| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹62.0 LAccepted-AOC | ₹62.0 L | 1st | Accepted-AOC 1st lowest |
| 2 | 2nd₹63.4 L+₹1.4 L (2.24%)Rejected-AOC 20 OAKAS FLAT NO 8 4TH FLOOR MAYUR COLONY KOTHRUD PUNE 411038 | PUNE | MAHARASHTRA | 411038 | ₹63.4 L+₹1.4 L (2.24%) | 2nd | Rejected-AOC 3rd lowest |
| 3 | 3₹65.4 L+₹3.5 L (5.62%)Rejected-AOC | ₹65.4 L+₹3.5 L (5.62%) | 3 | Rejected-AOC 2nd lowest |
| Sl No | Description | Qty | Unit | Tritech Engineering Projects L1 | HYDROPNEUM SYSTEMS L2 | A. D. Engineers L3 |
|---|---|---|---|---|---|---|
| 1.00Preparation of evacuation plan by collecting requisite data along Dahisar river and analysis of the effects of dam rupture as per CWC guidelines for Tulshi Dam under AEOC(TM) division. | ||||||
| 1.01 | Labour charges for removing grass thorny shrubs,jungli shrub kubabhul and alike grass around building making the ground clean by shovel and phavaras etc complete. | 10,179 | SQM | 12.3 ₹1,25,201.7 Lowest | 14 ₹1,42,506 | 15 ₹1,52,685 |
| 1.02 | Reconnaissance survey including study of survey sheets maps etc. for alignment including three diamensional of apexes ,chain and compass or cross staff survey,fixing pegs,and preparation of alignment plan with all types of compliance ,if required from department etc. complete.a) excluding fixing apex stone. | 26 | Km | 6,000 ₹1,56,000 Lowest | 6,400 ₹1,66,400 | 6,500 ₹1,69,000 |
| 1.03 | Transferring B.M.to the area to be surveyed by fly back method or double treasure method and establishing the B.M. on existing permanent structure or on such monument which shall long last etc. complete. | 26 | Km | 1,850 ₹48,100 Lowest | 2,000 ₹52,000 | 2,500 ₹65,000 |
| 1.04 | Carrying out topographical survey, contouring of all terrain (all types),road,bridge,and building works by using Electronic Total Station surveying instruments( 3 second least count) with its all accessories tools, plants including preparing necessary plans such as L-sections, Cross-sections,contouring,topographical detail survey plan as directed, by processing data on computer, preserving processed data on CD's or any other advanced type computer hardware including all manpower i.e. Electronic Total Station Operator, Computer Engineer, trained supervisor, skilled labours,machineries such as Electronic Total Station with its Accessories, computer with latest configuration, materials such as stationary required for printing processed data ,plotting drawing of required sizes ,submission of processed data and plans in properly bound as directed etc.complete. | 26 | Km | 47,625 ₹12,38,250 Lowest | 49,500 ₹12,87,000 | 50,500 ₹13,13,000 |
| 1.05 | Calculation of free catchment area from Topo sheet at each cross section of river, Calculation of free catchment flood at each cross section of river including calculating cumulative free catchment flood etc. complete.Calculation of free catchment area from Topo sheet at each cross section of river, Calculation of free catchment flood at each cross section of river including calculating cumulative free catchment flood etc. complete. | 261 | Nos | 4,425 ₹11,54,925 Lowest | 4,600 ₹12,00,600 | 4,500 ₹11,74,500 |
| 1.06 | Carrying out dam breach inundation analysis for various alternatives, estimation of dam breach flood, dam breach outflow hydrograph 1in 25 yearflood & 1 in 100 year flood,evalution value of 'N' from available data,finding out normal channel carrying capacity,at each c/s etc complete. | 261 | Nos | 3,780 ₹9,86,580 | 3,750 ₹9,78,750 Lowest | 3,900 ₹10,17,900 |
| 1.07 | Computation of High flood levels for caution zone, restricted zone, prohibited zone, natural river channel capacity river bed gradiant,channel velocity, flow area, flood widths, travel time to reach by feeding geometric such as c/s data, value of 'N' & hydraulic data such as normal river flow, spillway design flood, dam break flood, river bed gradient etc.in legal computer software such as HEC-RAS etc .complete | 261 | Nos | 7,500 ₹19,57,500 | 7,455 ₹19,45,755 Lowest | 7,750 ₹20,22,750 |
| 1.08 | Providing demarcation of Caution zone, Restricted zone, Prohibited zone at every village and where ever necessary on both banks of river by levelling instrument and marking zone by oil paint,counting houses and population coming under each zone, survey of safe place, safe aproach road for shifting in emergency by consulting with local authorities, as directed by Engineer Incharge.etc. complete. | 10 | Nos | 18,000 ₹1,80,000 Lowest | 20,000 ₹2,00,000 | 20,000 ₹2,00,000 |
| 1.09 | Item No.9 :-Preparation of Design report & final report to be submitted to Revenue Department including detailed description ,abstract ,various statements as per instructions of Dam safety Organization etc. complete.Initial copy | 1 | Nos | 50,000 ₹50,000 Lowest | 52,500 ₹52,500 | 55,000 ₹55,000 |
Tender Value
Refer Docs
EMD Value
₹65,000
Closing Date
22 Mar 2024, 4:00 pmClosed
Dy HE Maint
Ghatkopar water works yard, LBS Road, Ghatkopar West, 400086
Preparation of evacuation plan by collecting requisite data along Dahisar river and analysis of the effects of dam rupture as per CWC guidelines for Tulshi Dam under AEOC(TM) division.
2024_MCGM_1034318_1
Dy HE M 11436 13.03.2024
Open Tender
Miscellaneous Services
Item Rate
180 days
Tulashi Lake
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹65,000
3 Sept 2025
15 Mar 2024
26 Mar 2024
15 Mar 2024
22 Mar 2024
15 Mar 2024
Amount
Preparation of evacuation plan by collecting requisite data along Dahisar river and analysis of the effects of dam rupture as per CWC guidelines for Tulshi Dam under AEOC(TM) division.
Labour charges for removing grass thorny shrubs,jungli shrub kubabhul and alike grass around building making the ground clean by shovel and phavaras etc complete.
Reconnaissance survey including study of survey sheets maps etc. for alignment including three diamensional of apexes ,chain and compass or cross staff survey,fixing pegs,and preparation of alignment plan with all types of compliance ,if required from department etc. complete.a) excluding fixing apex stone.
Transferring B.M.to the area to be surveyed by fly back method or double treasure method and establishing the B.M. on existing permanent structure or on such monument which shall long last etc. complete.
Carrying out topographical survey, contouring of all terrain (all types),road,bridge,and building works by using Electronic Total Station surveying instruments( 3 second least count) with its all accessories tools, plants including preparing necessary plans such as L-sections, Cross-sections,contouring,topographical detail survey plan as directed, by processing data on computer, preserving processed data on CD's or any other advanced type computer hardware including all manpower i.e. Electronic Total Station Operator, Computer Engineer, trained supervisor, skilled labours,machineries such as Electronic Total Station with its Accessories, computer with latest configuration, materials such as stationary required for printing processed data ,plotting drawing of required sizes ,submission of processed data and plans in properly bound as directed etc.complete.
Calculation of free catchment area from Topo sheet at each cross section of river, Calculation of free catchment flood at each cross section of river including calculating cumulative free catchment flood etc. complete.Calculation of free catchment area from Topo sheet at each cross section of river, Calculation of free catchment flood at each cross section of river including calculating cumulative free catchment flood etc. complete.
Carrying out dam breach inundation analysis for various alternatives, estimation of dam breach flood, dam breach outflow hydrograph 1in 25 yearflood & 1 in 100 year flood,evalution value of 'N' from available data,finding out normal channel carrying capacity,at each c/s etc complete.
Computation of High flood levels for caution zone, restricted zone, prohibited zone, natural river channel capacity river bed gradiant,channel velocity, flow area, flood widths, travel time to reach by feeding geometric such as c/s data, value of 'N' & hydraulic data such as normal river flow, spillway design flood, dam break flood, river bed gradient etc.in legal computer software such as HEC-RAS etc .complete
Providing demarcation of Caution zone, Restricted zone, Prohibited zone at every village and where ever necessary on both banks of river by levelling instrument and marking zone by oil paint,counting houses and population coming under each zone, survey of safe place, safe aproach road for shifting in emergency by consulting with local authorities, as directed by Engineer Incharge.etc. complete.
Item No.9 :-Preparation of Design report & final report to be submitted to Revenue Department including detailed description ,abstract ,various statements as per instructions of Dam safety Organization etc. complete.Initial copy
Additional copies
Submitting all concerned documents reports drawings to Govt.athourities in Water Resources Department, compliance of remarks raised by such authority and getting sanction to report from them etc. complete.
HYDROPNEUM SYSTEMS
A. D. Engineers
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .