submission of bid shall be issued by
any Nationalized Banks or as per list
mentioned in GR of Finance
Department, GR. No.: FD/ MSM / e – File
01/04/2026 (Enclosed).
EMD shall be released after depositing
performance bond of required amount &
validity by the agency as narrated below.
Performance Bond:
In form of FDR / BG with details of
DTH Tender Panchmahal Godhra Page
amount & validity described below in
favour of Executive Engineer, Public
Health Works Division, Godhra and shall
have validity of Twelve Months from the
date of letter of Agreement(L.O.A) by this
office. The same shall be issued by any
Nationalized banks or as per list
mentioned in GR of Finance Department,
GR. No.: FD/ MSM / e – File / 4 / 2025 /
Intimation regarding depositing
performance bond shall be given by the
Executive Engineer, P. H. Mechanical
Division, Godhra. Performance bond, If
not furnished within 10 days from the date
of letter of Agreement (L.O.A), EMD shall
be forfeited & drilling rig registration shall
also be terminated.
(vi) Online opening of Technical Bid On date: 00/00/2026 at 12.30 hrs. (if
possible) at Office of the Superintending
Engineer, P. H. Mech. Circle, 3rd Floor,
Jal Bhavan, GERI Compound, Race
Course Road, Vadodara.
(vii) Online opening of Price Bid On date: 00/00/2026 after 00.00 hrs.
(if possible) at Office of the
Superintending Engineer, P. H. Mech.
Circle, 3rd Floor, Jal Bhavan, GERI
Compound, Race Course Road,
Eligibility: All bidders must furnish the following details in scanned format uploaded on line with
tender submission.
1. Certified copy of registration as DTH drilling contractor with GWSSB / GWRDC with self
certified copy of RC book of drilling rig.
Latest Valid registration copy as civil Contractor with minimum “D” class & Above appropriate
class, as issued by R&B/ Irrigation/WRD/ GWSSB/CPWD & Other State Govt. department.
2. Affidavit in prescribed format duly notarized on Rs. 300.00 Non Judicial Stamp paper to
be submitted online (Format is enclosed on last page of this volume).
3. PAN CARD of Income Tax.
4. GST Registration Number.
5. Other documents should be scan and upload as per Pre-Qualification criteria of this volume
Note: Pre qualification is mandatory for this bid. Bidder(s) who do not qualify in above
criteria will be disqualified.
Further Details of this tender are as under:
1.0 Particulars: Drilling of 165 mm dia. x 90 Mts. Deep bore by DTH Rig with providing and
DTH Tender Panchmahal Godhra Page
installation of I.M.II Hand pump and construction of C.C. platform as per UNICEF design &
drawing with soak pit and 32 mm NB ISI marked medium duty GI Pipe at diff. villages of
Talukas (Shahera-Morva(H)) of Dist. Panchmahal under Different Programme.
2.0 Down loading Tender Document:
2.1 Bid documents will be available on web site.
Bidders wishes to participate in this tender will have to register on web site
https://gwssb.nprocure.com
3.0 Digital Certificate:
Bidders who wish to participate in online tenders will have to procure / should have legally
valid Digital Certificate (Class III) as per Information Technology Act-2000 using which they
3.1 can sign their electronic bids. Bidders can procure the same from any of the license
certifying Authority of India or can contact (n) code solutions- a division of GNFC Ltd, who
are licensed Certifying Authority by Govt. of India.
All bids should be digitally signed, for details regarding digital signature certificate and
related training involved the below mentioned address should be contacted:
(n)Code solutions A division of GNFC
301, GNFC Info tower, Bodakdev, Ahmedabad 380 054 (India), Telephone:
Fax: +9179 2685732, E-mail: [email protected] Direct No: 079
3.3 Bidders who already have a valid Digital certificate need not procure a new Digital certificate.
5.0 On line Submission of Tech-bid & price bid.
Bidders can prepare & edit their offers number of times before tender submission's final date
5.1 & time. After tender submission date & time, bidder cannot edit their offer submitted in any
case. No written or online request in this regard shall be granted.
Bidder shall submit their offer i.e. Technical bid and Price Bid in Electronic format on above
5.2 mentioned website & before final date of submission shown above after Digitally signing the
5.3 Offers submitted without digitally signed will not be accepted.
5.4 Offers (Price bid) in physical form will not be accepted in any case.
6.0 Submission of tender documents.
Bidder shall have to scan all P. Q. Documents and other relevant tender documents
6.1 properly along with tender fee & EMD instruments (for confirmation of EMD and Tender
fee) & upload online along with the bid.
Bidder has to submit the documents as said in 6.1 above and no other condition in any form
6.2 shall be considered at all at the time of evaluation of the tender i.e. The bidder shall have to
submit unconditional offer without differing from any of the tender conditions.
7.0 Opening of Tender:
Bid documents will be opened on date & time shown above in the office of the
7.1 Superintending Engineer, P. H. Mech. Circle, 3rd Floor, Jal Bhavan, GERI Compound,
Race Course Road, Vadodara.
7.2 Intending bidders or their representative who wish to remain present at GWSSB premises
at the time of tender opening can do so.
DTH Tender Panchmahal Godhra Page
The offline technical evaluation of the tenders received on or before last date of submission
7.3 would be done and results will be displayed on website.
After successful completion of Technical Evaluation, price bid of only those bidders would
7.4 be opened online, whose offers have been found to be substantially responsive.
8.0 Contacting Officer:
Further details / clarifications if any required will be available from
8.1 Shri T.V.Patel, Executive Engineer (Mechanical), Godhra.
8.2 In case bidder needs any clarification / assistance or if training required for participating in
online tender, they can contact at following office.
(n)Code solutions
A division of GNFC301, GNFC Info tower, Bodakdev, Ahmedabad- 380 054 ( India )
[email protected] No: 079
9.0 General instructions:
9.1 The fees for on line tender document will not be refunded under any circumstances.
9.2 EMD in the form specified in tender document only shall be accepted.
9.3 Conditional tenders shall not be accepted.
9.4 Bid shall be valid for 180 days from last date of submission.
9.5 This tender notice shall form a part of tender document.
The bidders are advised to read carefully the "Instruction for Bidder" and "Eligibility
Criteria" contained in the tender documents.
The Internet site address for E-Tender is https://gwssb.nprocure.com and that of
corporate web site is www.nprocure.com
Free training camp for bidders will be organized on every Saturday between 1.00 to
9.8 PM at (n) Code solutions, A division of GNFC, 301, GNFC Info Tower, Bodakdev,
Ahmedabad 380 054 (India). Bidders are requested to take benefit of the same.
DTH Tender Panchmahal Godhra Page
Gujarat Water Supply & Sewerage Board
Public Health Mechanical Division, Godhra
Check List of the documents to be scanned and uploaded online:
1 Scan & upload copy of EMD paid to concerned Executive Engineer, P. H. Works Dn.
2 Scan & upload copy of Tender fee paid to concerned Executive Engineer, P. H. Works Dn.
4 GST registration certificate.
5 Certified copy of registration as DTH drilling contractor with GWSSB / GWRDC with self
certified copy of RC book of drilling rig.
Latest Valid registration copy as civil Contractor with minimum “D” class & Above
appropriate class, as issued by R&B/ Irrigation/WRD/ GWSSB/CPWD & Other State
Govt. department.
6 Affidavit in Prescribed format duly notarized on Rs. 300/- Non Judicial Stamp Paper to
be submitted online as per Format. (This affidavit includes declaration regarding not
blacklisted and no work left incomplete any Govt./ Semi Govt. Department of state/
Central Gov/ Municipality/ Municipal Corporation.)
Check List of the documents to be submitted in original by the bidder in Next
working day of the last date of bid submission up to 15:00 hours through
RPAD/Speed Post / Hand Delivery as mentioned in NIT
1) Tender fee in from of Demand Draft in original.
2) EMD in the form of FDR/ Bank Guarantee in original.
3) Affidavit on Rs. 300 stamp paper in original.
DTH Tender Panchmahal Godhra Page
Gujarat Water Supply & Sewerage Board
Public Health Mechanical Division, Godhra
GENERAL TERMS AND CONDITIONS
1. 100 % work shall be assigned to L1 agency.
2. The contractor(s) shall have to furnish number of registered drilling rigs with GWSSB.
3. All the tools and plants such as DTH drilling machine with compressor required for drilling
of bore etc. shall be provided by the contractor at his own cost at the site of work.
4. If none of the contractors, who have offered their rates, are willing to carry out the work,
the department will have full liberty to get such works carried out through other
contractors. Also in case if insufficient numbers of contractors are willing to carry out the
work, this liberty will be operative to engage other contractors to cover up the outstanding
and spill over work.
5. The contractor(s) shall have to furnish the information regarding numbers of rigs he owns
along with the tender.
6. The approved rates will be applicable for a period of 12 months from the date of LOA given
by the competent authority of GWSSB.
7. The right is reserved with the competent authority to accept or to reject all the tenders
assigning no reason thereof.
8. Payment for drilling bore will be made on measured quantity only. The
EE/DEE/Hydrologist or his representative shall verify the Strata (i.e. Jr. Geologist-in-
charge) and decision will be binding to the Contractor. The contractor should furnish strata
samples after completion of bore to sub division office.
9. In case of dispute for unforeseen or over looked item the decision the GWSSB's competent
authority / authorities will be final and binding to the Contractor.
10. The Contractor will have to provide Free of Cost filled up Data Sheet in A.4 Size paper as
attached (in Gujarati).
(a) Bore Drilling Report (બોર શારકામ ર પોટ) Annexure: III
(b) Hand pump Installation Report. Annexure: IV
11. If any naked (without casing) bore is fail due to hydrological / mechanical failure should be
abandoned & filled up by agency after taking Rojkam from village / Falia / hamlet. If any
accident occurred due to naked unfilled bore than all this responsibility is of agency. And
for that all liabilities of agency. There is no responsibility of department.
12. The bore plug should be fitted by Contractor on each harnessed bore till HP is installed and
bore plugs should be returned back to department by Contractor when HP is installed on
successful bore. Fail bores should have bore plug fitted.
13. If the agency does not carry out the work after allocation of pin point the department has
right carry out the work by Other Agency.
DTH Tender Panchmahal Godhra Page
એ લીકશનથી પો ટકાડ સાઇઝના ફોટો ાફ latitude & Longitude સાથે Annexure – III અને
Annexure – IV સાથે ફર યાત આપવાના રહશે.
યાં) / NPCR / બોર/ ૧૧૧૧ તા.૩૧-૧૨-૧૯ નો ુ તપણે અમલ એજ સી ારા કરવાનો રહશે.
17. 25 % of drilling charge amount is kept in deposit for work of installation of Hand Pump.
This deposit will released along with submission of hand pump installation Final bill.
18. If Hand pump installation material i.e. India Mark- II Telescopic / Normal stand Hand pump
or 32 mm dia. G.I. pipe is not issued within one month than 25 % Drilling Deposit which is
kept in deposit as per condition above (17) can be released as material not available by
concern Engineer in-charge.
19. Agency shall drill bore more than 90 Mt. and up to 200 Mt. if required as per instruction of
Engineer in charge / Geologist report at the same approved rate. No extra payment will be
20. ભાવ તફાવત (Price Variation):
Price Variation clause:
Formula = Z x W x (D1-D2)/D2
Z= Bill Amount of the particular Bore
W= weightage of the Diesel 52 %
D1= Rate of Diesel at the time of pin point Given Diesel rate will be taken from IOCL petrol
pump through SMS and will be published every week on Monday by Head office, GWSSB.
D2= Star Diesel Rate shall be taken at the time of uploading of tender.
DTH Tender Panchmahal Godhra Page
ઉપરોકત ભાવો તા.૦૭/૦૯/૨૦૨૬ ના વતમાન છે . સદર ભાવો GWSSBની Website :
https://watersupply.gujarat.gov.in ઉપરથી ણી શકાશે. ડ ઝલના ભાવ તફાવત ુ ં ુ વ ુ ં બોડની
24. Rate quoted by agency should be Exclusive of GST and hence Applicable GST (present
%) will be paid by GWSSB separately Bidder has to quote the rate exclusive of GST and
tender will be evaluated accordingly.
27. Cost of colour work of Handpump C.C. Platform is included with construction C.C. platform
for Handpump Assembly.
28. Payment of material will be made as per actual supplied. If lesser material is required for
execution of this work till completion of time limit, then department is not bound to receive
extra material from contractor and make payment for the same. Decision of Engineer-in-
Charge will be final regarding this matter and bound to contractor. Contractor must get
confirmation regarding quantity of supply materials from Engineer-in-charge before giving
purchase order to vendor / manufacturer.
29. Material Supplied by Department:
If material is available at other sub divisional store, then contractor has to ship that material
DTH Tender Panchmahal Godhra Page
at his/her own cost. No extra payment will be made to the contractor for transportation and
loading/unloading of any material issued by Department from any store.
30. Deduction System for construction of C.C. Platform of smaller size due to unavailability of
space or any other reason.
Sr. No. Name of Component Weightage
1 Square Standing Platform 10 %
2 Circular Apron with Splash Guard 60 %
3 Foundation 15 %
4 Soak pit with Channel & Splash Guard 15 %
31. Deduction for construction platform and soak pit will be made as per rate available in
prevailing S.O.R. of any department. Table above shows the percentage of weightage that
will be given to different components of C.C. Platform to the total rate of complete
construction of the C.C. platform. Based on difference between specified volumetric
dimensions and actual volumetric dimensions deductions will be made for those
components based to weightage.
32. No extra payment will be made for construction of C.C. platform of larger dimensions for any
33. In case of any discrepancy regarding dimensions mentioned in drawing attached herewith
decision of Engineer-in-Charge will be final and bound to contractor for actual dimensional
requirement for this work.
34. Department reserves all rights to inspect handpump after completion of work at any site.
Contractor has lowered pipe in bore as per instruction of Engineer – In charge. If it is found
that contractor has lowered lesser pipe than instruction of Engineer – In charge for any
handpump, then Penalty of Rs. 1000 per pipe for that handpump will be imposed. The
contractor has to lower rest nos. of pipes at his own cost in that handpump. If more than 5%
hand pumps out of total nos. of hand pump installed during tenure, then contractor will be
debarred and blacklisted for 03(Three) years.
35. Contractor should only install hand pump on any successful borewell after the measurement
work of casing pipe and borewell depth is finished. If contractor has installed the hand pump
on any successful borewell, then contractor has to remove hand pump assembly at his own
cost for measurement work.
36. If any Handpump becomes di-functional before final bill, then the Contractor has to repair
those handpumps at his own cost. No extra payment will be made for repairing of those
DTH Tender Panchmahal Godhra Page
handpumps. Otherwise, that handpump will be repaired at risk & cost of contractor.
Department will not be liable for any financial losses to the contractor in that case.
37. No Extra payment will be made to contractor for difference in market price and rate
provided in this price bid. So, contractor is advised to quote rates accordingly. If abnormal
rates are found quoted by contractor, then he/she has to give justification in written for
38. Contractor has to submit 04(Four) photocopies with latitude and longitude of hand pump at
different phases of work.
(1) Drilled borewell after installation of Casing Pipe (and bore plug in case of failure of
(2) After Installation of Handpump and Construction of C.C. Platform
(3) 02 Nos. after Completion of Colour Work of C.C. Platform. (01 Nos. from each Side Angle)
The Contractor must submit colour photocopy of borewell drilled and installed hand pump
with name of Taluka, Village, Faliya and Beneficiary along with latitude and longitude within
± 15 meter accuracy. Photos with lesser accuracy than ± 15 meter will not be accepted. No
payment will be made if photographs with required information are not submitted. In
addition twice the amount of Photograph in price bid will be deducted from the bill.
39. Quantity of Borewells to be drilled and Handpumps to be installed in different talukas
mentioned herewith are as per requirement at the time of tender preparation. Engineer-in-
Charge reserves all rights to change that quantity taluka-wise. Total quantity of work to be
performed shall remain unchanged.
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
Gujarat Water Supply & Sewerage Board
Public Health Mechanical Division, Godhra
COMMERCIAL TERMS AND CONDITIONS
1. The offers are invited from the drilling contractors registered with GUJARAT WATER
SUPPLY & SEWERAGE BOARD / GWRDC for these types of works and having required
capacity of machinery to drill bore. The contractor should produce a copy of registration
of drilling rig along with R.C. book for verification in this regard.
2. Rates are invited through web site (E- tendering process). Interested bidders can down
load tender documents from web site within stipulated time limit. Duly supporting
documentary evidences shall have to be uploaded with the tender. As narrated in NIT,
EMD and tender fees shall be submitted in proper form to Executive Engineer, Public
Health Mechanical Division, 2nd Floor, Jal Bhavan, Nr. Old RTO office, Godhra by
R.P.A.D. or speed post or Hand Delivery only but within stipulated time limit. Bidders
shall have to accept technical, commercial and general terms, conditions and
specifications of tender document by signing digitally. The price bid will be opened only
after bidder(s) qualify as per qualification criteria.
3. The tender fees in form of demand draft in favour of Executive Engineer, Public
Health Works Division, Godhra payable at Godhra Demand draft shall be issued by
any Nationalized Banks or as per list mentioned in GR of Finance Department, GR. No.:
FD/ MSM / e – File / 4 / 2025 / 2712 / DMO Date: 01/04/2026 (Enclosed).
4. The EMD as mentioned in NIT should be paid in the form of FDR / BG in favour of
Executive Engineer, Public Health Works Division, Godhra and shall be valid for six
months from the last date of submission of bid. It shall be issued by any nationalized
banks or as per list mentioned in GR of Finance Department, GR. No.: FD/ MSM / e –
File / 4 / 2025 / 2712 / DMO Date: 01/04/2026 (Enclosed). EMD shall be released
only after finalizing the tender by the competent authority and after depositing the
performance bond by agency.
5. No exemption from E.M.D. shall be given to any contractor on any account. Offer(s)
without EMD shall be rejected outright.
6. Conditional offers will not be accepted. The department will not give any advance
payment against the tender award.
7. The rates quoted should include loading, unloading & carting of all materials from the
designated departmental store(s) to site of work at his cost. Materials not covered in the
tender however necessary to ensure completion of work will have to be supplied by the
contractor if asked by the department for which rates shall be paid as per provision of
clause - 14 of B-1form.
8. The department will not issue exemption certificate for any Government levies.
DTH Tender Panchmahal Godhra Page
9. Tender Validity Period: The tender offer shall be valid for period of 180 days from the
last date of receipt of the tenders. Any tender for lesser validity for the date on which
than the tender shall be out right rejected.
10. Security Deposit: Security deposit at 5 % of the estimated amount as per schedule B
shall have to be paid by the bidder at the time of entering into agreement with the
concerned Executive Engineer. This would be in the form of FDR of nationalized /
scheduled bank except co-operative. Remaining 5 % will be deducted from the running
accounts bill (s) due to the contractor.
Security deposit will be released as per B-1 tender form & relevant clause only after
receipt of no due certificate from the concerned Deputy Executive Engineer (EIC).
Amount of security deposit shall be greater of these i.e. estimated amount & approved
bid amount of allotted work.
11. Tender Agreement: The contractor(s) shall be required to enter in to agreement B
with the Executive Engineer for allotted work(s).
12. Quantum of Work: As mentioned in Price bid (Schedule B). However work shall be
executed depending on actual requirement. The estimated quantities may vary
depending on actual need. Contractor will not be entitled to receive any compensation in
case of any decrease in estimated quantities. Likewise the contractor may have to
execute excess quantities of any item (s) included in BOQ depending on actual
13. Excess Extra Items: The contractor is bound to carry out 50 % excess quantities of
work of all the items included in this tender as per actual need & as directed by the EIC
and as suggested by the Hydrologist. The sanction of such excess work will be accorded
as per prevailing delegation of power (DOP) of the GWSSB at the competent level.
However the payment to be made for all such excess quantum of work up to 10 % of the
estimated quantity shall be as per approved rates. Excess work carried out more than
10% of the estimated quantity the payment shall be made as per approved rates or
prevailing SOR whichever is lower.
Similarly for any extra item(s) not included in this tender are also required to be carried
out as per actual need & as directed by the EIC and as suggested by the Hydrologist.
However the payment to be considered for all such extra item(s) of work shall be as per
prevailing SOR (Civil / Mechanical) of GWSSB. However the decision of competent
authority as per DOP shall be final & binding to the contractor.
14. A) Time limit & Compensation for Delay: (For Drilling work):
The entire tender work shall be completed within 12 Months from the date of LOA. The
contractor shall have to complete the allotted works in all respects within the stipulated
time limit which will be 30 Days from issue of pin point. The contractor is bound to carry
out estimated quantity of work on as and when required basis during the currency of the
contract which shall be 12 Months from the date of LOA. The drilling contractor can be
asked to simultaneously deploy more than one drilling rig of required capacity if asked
to do so by the Executive Engineer (Mechanical), Godhra in writing depending on
urgency of work(s). However the supervision of all works will be sole responsibility of
the agency which has entered in to the agreement. The agency should be received the
DTH Tender Panchmahal Godhra Page
Pin Point in written from Engineer in-charge. The rig should be deployed within 7 days
after receiving pin point otherwise penalty @ Rs.500/- per bore per day will be levied.
The compensation for delay in work as liquidated damages will be recovered as per
condition of printed B-1 tender form & relevant clause.
B) The contractor(s) shall have to complete all work in all respects within the stipulated
time limit which is narrated in clause 14 above. The drilling contractor shall have to
deploy drilling rig(s) of required capacity. Work shall be allotted on as & when required
basis. The compensation for delay in work as liquidated damages will be recovered as
per condition of printed B-1 tender form & relevant clause. In the event of decrease in
contractor shall not be entitled to receive any extra compensation on this account.
C) LIQUIDATED DAMAGES FOR SUPPLY OF MATERIAL:
Material shall be supply and offered for inspection within 30 days from the date of
supply order given by Executive Engineer.
In the event of the failure of bidder or contractor to offer the material for inspection
under the supply order in the stipulated time limit and also in case of the said material
not reaching at the destination in the time limit as stipulated, GWSSB will charge
liquidated damages at the rate not exceeding 0.1% of the cost of delayed material per
Day for the period of aforesaid delay in offering the material for the inspection and also
for the delay in causing the delivery of dully Inspected materials at the destination in
accordance with the stipulations under this contract. The maximum amount of
liquidated damages so recoverable shall not exceed 10% of the cost of undelivered
material under supply order. In such an event, the failure on the part of bidder or
contractor will be treated as breach of the contract and the security deposit shall be
forfeited, unless written permission for extension of time limit is granted.
15. Prices & Payment:
The bidder must understand clearly that the prices quoted are for the total works or the
part of the total works quoted includes all costs due to materials, labour, equipment,
tools & tackles, transportation, loading, unloading, stacking, supervision, other services,
royalties, octroi, labour cess, State & Central Government taxes / levies etc. No claim for
additional payment beyond the prices quoted will be entertained and the bidder will not
be entitled subsequently to make any claim on any ground.
A) For Drilling & H.P. Installation Job work:
The payment will be made after satisfactorily completion of the drilling & H.P.
Installation work as per requirement and tender specifications. However, payment shall
be made as per the availability of fund and providing following Annexure with the bill.
Annexure –III & IV duly signed by the concerned Sarpanch / Talati / Teacher / Health
DTH Tender Panchmahal Godhra Page
B) For Supply of 175 mm UPVC Pipe, I.M.- II H.P. Set, 32 mm dia. GI Pipe:
1 On supply of material at work site/ Dept. 65% Prices of Accepted
store / warehouse of agency in good Price
condition. (All supplied qty.)
a) On lowering of casing pipe in bore.
2 30 % Prices of Offered
(consumed qty.) Price
b) On installation H.P. set on successful
bore (consumed qty.)
c) On lowering of 32 mm dia. GI Pipe
during H.P. Installation work.
(consumed qty.)
3 On Completion of One Year Defect Liability 5 % Prices of Offered Price
Period from Date of installation.
** Note: Payment of balance supply materials which is remaining after drilling & H.P.
Installation work will be done in final bill @ 30 % Prices of offered Price
16. Guarantee or Warranties: The contractor shall warrant and guarantee the entire work
and parts thereof against faulty or defective workmanship provided by him / them as
provided in Cl.17 of printed in B-1 tender form.
17. Jurisdiction: Jurisdiction of the contract shall as per the head quarters of the concerned
P. H. Mechanical Division office i.e. Godhra where tender agreement for the work is
18. Dispute: In the event or any problem, dispute or differences arising out during carrying
out the contracted works, the decision of the Superintending Engineer, P.H.
Mechanical Circle, Vadodara will be final and binding on the parties to this contract.
19. In case, if any contractor (other than the lowest bidder i.e. L1 in a particular group) gives
written submission expressing his unwillingness / refusal to carry out work at approved
rates, then his EMD will be released but his right regarding this tender will be forfeited
and no work will be allotted to the same contractor during the currency / applicability of
20. Income tax , GST & all other applicable taxes, any other levies, cess, etc. will be deducted
from the bill as per applicable rates at the time of making payment.
21. The amount recoverable from the contractor by G.W.S & S. B. on any account, can be
recovered from the bills payable to the contractor(s) under this clause.
22. Payment will be made as per the approved rates of this tender for which agreement is
done. In any case, if depth of bore is required to be increased / decreased due to
technical reasons than payment will be made as per the rates of the group for which the
agreement is made. If the actual depth drilled is less than estimated depth, no
compensation shall be given to the contractor on account of decrease in estimated depth.
23. Pre-qualification is mandatory for this bid.
DTH Tender Panchmahal Godhra Page
24. Limitation of depth of bore is as mentioned in BOQ. However the contractor is bound to
drill bore up to required depth.
25. Rates are exclusive of GST but inclusive of all other taxes.
26. The Rates to be quoted by the contractor must be exclusive of GST but inclusive of all
other taxes. GST should be paid extra on the admissible payment as per the approved
tender rates and condition of price variation; GST should be paid as per prevailing rates
at the time of payment.
27. Contractors should abide circulars issued by GWSSB with respect to GST and other taxes.
28. Agency should quote the firm and fixed rates which will prevail throughout the currency
of the tender which shall be minimum 12 Month from the date of L.O.A.
29. Income tax and all statutory deductions will be made as per prevailing Government
30. Agency must scan GST registration number document and upload the same with the
31. Modification of Documents:
Modification of specifications and extension of the closing date of tender, if required, will
be made by the corrigendum. Copies of each corrigendum shall be uploaded & sent to all
bidders. These shall be signed and shall form a part of tender. The bidder shall not add
to or amend the text of any of the documents except in so far as may be necessary to
comply with any corrigendum.
Addenda/ Corrigenda
Addenda / Corrigenda from a part of the contract document and full consideration shall
be given to all addenda in the preparation of tenders. Bidders shall verify the number of
Addenda / Corrigenda issued, if any and acknowledge the receipt of all addenda in the
tender. Failure to so acknowledge may cause the tender to be rejected.
A Tender inviting authority may issue Addenda to advice bidders of changed
requirements. Such addenda may modify previously issued addenda.
B No addendum may be issued after the time stated in the notice inviting
32. Evaluation of Tenders:
The bidder will have to qualify in the post qualifying criteria laid down for financial,
technical and experience criteria. In comparing tenders, the GWSSB shall consider such
factors as the time of completion, efficiency and reliability or construction method
proposed, compliance with the specification, relative quality. Evaluation criteria
specifically mentioned in the specifications will also be taken in to consideration in the
evaluation of tenders. The bidder will have to quote for item mentioned in price bid
33. Policy for Tender under Consideration:
Tender shall be deemed to be under consideration from the opening of the tender until
such time any official announcement of award is made. While tenders are under
consideration, bidders and their representative(s) or other interested parties are
advised to refrain from contacting / influencing personnel or representatives of GWSSB
on matters related to the tender under scrutiny. GWSSB if necessary, will obtain
DTH Tender Panchmahal Godhra Page
clarifications / additional information on tenders from any or all bidders in writing. The
bidder will not be permitted to change the substance of his tender after bids have been
uploaded. Noncompliance with this provision shall make the tender liable for rejection.
Award of the contract or the rejection of tenders will normally be made during the
tender validity period stated in the notice inviting tenders.
A After all contract contingencies are satisfied and the letter of acceptance of the bid
(notification of award) is issued, the successful bidder shall execute the contract
agreement within maximum 10 (ten) working days and shall furnish the security deposit
(performance bond) as required herein. The contract agreement shall be executed in
form stipulated by GWSSB.
B If the bidder receiving the LOA / LOI of award fails or refuses to execute the contract
agreement, within the stated time limit or fails / refuses to furnish the bond as required
herein. The department will forfeit the security deposit / EMD and will be debarred from
participating in GWSSB tenders and blacklisted for three years.
35. Signing of Contract:
The successful bidder shall be required to execute the contract agreement in
required forms within 10 days from the date of issue of LOA / LOI with the designated
officer of GWSSB as narrated in NIT. Failure to do so will automatically entitle the
GWSSB to forfeit the security deposit / EMD and will be debarred from participating in
GWSSB tenders and blacklisted for three years.
The person to sign the contract document shall be a person as detail provided in
documents submitted by the agency. (signing of tender document).
36. Disqualification:
Tender shall be disqualified and will not be taken for consideration if
A The tender security deposit is not deposited in full and in the manner specified
as per the NIT i.e. Earnest Money Deposit.
B Bidder does not agree to payment terms defined in clause 18 i.e. payment terms.
C A tender may further be disqualified if
i) Price variation is proposed by the tender on any principal other than those
provided in the tender documents.
ii) Completion schedule offered is not consistent with the completion schedule defined
and specified in tender documents.
iii) Any conditions are specified in the tender.
37. STAMP DUTY CHARGES:
Stamp duty on all documents to be executed in connection with the contract to the
tendered into shall borne by the seller.
38. Brand Name:
Hand pump spares must comply with IS 15500 with latest amendments, 32mm Dia.
medium duty GI pipe must be ISI marked as per IS 1239 with latest amendment & IS:
12818 / 2010 with Latest Amendment.
39. Non-Transferable:
Tender documents are not transferable.
DTH Tender Panchmahal Godhra Page
40. Cost of Tendering:
GWSSB will not defray expense incurred by bidder in tendering.
41. Right Reserved:
The GWSSB reserves the right to reject any or all tenders, to waive any informality or
irregularity in any tender without assigning any person. The GWSSB further reserves the
right to withhold issuance the notice to proceed, after execution of the contract
agreement for the period of stated in the notice inviting tenders and no additional
payment will be made to the successful bidder on account of such withholding. GWSSB is
not obliged to give reasons for any such action.
42. GWSSB reserves right to reduce / increase the scope of work without assigning any
reasons even after the award of contract.
43. No advance for mobilization or advance on material will be given.
44. The scope of work is clearly mentioned in the tender documents. The contractor
shall have carryout the work in accordance with the detailed specifications. No
deviations, unless explicitly authorized by the competent authority of GWSSB,
shall be accepted.
45. Joint venture are not allowed.
46. If any information / details provided by the bidder(s) is found false during scrutiny or at
later stage, his / their EMD shall be forfeited and shall be disqualified for the proposed
work. If any information provided by the bidder is found false after award of work, the
performance security of the bidder shall be forfeited and the contract shall be
47. Under no circumstances the contractor shall be allowed to sub contract / sublet the
work to other contractor / agency
48. Price Escalation
There is no clause / provision of price escalation on any account during the currency of
49. SETTLEMENT OF DISPUTES AND ARBITRATION:
A) SETTLEMENTS OF DISPUTES:
i) If any dispute of any kind whatsoever may arise between the Employer and the
Contractor in connection with or arising out of the Contract, including without prejudice
to the generality of the foregoing any question regarding its existence validity or
termination, or the execution of the works whether during the progress of the work or
before or after the termination, abandonment or breach of the contract, the either
parties shall have to raise/ refer their disputes/ differences / claims in writing to the
other party, within a period of 30 days on occurrence of such events, to resolve any such
dispute or difference.
ii) The contractor shall have to refer their disputes to the concerned Superintending
Engineer. After receipt of the dispute from the contractor under this clause, the
Superintending Engineer In-charge of works shall have to submit their report to the
Chief Engineer within a period of 90 (Ninety) days. The Chief Engineer shall offer an
opportunity to the contractor to be heard and to furnish evidence in support of their
disputes within 30 (Thirty) days after the receipt of the disputes duly compiled by
Superintending Engineer. After hearing the contractor regarding their disputes along
with their documentary support and the concern Superintending Engineer & Executive
DTH Tender Panchmahal Godhra Page
Engineer in charge of the work, the Chief Engineer shall give decision within a period of
120 (One Hundred Twenty) days or the contractor is dissatisfied with the decision
within 120 (One Hundred Twenty) days after the contractor has been heard. If The Chief
Engineer does not give decision within 120 (One Hundred Twenty) days or the
contractor is dissatisfied with the decision of the Chief Engineer, the contractor shall
within 30 (thirty) days after receiving the instruction or decision, appeal to the Member
Secretary, GWSSB. After hearing both the parties the Member Secretary, GWSSB will give
reasonable decision within 120 (One Hundred twenty) days from the date of receipt of
appeal by the contractor. The decision of the Member Secretary, GWSSB shall be final
and binding on both the parties. If the Member Secretary, GWSSB does not give decision
within 120 (One Hundred Twenty) days after the date of appeal by the contractor, the
contractor will have right to refer the dispute to
B) ARBITRATION:
i) Subject to Clause (A) mentioned above and in the event of any dispute or difference
arising out of or in any way relating to all concerning these contracts or the construction
or effect of these contracts shall on the Tribunal Constituted Under The Provision Of
Gujarat Public Work Contract Dispute Arbitration Tribunal
ii) The arbitration shall be conducted in accordance with the provisions of at such place
and time as the Tribunal may determine.
iii) The decision of the tribunal shall be final and binding upon both the parties. The
expenses of the arbitration shall be paid as may be determined by the Tribunal.
iv) Performance of the contractor under the contract shall if reasonably be possible,
continue during the arbitration proceedings and payments due to the contractors by the
owner shall not be withheld, unless they are the subject matter of the arbitration
v) The dispute is deemed to have arisen on the date, on which Member Secretary, GWSSB
shall not give his decision as mentioned above in Clause (A) or in the case of intimation
of any decision, the contractor intimates in writing that he has finally refused to accept
the offer made by the GWSSB.
vi) Where any dispute arises between the parties to the work contract either party shall
irrespective of whether such works contract provides for any arbitration or not, refer,
within one year from the date that Member Secretary, GWSSB has not given the decision
as per Clause (A) such dispute in writing to the Tribunal for arbitration in such form and
accompanied by such documents or other evidence any by such fees, as may be
vii) Legal jurisdiction: All question relating to this Tender shall be governed by the law of
India and shall be subject to jurisdiction of court at Gandhinagar, Gujarat.
50. Special Condition 1: If the Agency will not come for Agreement after issue of
LOI/LOA then EMD shall be forfeited and Agency will be debarred for 03 years
from competing in GWSSB contracts.
51. Special Condition 2: If the Agency will not start work after issue of pinpoints
within 07 days then Security deposit shall be forfeited and Agency will be
debarred for 03 years from competing in GWSSB contracts.
DTH Tender Panchmahal Godhra Page
52. The bidder shall be disqualified if,
If IP address of one or more participated bidders are found duplicate / sam
doubtful. GWSSB will consider that contractors have made RING while bidding and
department will reject all such doubtful and action for blacklisting or/and
debarring of business will be taken against those contractors.
53. If contractor shall neglect or fails proceed with the work due to diligence or if he
violates any of provision of the contract then Clause -3 “Default by contractor” of
B-1 tender form is applicable and it is binding to contractor(s).
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
TECHNICAL SPECIFICATION
DTH Tender Panchmahal Godhra Page
Gujarat Water Supply & Sewerage Board
Public Health Mechanical Division, Godhra.
Name of work: Drilling of 165 mm dia. x 90 Mts. Deep bore by DTH Rig with providing and
installation of I.M.II Hand pump and construction of C.C. platform as per
UNICEF design & drawing with soak pit incl. supply of 175 mm ND "CS" types
UPVC Casing pipe & 32 mm NB ISI marked medium duty GI Pipe at diff. villages
of Taluka: Shahera-Morva(H)) of Dist. Panchmahal under Different
Drilling of 215 mm dia. bore hole for 175/ 180 mm dia. ERW/UPVC/PVC pipe up to
required depth in over burden strata (maximum up to 30 meters or up to the depth as suggested
by Geologist / Hydrologist) and further drilling of 165 mm dia. bore hole in remaining rocky or
sandstone strata up to 90 mtr. depth or suggested by Geologist / Hydrologist. The drilling shall
be done by the down the hole hammer type drilling rig & lowering 175/180mm dia. ERW/UPVC
Pipes. The carting of pipes and other materials of etc. should be carried out by contractor from
stores to site of work at his own cost.
Drilling work shall be carried out at the sites shown by the Department. The diameter of
the hole should be 215 mm in over burden strata and 165mm dia. in Rocky & Sandstone strata
up to overall specified depth of 90 mtr. or as per suggested by Geologist / Hydrologist. The
Drilling shall be carried out in over burden strata up to maximum 30 Meters or up to the depth
as suggested by Geologist / Hydrologist. If further drilling cannot be done due to overburden up
to 30 meters, or in rocky & Hard or Sandstone strata due to Mechanical failure up to specified
depth the drilling shall have to be stopped in consultation with Engineer-in-charge and payment
shall be made for such drilling carried out by the Contractor as actual.
The 175/180mm dia. ERW / UPVC/PVC pipes should be lowered by the contractor in
over burden strata. Contractor as desired by the Engineer-in-charge will carry out the jointing
of pipes. Necessary jointing materials, steel bended plates etc. should be provided by the
Contractor at his own cost.
DRILLING OPERATION:
The Drilling operation for drilling of Bores should be carried out by suitable rig to satisfy
(A) For Drilling Through overburden:
1. The diameter of the bore in the over burden shall be sufficient for insertion of 175/180
mm dia. ERW / UPVC / PVC casing pipes with the joints and leaving sufficient annular
space for grouting the casing pipe with sticky clay or local soil etc. Annular space
between bore hole and casing pipe should be filled up with sticky clay or local materials
DTH Tender Panchmahal Godhra Page
2. After completion of overburden strata, the bore should drilled up to 1.00 mtrs. in rocky /
Hard / Sandstone strata. So that casing pipes can be properly embedded in the Rocky /
Hard / Sandstone formation.
3. After the casing pipe is embedded in the rock, the same is to be grouted with materials
like sticky clay or local materials etc. so, as to avoid leaking of drain water in the bore.
4. Drilling of 215mm dia bore in over burden strata is compulsory up to 30 mtrs. or as
suggested by Geologist / Hydrologist.
(B) For Drilling Through Rock:
Bore though rocks shall be of 165mm dia. and the total depth from the ground level of
the bore shall up to 90 mtrs. or as per the recommendation of the Hydrologist / Jr.
Geologist ( Depth up to 200 mtr ). No extra rate will be paid separately.
LOWERING OF CASING PIPES:
1. Casing pipes shall be properly socketed, welded & screwed, so as to ensure a continuous
length lowered through the over burden, so as to reach at least 0.15 mtr. Inside the hard
rock. The length of casing pipes should be kept such that at least 0.30 mtrs. Remains
projected above the Ground Level. After completion of the work at site, the top of the
casing pipes shall have to be closed either by a screwed or by welded cap plug (if
required for HP Installation) unless pump is fitted immediately after completion of the
2. The casing pipe shall be lowered in such a manner so that it remains vertical so as to
ensure installation of pump.
3. The depth of bore to be drilled as per the recommendation of Jr. Geologist / Hydrologist
shall be less or more depth. If the bore required to be drilled beyond the specific depth
90 mtrs. the contractor shall be bound to carry out such work at the rate mentioned in
"Schedule : B".
4. All the tools and tackles or plants and other suitable machinery required for work for
drilling, developing, gauging etc. for the Tube well & installation of Hand pump shall be
provided by the Contractor at his own cost at the site of work.
5. In case of any item not covered by the specifications stated herein the Contractor shall
carry out such work strictly, according to written instructions of Engineer-in-charge,
which will be binding to the Contractor and shall have to carry out such work at
Departmental Schedule. The rate shall be mutually agreed up on, however, the decision
of the Engineer In charge will be final.
6. During the Drilling Operation, if the water bearing strata found at a depth lesser than
estimated depth, the Executive Engineer or his representative shall have authority to
instruct the Contractor to stop the work. For reduction in the quantity of the work, the
Contractor shall not be eligible for any compensation.
7. If the bore is required to be drilled above the specified depth, the Contractor shall be
bound to carry out such additional work, including drilling providing and lowering of
casing pipes as may be necessary. The relevant specifications regarding drilling
providing and lowering pipe, taking yield test and strata sample etc. shall also apply in
DTH Tender Panchmahal Godhra Page
case of such additional work. The rates for additional work will be paid as per the rate
8. Lowering and fixing of housing and casing shall be carried out in workman like manner.
The contractor shall be responsible for workman compensation in case of any accident.
In case of dispute or overlooked items the decision of the concerned Executive Engineer
shall be final and binding to the Contractor.
9. The contractor shall clear the site before starting of the work and after completion of the
work and shall hand over the bore with final finishing of the work to Gram Panchayat.
As directed by the Engineer-in-charge which shall have to be done by the Contractor at
10. The approach roads to site of work may be Kachha roads and contractor shall have to
make his own arrangements for repairing of the road and maintain the same for
transporting his materials and equipment at his cost, which shall be utilized by the
department for inspection etc. purpose.
11. The list of the locations, where bore well are to be drilled will be provided at time of
Tender agreement and Similarly, the actual site of work will be given to the Contractor
by the Geologist or Engineer-in-charge from the respective Mechanical Division / Sub.
Division after agreement within three days.
If a well is rejected on account of faulty workmanship or negligence on the part of the
Contractor as well as if, the verticality is not within the permissible limit the bore shall
be rejected and the Contractor shall have to drill a new bore including lowering pipes
etc. at his own cost.
12. If, further drilling cannot be carried out due to encountering the sticky clay or over
burden beyond limits (i.e. beyond 30 meters.) or in rocky/sandstone formation up to
specified / suggested depth in a such a case the decision of the Executive Engineer on
recommendation of Hydrologist will be binding to the Contractor as finalized by
Executive Engineer and Hydrologist. In such event, the payment of bore shall be
released on the recommendation of Geologist / Hydrologist.
13. The Contractor will have to make arrangement at his own cost for cleaning of bore hole,
if filled up by clay, sand, dust & boulders etc.
14. On completion of drilling work up to the required depth, the bore is to be developed and
cleaned by suitable capacity air compressor up to the sand free discharge.
15. The Contractor will have to make arrangement at his own cost for.....
A. Rig Vehicles, Machineries etc.
B. Facilities for moving bulky materials.
C. Realizing the Transporting Materials.
D. Keeping in custody Department Materials until finally taken over by the
Office-in-charge of the work.
E. Repairing to the damages caused in the process of the executing the works.
F. Approach road to the site.
16. Issued of Materials and Transport:
The casing pipes for insertion in over burden & other Materials shall be issued to the
Contractor from Departmental store. Contractor without any extra charge will make
DTH Tender Panchmahal Godhra Page
Transportation and Loading and Unloading of pipes Hand pump etc. and any other
Materials from sub division store to the site of work. The safe handling and custody of
such materials shall be the responsibility of the Contractor & same access materials
should be handed over back to department before final bills.
17. SIZE OF BORE PLUG :
Bore Plug is Suitable for 175mm UPVC Pipe. It is having 100 mm Height made from
mm thick M.S. plate (For top also) with 3 holes at equal distance on circumference for
nut – bolts type, locking arrangement with nuts – bolts & lock nuts of std. make
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
DETAIL SPECIFICATION FOR MANUFACTURE, SUPPLY & DELIVERY OF ISI MARKED
DEEPWELL HAND PUMP WITH TELESCOPIC ST AND ASSEMBLY COMPLETE SETS.
ISI Marked Deep well Hand Pump with Telescopic Stand Complete Sets Conforming to Relevant IS
with latest amendment as under.
Sr. No. Description Relevant IS
1. Manufacture, Supply & Delivery of ISI Marked Deep well Hand pumps
set (IS: 15500 (Part-II) /2004 with latest revision) without riser pipes
along with 12 Nos. of Connecting rods with necessary couplers duly IS:15500 (Part-II)
Electro-Galvanized according to IS: 1573 with latest amendments and /2004 with
with following stand assembly. As per Detailed Technical Specification Latest
of IS Code. amendment.
Telescopic Stand Assembly
i) Manufacturer's Brand name and/or trade mark.
ii) Purchaser's mark as "GWSSB" and “ISI Mark” with years of manufacture be embossed /
engraved / Inscribed / Stenciling.
iii) Any other important matter that the manufacturer deems fit to be inscribed. Readable
Stenciling Mark of "GWSSB" with Oil Paints shall have to be carried out on Pedestal of Hand
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
TECHNICAL SPECIFICATIONS FOR 32MM GI PIPE
Manufacture, supply and delivery of ISI marked 32 mm dia medium quality galvanized Mild
Steel Tube (Continuously Welded) Electric Resistance Welded (ERW) High frequency Induction
Welded (HIFW) Hot Finished Welded (HFW) type screwed at both ends to IS: 554/85 for pipe
threading suitable for water and Gas application socketed on one end and other end protected
with plastic thread protector in approximate length of 3 meters conforming to IS: 1239(Part-I)
2004 with latest amendments. Sockets should be as per IS: 1239(Part-II)/1992 with Latest
amendments or relevant IS shall be applicable.
The details specifications are as under;
1) Nominal bore of pipe : 32 mm
2) Outside diameter of pipe : Minimum 42.0 mm and Maximum 42.9 mm
3) Thickness of pipe : 3.2 mm minimum.
Tolerance of Thickness: No Negative Tolerance shall be
allowed either in H.R. Coil thickness or Pipe Thickness.
4) Length of Socket (minimum) : 51 mm
5) Out Side dia of Socket : 49 mm
6) Length of Pipes : Approximate 3 Mtrs. Tolerance of Length +/- 150mm.
7) Test and Tolerances of Pipes : As per IS: 1239 (Part-I) / 2004 with latest amendment.
and Socket except in thickness. As per IS: 1239 (Part-II) / 1992 with latest
8) Minimum Weight of Pipes : 3.13 Kg /Meter in the Parity of Minimum thickness.
9) Quantity Variation : +/- 5% Quantity Variation is acceptable on the orders
place by GWSSB.
The pipes shall have to be manufactured as per terms and conditions laid down in IS: 1239 with
latest amendments. The inspection authority will verify and certify that the appropriate size
(Thick) H.R. Coil conforming to IS:10748 Grade-2 is used to manufacture the pipes to have
specified thickness of pipe considering the tolerance of H.R. Coil i.e. the Coil used shall not be
less than 3.2 mm thick in case of 32mm dia. GI pipes.
The sampling and testing of steel tubes for Visual, Dimensional Alignment and mass
requirement shall be in accordance with IS Specification.
The number of tubes to be sampled and tested for mechanical properties are as per IS
The firm with whom the order will be placed shall be bound to offer the pre-dispatch inspection
to GWSSB or their authorized person as per the relevant IS as applicable with latest revision
DTH Tender Panchmahal Godhra Page
/amendment. The firm shall have to give all required tests, which shall satisfy the requirement
of the specification.
The methods of marking all the pipes to be delivered under scope of contract shall ensure that
all the information will remain legible even after transportation, storage in open space etc. In
general the legible and marking upon the goods shall indicate the followings:
i) ISI certification mark embossed/engraved on each meter.
ii) Manufacturer’s brand name and/or trade mark.
iii) Purchaser’s mark as “GWSSB” is embossed / engraved on each pipe with Year of
iv) Diameter and specified wall thickness.
v) Batch No. / Lot No. to be Inscribed / embossed / engraved on Pipe
vi) Any other important matter that the manufacturer deems fit to be inscribed
1. All Indian Manufacturers having valid BIS License (IS: 1239 Part-1) holders for respective
size for this supply.
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
TECHNICAL SPECIFICATIONS FOR 175 MM UPVC CASING PIPE “CS” TYPE
SCOPE OF CONTRACT
The contractor shall supply and delivering of ISI marked Un-plasticized PVC Casing pipes along with suitable
rubber sealing ring in accordance with one of the types as per IS As Per IS: 5382 with Provision of 5% Exira
Quantity used for water wells confirming to IS: 12818 / 2010 with Latest Amendment.
The Un-plasticized PVC casing pipes manufactured from “POLY VINYAL CHLORIDE“ Confirming to IS:
The brief specifications are as under: For CASING pipe “CS” type
(All dimensions are in mm)
Sr. No. Particulars “CS” TYPE Note
1 Nominal Bore Dia of Pipe 175 mm
2 Mean Outer dia. of Pipe
Maximum. 200.5 -
3 Outer dia. of Pipe at any Point.
4 Mean Outer Dia Over Connection
5 Wall Thickness
6 Mass of Striker 4.0 Kg.
7 Height of Free Fall 2000 mm
8 Effective Length of Pipe 3000 mm
9 Segment length of Pipe 63 mm
Pipe shall have to be manufactured as per terms and conditions laid down in IS: 12818/2010 with latest
amendments. The inspecting authority will verify and certify that Pipe shall have to be manufactured as
per terms and conditions laid down in IS: 12818/2010 with latest amendments.
The inspecting authority will verify and certify that material consisting substantially 'POLYVINYL
CHLORIDE' conforming to IS: 10151/1982.
DTH Tender Panchmahal Godhra Page
The certificate of type test as per IS to be reviewed by the Inspecting Authority and if required, the type test
shall be carried out (at the risk and cost of tenderer) In the presence of representative of GWSSB /
Inspecting Authority.
Casing pipe shall have male threads at spigot ends and female thread at socket ends and confirming to
relevant IS whenever applicable and sealing as per IS standard.
The sampling and testing of Un-plasticized PVC Casing pipes shall be in accordance with IS: 12818/2010 with
latest amendments or latest revision applicable.
The number of tubes to be sampled and tested for required properties shall be as per IS:4985.
The firm with whom order shall be placed shall be bound to offer the pre-dispatch inspection to GWSSB or
their authorized person as per the relevant ISS. The firm shall have to give test required tests which shall
satisfy the requirements of specifications.
The test for the PVC Resin for pipe: It shall be sufficient to show the certificate of chemical test (In
accordance with IS: 4669) to the Inspecting authority for composition based on PVC Resin having a “K “
value of 64 or greater when tested accordance with IS:4669.
Scope of work include all labour, material and machineries cost necessitated to be utilized for;
a) Proper manufacturing of the PVC Casing Pipes/ Accessories/ Rubber Sealing Ring.
b) All tests required to be undertaken at manufacturer's premises.
c) Transportation or the pipes /accessories either by Rail and/or Road Services with all the covers
duly and appropriately insured.
d) Further towards proper maintenance and discharged and all contractual obligations.
MATERIAL & WORKMANSHIP:
(1) General requirements of Materials and Workmanship shall mean any material or article either Raw or
Finished one required to be used in the manufacturing process of Pipes.
(2) All the material shall be new and of high quality.
(3) In case, if material is not specify by relevant ISS tor manufacturing part or the whole as
item, it shall prepare specification in concurrence with Department and shall seek
approval of Engineer prior to its use in the manufacture.
All Test is to be conducted as per IS: 12818/2010 with latest amendment.
The method of marking all the pipes to be delivered under scope-of contract shall ensure that all the
information will remain legible even after transportation, storage in open space etc. In general the legible
indelible marking upon the goods shall indicate the following:
(1) ISI mark on each pipe.
(2) Manufacturers brand name and/or trade mark.
(3) Class / Grade of pipes and Purchaser's mark as "GWSSB" Embossed/ Engraved/ Inscribed
on each pipe and year of manufacturing.
(4) Batch or Lot No.
DTH Tender Panchmahal Godhra Page
(5) Outside diameter and wall thickness of pipes.
(6) The appropriate letter shall be designated to denote identification of pipes.
(7) Any other important matter that the manufacturer or purchaser deems fit to be inscribed.
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
Common clause for Supply of Material
CLAUSE : -1 SUPPLY ORDER:
Supply order shall be placed on the basis of requirement quantity by the Executive Engineer
Superintending Engineer Vadodara, GWSSB have right to cancel supply order or to change in
order quantity, if the material is not offer for inspection with in stipulated time limit.
CLAUSE : -2 INSPECTION:
Material shall be supply and offered for inspection within 30 days from the date of order.
The inspection call with all Internal Test Report shall be given to the inspection authority
Executive Engineer, Public Health Mechanical Division, Godhra. Tenderer have to place material
at concern gwssb’s store premises of concern District for post inspection & then after issue to
Joint Inspection of materials will be carried out at factory by TPI with GWSSB Officer.
Inspection will be carrying out as per procedure prescribed in relevant I.S. to conform the
quality as per detailed technical specification.
If testing / Measuring equipment of Manufacturer dose not performing satisfactorily, in that
case if inspector feels necessity to carryout testing, Sample will be drawn and that Sealed
Sample will be send to Govt. / NABL accredited Lab. And those test may be perform in present
of Manufacturer and GWSSB and / or TPI representative.
During third party inspection if the material offered for inspection is rejected by third party,
Inspection agency will mark the rejection marking and will take other precautionary measures
so that the rejected material cannot be used in GWSSB in future. If material offered for
inspection is not as per specifications & materials is not accepted by the inspecting agency then
the firm shall have to offer for fresh Materials for inspection. In such case the re-inspection
charges shall have to be borne by the firm.
For inspection purpose the manufacture has to go in for line stenciling for identifying size and
class for proper segregation. The stock of offered material shall be in a manageable batch with
adequate space lie spreading the pieces etc. to permit proper inspection and inspection
authority to be present during stamping so as to ensure that only actually cleared material is
stenciled. The inspected material should not be loaded after sunset to avoid inadvertent
dispatch of wrong material.
Initially inspection charges shall have to be paid by supplier to the Inspection Agency and that
will be reimbursed by Executive Engineer, P.H. Mechanical Division, Godhra to the supplier on
verification of inspection note of the inspecting authority and claim made shall be verified based
on the value of materials as may be mentioned in the supply orders on receipt of inspecting
material at designated GWSSB store.
Based on authority of inspection note issued by the Inspecting authority, Materials with
Inspection note and supporting documents will be dispatched to dept. store or site as per
instruction of GWSSB. On receipt of Materials, the inspection note shall be reviewed and
verification will be carried out by concerned Deputy Executive Engineers as regards quantity
DTH Tender Panchmahal Godhra Page
and quality which means physical soundness of materials as a precaution against breakage
during transit. The materials shall be considered as received only on receipt given by the
concerned Deputy Executive Engineer after verifying and satisfying the above requirements.
Any shortfall in materials or in documents consignee will not consider that consignment as
receipt of stores.
CLAUSE : -3 TRANSIT INSURANCE:
The purchaser will not pay separately for any transit insurance and the bidder or contractor will
be responsible for the entire stores contracted arrive in good condition at the destination.
CLAUSE : -4 MATERIAL PROCUREMNET:
The contractor is responsible for material procurement as per requirement of work and supply
of good quality material. He has to submit internal test reports for casing pipes, H.P. sets and GI
pipe procured lot wise from time to time. For not submitting internal test reports then 5% of
bill amount of materials will be deducted.
Department engineer has right to send material for physical / chemical test analysis, if material
found of poor quality after supply, then contract will be terminated anytime & agency will be
blacklisted for 3 years.
Contractor has to submit signed (with stamp) copy of Invoice of material purchased by him to
respective sub division before billing. If signed (with stamp) copy of Invoice of material
purchased is not submitted before billing, then 5% of bill amount of materials will be deducted.
The firm with whom the order will be placed shall be bound to offer the pre-dispatch inspection
to GWSSB or their authorized person as per the relevant IS as applicable with latest revision
/amendment. The firm shall have to give all required tests, which shall satisfy the requirement
of the specification.
All material to be provided by the contractor must be purchased from all Indian Manufacturers
having valid BIS License (IS: 1239 Part-1) for 32 mm Medium Duty G.I. Pipe, valid BIS:
License (Part-II) for Hand pump set & Valid BIS: 12818 / 2010 for UPVC Casing pipes.
CLAUSE : -5 STORAGE AND INSURANCE:
The contractor must store materials in a designated warehouse by himself. Material security and
insurance fall under the contractor's scope.
CLAUSE :-6 USE OF STANDARD MATERIAL AS PER GWSSB POLICY:
If Non std. UPVC casing pipes, 32 mm Medium Duty G.I. Pies & IM-II Hand pump set are utilized
for drilling & hand pump installation work then agency has to replace the whole lot as per
instruction of engineer in charge and if agency fails to do so then it will be reported as poor
performance & agency will be blacklisted.
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
DETAILED SPECIFICATION FOR INSTALLATION OF INDIA MARK-II / III / NORMAL
TELESCOPIC / EXTRA DEEPWELL HAND PUMP, WHICH ARE TO BE FOLLOWED BY THE
CONCERN CONTRACTORS.
1. Before starting of installation work contractor should have to confirm list of successful
bores with dept. & other required details during installation of Hand Pump, contractor
should have to remove bore plug fixed to the open top and of the casing pipe and
measure depth of bore / Tube well and measure static water level and ensure that it is
free from any obstruction. If any obstructions found during the installation, he should
have to inform the Engineer-in-charge.
2. While installation of Hand Pump, contractor should have to excavate pit size, 76 cm x
cm x 40 cm deep.
3. Cement concrete ratio is to be of 1:2:4 mean that C.C. ratio is of 1 Part of Cement, 2 Part
of send and 4 parts of 20mm Metal (Kappchi).
4. Firstly contractor should have to install hand pump pedestal in such a way that the leg of
the pedestal and the pump spout must face the water drain, duly completion of
procedure said in above Clause No.
5. Use spirit level to keep pedestal should be in vertical position. than contractor should
have to pour the C.C. to complete the foundation and Plate form by using M.S. Plate form
6. Plate form should be in slope of 1.50 towards drain so that extra water will run away in
drain and plate form remains dry.
7. Water Soak pit should be prepared in such a way that all water should be soaked and as
per UNICEF Design & Drawing attached.
8. Before, fitting cylinder to the rising pipe, it must be checked in a bucket of water, any
defect or leakage in Cylinder.
9. As per UNICEF specification approximate material requirement for construction of one
plate form along with garden drain (excluding Soak pit) is
(A) Cement 6 bags (0.20 m3) each of 50 Kgs. (as per IS marked Portland cement).
(B) Sand: 0.40 m3.
(C) Metal (20 mm size) 0.80 m3 these quantity must have to be used by the
contractor and certificate for proof should be submitted to sub-divisional office
duly signed by Sarpanch / Talati / Health worker / Teacher or any other Govt.
employee or person staying near by Hand Pump of the Village & Engineer in
10. Before lowering of pipes and rods, for installation check that pipes and rods thread
should be of good finish and clean.
11. Contractor should use jointing compound and tighten fully. Wipe off excess jointing
compound. As such all the component of Hand Pump set should be assembled properly
so that minimum repairing work arises.
DTH Tender Panchmahal Godhra Page
12. The pipes, rods etc. should be tighten and lowered firmly so as to get the quite vertical
string into the bore.
13. The pipes and rods along with cylinder should be lowered so as to get the maximum
advantage of the depth of the bore drilled. Even in season of summer with respect to
S.W.L. discharge and draw down of the bore and handling should be free
14. To protect the newly constructed C.C. work arrangement such as keeping suitable
fencing by local material so as to avoid damage to the C.C. work is to be made by the
contractor. If any damage before hardening of C.C. works, contractor has to repair or
reconstruct the work.
15. If, under any circumstance, any of pipes, Hand Pump rod etc. falls in to the bore,
contractor will have to remove such things at his own risk and cost and will have to re-
lower pipe and Hand Pump Rod.
16. In case of failure bore due to mis-handling of installation of Hand pump lowering of
pipes, cylinder if any, no payment shall be made for the work carried out and full amount
of (drilling and casing pipes) bore will be recovered from the contractor.
17. The contractor and his staff (Team) for bore drilling & installation of H.P should behave
mannerly and humbly with local people / leader / other officers.
18. Compulsory bore drilling & Hand Pump installation weekly progress along with
certificate of satisfactorily working and C.C. work from Sarpanch / Talati / Teacher /
Health worker / Care taker etc. should be submitted to the Sub-Divisional Office of each
last working day of week.
19. Hand Pump handle chain should be Lubrication by Graphite Grease free of cost during
installation of Hand Pumps by the Contractor.
20. Work should be of good finish and as per the specification, design, and standard of
UNICEF and the Dept. Any change in design from contractor will not be allowed without
prior permission of Executive Engineer.
21. Contractor should collect from concerned Sub-Division printed post card of Hand Pump
repairing and distribute free of cost to Sarpanch / Teacher / Health Worker / person
staying near by Hand Pumps.
22. The H.P. set shall be installed only after bore drilled pipes lowered, strata chart
prepared, and approved by the Jr. Geologist, / Hydrologist, Bores checked, measured,
accepted by the Engineer-in-charge and Dy. Ex. Engineer.
23. In the interest of GWSSB, the GWSSB bore Depth, Casing pipes 32mm dia. pipes, Date of
Installation etc. details to be embossed on C.C. plate form, by the Contractor Free of Cost.
24. Lowering and fixing of rising pipes shall be carried out in workman like manner. The
contractor shall be responsible for workman compensation in case of any accident. In
case of dispute of overlooked items the decision of Executive Engineer shall be final and
binding to the Contractor.
The GI Pipes and Cylinder of Hand Pump should be lowered freely and Hand Pump
should work satisfactorily.
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
DETAILS OF DRILLING RIG WITH CONTRACTOR.
Name of work: Drilling of 165 mm dia. x 90 Mts. Deep bore by DTH Rig with providing and
installation of I.M.II Hand pump and construction of C.C. platform as per
UNICEF design & drawing with soak pit incl. supply of 175 mm ND "CS" types
UPVC Casing pipe & 32 mm NB ISI marked medium duty GI Pipe at diff. villages
of Taluka: Shahera-Morva(H)) of Dist. Panchmahal under Different
1. NAME OF AGENCIES / CONTRACTOR :
2. Name of the owner whose Rig is Registered :
with Registering Authority.
3. Total Nos. of Rig Registered under the Name :
of Agency (With following details of each
(A) Type of Rig. :
(B) Air compressor capacity PSI : CFM. :
4. Average working capacity of each Rig in :
Terms of Nos. of Bores per month (with
average depth of Bore).
5. Overall working capacity of Agency in :
Terms of Nos. of Bores per month (with
average depth of Bore) shall be considered
Sr. PSI CFM No. of Bores/Month
3. 200 & above 800 & above
N.B. :The Capacity of Rig ( CFM / PSI of compressor) as mentioned in the attested purchased
document, submitted along with rig will only be valid.
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
GUJARAT WATER SUPPLY & SEWARAGE BOARD
PUBLIC HEALTH MECHANICAL DIVISION, GODHRA
Name of village:_________________ Programme:__________________
Helmet village(Location):_________ Agency:_______________________
District:______________________ Date of completion:__________________
(2) ____mm dia. ERW/UPVC/PVC casing Pipe______
(1)Depth of Bore______ Mt.
(3)______mm dia. coupling used _______Nos. (4) ____mm dia. Bore Plug 1No
(5)Static Water Level________ Mt. (6)Discharge ________L.P.M.
(7)Result: Success/Fail
Details of Bore
Agency Jr. Geologist/Hydrologist In charge Engineer. Deputy Executive Engineer
P. H. Mech. Sub Dn.
DTH Tender Panchmahal Godhra Page
Annexure-III (એને ર-૩)
૧૫ Latitude , Longitude :
DTH Tender Panchmahal Godhra Page
Annexure-IV (એને ર-૪)
૯ Latitude , Longitude
DTH Tender Panchmahal Godhra Page
PLATFORM FOR INDIA MARK- II DEEPWELL HANDPUMP
760 X 760 X 400 DEEP
HANDLE ASSEMBLY
WATER TANK ASSEMBLY
GARDEN OR STAND ASSEMBLY
NATURAL 3000 MIN
GARDEN SLOPE 1: 50 INSTALLTION MARK
CEMENT CONCRETE MIX 1:2:4
NOTE : CONNECTING ROD BORE HOLE
THE FREE END OF CASING PIPE SHALL BE MINIMUM 300MM ABOVE THE INSTALLATION MARK RISER PIPE
CASING PIPE IS NOTE REQUIRED WHEN THE BORE PASSES THROUGH ROCKS.
SUITABLE FOR INSTALLTION ON BORE HOLE WITH FINISHED DIA. OF 100MM. CYLINDER ASSEMBLY
ALL DIMENSIONS IN MILIMETERS. DY. EX. ENGINEER
P.H.MECH. SUB. DN.
DTH Tender Panchmahal Godhra Page
DTH Tender Panchmahal Godhra Page
Gujarat Water Supply & Sewerage Board
Public Health Mechanical Division, Godhra
Name of Work: Drilling of 165 mm dia. x 90 Mts. Deep bore by DTH Rig with providing and
installation of I.M.II Hand pump and construction of C.C. platform as per UNICEF design &
drawing with soak pit incl. supply of 175 mm ND "CS" types UPVC Casing pipe & 32 mm NB ISI
marked medium duty GI Pipe at diff. villages of Taluka: Shahera-Morva(H)) of Dist.
Panchmahal under Different Programme.
Sr. Particulars Qty Rate Unit Place of
1. 175 mm dia. UPVC Pipes As per Free of Cost Mt. Departmental
available in Stores of P. H.
dept. store Mech. Sub
2. I.M.- II Hand Pump set Set Division,
(1) The persons or firm submitting the tender should see that rates in above
schedule are filled by the Executive Engineer, on the issue of form prior to the
submission of the tender.
(2) The materials which are not included in Schedule ‘A’ but required for the work
shall be brought by the contractor at his own cost.
(3) Carting of above materials should be done by the contractor at his own cost.
(4) The contractor should return the balance materials to said otherwise recovery at
the double rate of issue rate will be effected in view Agreement.
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
Gujarat Water Supply & Sewerage Board
PRICE BID (SCHEDULE – B)
Public Health Mechanical Division, Godhra
Name of Work: Drilling of 165 mm dia. x 90 Mts. Deep bore by DTH Rig with providing and
installation of I.M.II Hand pump and construction of C.C. platform as per UNICEF design &
drawing with soak pit incl. supply of 175 mm ND "CS" types UPVC Casing pipe & 32 mm NB ISI
marked medium duty GI Pipe at diff. villages of Taluka: Shahera-Morva(H)) of Dist.
Panchmahal under Different Programme.
Qty. Particulars Rate Unit Amount Rs.
13500.00 Drilling of 215 mm dia. Bore in over burden 303.00 RMT
strata (0-30) including lowering and fixing of
175 mm nominal dia. UPVC pipe/175 mm dia.
ERW pipe up to required depth and further
drilling of 165mm dia. bore hole in rocky strata
(A) Taluka: Shahera
(B) Taluka: Morva(H)
1000.00 Manufacture, supply and delivery of ISI marked 906.00 RMT
UPVC Casing pipe (IS-12818) with latest
c) 175 mm nominal dia. "CS" type
180.00 Manufacture & supply of ISI marked Deep well 7004.00 No.
Hand Pump set (IS 15500/2004 or latest
amendment / revision there of) and supply &
delivery without riser pipes along with 12 Nos. of
connecting rods confirming to IS 1573 with latest
amendment / revision.
Telescopic stand assembly.
6480.00 Supply of ISI marked 32 mm dia. Medium duty GI 251.00 RMT
pipes as per IS:1239 Part-I with latest
DTH Tender Panchmahal Godhra Page
180 Installation of India mark II H. P. assembly as per 3748.59 LS
Unicef specifications complete with carting, Job
lowering of 32 mm dia. riser pipes as required,
construction of C. C. plate form 1:2:4 etc.
including providing cement, sand & kapachi etc.
& construction of soak pit as modified Unicef
design including excavation of (100 cm x 70 cm x
70 cm deep) with filling of stones, broken bricks
or gravel and laying 29 numbers bricks vertically
on edge of soak pit etc. complete.
180 Bore Plug of 100 mm Height made from 5 mm 654.96 No
thick M.S. plate (For top also) with 3 holes at
equal distance on circumference for nut – bolts
type, locking arrangement with nuts – bolts &
lock nuts of std. make complete.
Suitable for 175 mm dia. Pipe
720 Photocopy of bore with bore plug showing 8.20 No
latitude –longitude and Photocopy of hand pump
installation showing latitude –longitude in Post
(Total 4 Photocopies for 1 bore with Hand Pump
Total quantity of Borewell drilling for this tender is fixed. Nos. of Borewells to be drilled in
different talukas mentioned above are based on requirement at the time of tender preparation.
During execution of this tender this quantity may vary.
I/We am/are willing to carry out the work at _______% (in figures)
______________________________________ ( in words) above / below the tendered estimated rates
mentioned above.
(Strike out below whichever is not applicable)
OFFER FOR BELOW : OFFER FOR ABOVE :
1 Estimated cost Rs. 9527343.00 1 Estimated cost Rs.
Signature of Contractor Executive Engineer
DTH Tender Panchmahal Godhra Page
THE DECLARATION REGARDING LITIGATION AND OTHER HISTORY
on Rs. 300/- Non8 Judicial Stamp Duly Notarized
residing at -------------------------------------------------------- do hereby state on solemn
affirmation and declare on oath as under
------------- as a partner and am duly authorized person of the said --------------------
------------------------------------------- to do present affidavit on its behalf.
submitted / uploaded tender / e-tender floated by the Executive Engineer, P. H.
Mechanical Division, GWSSB, Godhra being tender / e-tender ID –------------- for
3. I have read the terms & conditions of the said tender conditions and I have
understood the same and are acceptable to ------------------------------------------------
4. I say the details and particulars given by ----------------------------------------------------
-------------------------------------------------- are true and correct, state and declare
--------------- has not concealed any fact, details or particulars and all the said ------
true and correct and complete.
5. I say that if any particulars are found to be incorrect or incomplete or misleading
in any matter, the Gujarat Water Supply and Sewerage Board shall have full
authority to cancel the tender at any point of time and the -----------------------------
consequences that may arise out of the action of the Gujarat Water Supply and
Sewerage Board.
6. I say that I am aware that making wrong statement on affidavit is a punishable
7. I say that I have not been terminated / blacklisted / debarred in any State
Government / Municipal Corporation / Central Government / Any State
Government Organization / Urban Local body and / or their undertaking
companies or their Special Purpose Vehicle (SPV), Asian Development Bank /
World bank or similar international funding organizations during last Five years.
Dated Signature of Contractor
DTH Tender Panchmahal Godhra Page
FROM OF BANK GUARANTEE
(Earnest Money Deposit)
Whereas M/s ………………………………….………………….( herein after called the Tenderer) is
desirous and preferred to tender for works in accordance with the terms and conditions
of the tender of the work of ………………………………………………………………………. and
where as We, Bank, agree to give the tenderer a guarantee for the Earnest Money
1. Therefore, we hereby affirm that we are Guarantors on behalf of the Tenderer
up- to total pay to rupees ………………………………………………………………., in words)
Rs…………………..(in figures) and we undertake to Executive Engineer
………………………………. Division………………….Department of Government of Gujarat
……………………………up-to his first written demand, without demur, without delay
and without necessity of a previous notice of judicial or administrative
procedures and without the necessity to prove to the Bank the defects or
shortcomings of the contractor any sum within the limit of Rs
2. We further agree that the guarantee herein contained, shall remain in full force
and effect during the period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on us in writing
on or before ………………………………………(date to be specified will not be less than
180 days from the stipulated date of receiving the tender) we shall be discharged
from all liabilities under this guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the
previous consent of the Executive Engineer ………………………….Division……………in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of
the tenderer or of the bank.
Signature and Seal of the Guarantor
Date : Address:
DTH Tender Panchmahal Godhra Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender of DTH Bore H.P. 180 Shahera.pdf
DMO_2941_01-Apr-2026_744.pdf
Circular for inviting tenders at estimated rates.pdf
CE(M) Paripatra for Bore accident (2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .