Qty Description Rate Per Amount Rs
Excavation for foundation including sorting out and
1 1 stacking of useful material and disposing of the excavated 122.94 Cum
stuff with all lead and lift (A) in Loose or soft soil
Excavation for foundation including sorting out and
2 1 stacking of useful material and disposing of the excavated 157.33 Cum
stuff with all lead and lift (B) in Hard soil
Excavation for foundation including sorting out and
3 1 stacking of useful material and disposing of the excavated 267.08 Cum
stuff with all lead and lift (C) in Hard Murrum
Excavation for foundation including sorting out and
stacking of useful material and disposing of the excavated
stuff with all lead and lift (D) in Soft rock not requiring
Excavation for foundation including sorting out and
5 1 stacking of useful material and disposing of the excavated 627.47 Cum
stuff with all lead and lift (E) in Hard Rock
Providing and laying C.C. 1:4:8 for foundation and plinth
using crushed metal, 40mm nominal size including all
material & labour, curing etc. complete (including cost of
cement) but excluding cost of formwork
Providing and laying C.C. 1:3:6 for foundation and plinth
using crushed agg., 40mm nominal size including all
material & labour, curing etc. complete (including cost of
cement) but excluding cost of formwork.
Uncoursed Rubble Masonry with hard stone of approved
quality in foundations and plinth in Cement Mortar 1:5 (1-
cement : 5-coarse sand including levelling
up etc. complete
Uncoursed Rubble Masonry with hard stone of approved
quality in foundations and plinth in Cement Mortar 1:6 (1-
cement : 6-coarse sand including levelling
up etc. complete.
Qty Description Rate Per Amount Rs
UCR masonary in hard stone of approved quality in C.M.
1:6 above plinth level & upto floor two level including cost
10 1 of cement for superstructure 2961.08 Cum
Providing and casting in situ ordinary cement concrete M-
11 1 150 for coping, over riding returns including formwork 3893.31 Cum
curing and finishing complete.
White stone bela masonary in C.M. 1:6 for superstructure
12 1 including necessary materials & labour curing etc. 6479.69 Cum
(including cost of cement)
Supplying of BS Crushed of 40 to 50 mm size on road site as
13 1 directed with an av. lead of 25.00 Kms. including spreading 915.29 Cum
Supplying of H.B. Metal 40 to 63 mm size on road site as
14 1 directed with an average lead 25.00 Km. including 759.63 Cum
spreading as directed
Spreading the stone aggregate of any size / H.B. Metal /
quarry spalls etc. on road site as directed
Providing and casting in situ ordinary C.C. 1:2:4 for
abutment / pier / return wall etc. of C.D.& bridges on road
with material labour and centering including cost of
Supplying and stacking BS crushed stone aggregate of hard
stone 25 to 40mm size free of this intergraded pieces
17 1 deleterious and organic matter and grading as per IRC code 792.09 Cum
on quarry site including loading etc.
Suppliying of graded stone aggregate of following sizes (for
18 1 W.B.M. Road)(3) Crushed stone aggregate for Hard Quality 747.64 Cum
up to 63 mm size
Supplying and stacking BS crushed stone aggregate of hard
stone 12 to 20mm size free of this intergraded pieces
19 1 deleterious and organic matter and grading as per IRC code 825.18 Cum
on quarry site including loading etc.
Supplying and stacking BS crushed stone aggregate of hard
stone 10 to 12mm size free of this intergraded pieces
20 1 deleterious and organic matter and grading as per IRC code 672.94 Cum
on quarry site including loading etc.
Qty Description Rate Per Amount Rs
Supplying and stacking BS crushed stone aggregate of hard
stone 6mm grit size free of this intergraded pieces
deleterious and organic matter and grading as per IRC code
on quarry site including loading etc.
Supplying and stacking coarse , clean sharp sand on river
and on quarry site including loading etc.
Supplying and stacking hard murrum 50 to 150 mm on
quarry site including loading etc.
Supplying and stacking soft murrum on quarry site
including loading etc.
Supplying and stacking Black Stone (Rubble) on quarry site
including loading etc.
Supplying and quarry spalls on quarry site including loading
Providing & laying weep hole in Aburtments, and returns
by using A.C. pipe of 100mm including laying in proper
27 1 grede and jointing the completed as per detailed 86.70 Each
Providing and supplying evenly priming / tack coat with
bitumen @ rate of 10 Kg/ Sq.M. (including heating the
bitumen but excluding the cost of bitumen)
[A] 10 Kg. / Sqm. 7.02 sqm
[B] 5Kg. / Sqm. 3.51 sqm
[C] 2.5Kg. / Sqm. 1.76 sqm
Cleaning the ground for helipad by cutting grass and small
big plants brooms etc. as directed.
Providing 15mm thick dry stone pitching using black stone
30 1 of approved quality with average 10 cm thick murrum 344.46 SQM
bedding on road including labour materials.
22.50 cm thick dry stone pitching with murrum bedding on
road including labour materials
20.0 cm thick dry stone pitching with murrum bedding on
road including labour materials.
Qty Description Rate Per Amount Rs
Providing rubble filling in scouring, portion at C.D. works
including all labour and materials etc. complete
Providing parapet of ordinary cement concrete M-150 as
per detailed drawings with necessary reainforcement
including, shuttering, laying vibrating and finishing to line
and level complete. (ii) Cast in situ.
Repairs to existing damage RCC parapet on road by
adopting the original design, using necessary steel,
centering, shuttering, laying, vibrating, curing with all
labour and material (including cost of cement)
Providing new R.C.C. parapet in C.C. 1:2:4 by vertical
column cast in situ and horizontal beam of precast with
curbing as per detail drawing using steel as per design
centering, curing etc. complete. (including cost of cement)
Repairs to disturb pitching on road side by removing and
using necessary new materials etc. complete.
Labour charges for dry stone pitching 15 cm. thick including
preparing the surface.
Guniting concrete surface with cement mortar applied with
compressor after
cleaning surface and spraying with epoxy complete as per
Technical specification
Providing and inserting nipples with approved fixing
compound after drilling holes for grouting as per Technical
40 1 specifications including subsequent cutting/removal and 502.98 each
sealing of the hole as necessary of nipples after completion
of grouting with Cement/Epoxy
Qty Description Rate Per Amount Rs
Supplying and fixing reinforced concrete heavy duty non-
pressure pipes with collars for culverts carrying heavy
traffic as per IS 458-1991 specifications including setting
the pipes in C.M. 1:2 watering and laying (to level or
slopes) of class NP3 of following internal daimeters.(i)
Supplying and fixing reinforced concrete heavy duty non-
pressure pipes with collars for culverts carrying heavy
traffic as per IS 458-1991 specifications including setting
the pipes in C.M. 1:2 watering and laying (to level or
slopes) of class NP3 of following internal daimeters.(i)
Supplying and fixing reinforced concrete heavy duty non-
pressure pipes with collars for culverts carrying heavy
traffic as per IS 458-1991 specifications including setting
the pipes in C.M. 1:2 watering and laying (to level or
slopes) of class NP3 of following internal daimeters.(i)
Supplying and fixing reinforced concrete heavy duty non-
pressure pipes with collars for culverts carrying heavy
traffic as per IS 458-1991 specifications including setting
the pipes in C.M. 1:2 watering and laying (to level or
slopes) of class NP3 of following internal daimeters.(i)
Scrapping of weak damage cement plaster upto 10.00 mt
45 1 ht for C.D. works including centering and scaffolding etc. 19.89 Sqm
Providing cement plastering in C.M. 1:3 for CD works upto
46 1 10.00 mt height (including cost of cement) including 230.50 Sqm
necessary material, labour and curing etc. complete
Earthwork for embankment including breaking clods
47 1 dressing for road work in line and leveling with all labour 163.69 Cum
etc. complete excluding rolling and watering.
Sealing of cracks/porous concrete by injection process
48 1 through nipples/Grouting 82.82 kg
complete as per Technical specification.(A) Cement Grout
Qty Description Rate Per Amount Rs
Pointing on Uncoursed stone masonry with cement mortar
1:3 (1-cement : 3-coarse sand) (A) Flush pointing
Cement pointing to white stone bela masonary in C.M. 1:3
as directed. (including cost of cement) (A) Flush Pointing)
Leveling the side shoulders or road on both side with the
51 1 front side bucket mounted Tractor with machineries, fuel 353.5 Hours
Repairing GI pipe reailing by Providing new galvanized mild
steel tube of 40 mm dia with one coat of primer and two
coats of anemall paints with material and labour etc.
Filling the debris and manure etc. in contractor’s own
tractor and disposing off the same as directed
Clearing the road side by removing the trees which is falled
54 1 down on road side during the cyclone or monsoon rain fall
with all labour etc. complete
up to 0.30 Mt. dia 505.00 No
above 0.30 Mt. dia 1010.00 No
Providing and casting in situ ordinary cement concrete M-
200 for R.C.C. Jacketing as per drawing including centering,
shuttering, scaffolding where necessary laying, vibrating
curing and finishing etc. complete.
Clearing the waterway of C.D. works upstream and
56 1 downstream side by removing the obstructing grass, 35.35 SQM
brooms, small tress etc. and making waterway clear.
Earthwork in cuting in all sorts of soil and soft murrum
including conveying and spreading the stuff, embankment
57 1 as and where directed within 200meters 134.47 Cum
from the end of the cutting with all required lead and lift.
Engaging the JCB for the different type of work on road
side with machineries, oil, fuel, driver etc. complete
Qty Description Rate Per Amount Rs
Clearing the road side by removing the trees which is falled
59 1 down on road side during the cyclone or monsoon rain fall 707.00 No
with all labour etc. complete
Providing and Filling in scoured position of CD work end
60 1 portion with soft murrum as directed with average 2.5 Km. 311.32 Cum
lead including cost of material and labour.
Spreading blindage or road crust filling the gaps in metal
61 1 and leveling to camber and gradient as directed.(ii) Sand 154.84 Sqmt
Providing and casting in situ ordinarycement concrete M-
200 for average 75 mm thick wearing coat laid as directed
including tamping ,vibrating, finishing, curing and filling in
joints with bitumen complete.
Providing TMT Bar FE 500D reinforcement for R.C.C. work
63 1 including bending, binding and placing in position complete 77.29 Kg
upto floor two level
Engaging tractor for side borms cutting and dressing as
64 1 directed including cost of driver, diesel necessary cutting 303.00 Hour
and dressing equipment etc. complete as directed.
Rolling and consolidation of soling including filling in
65 1 depression which occur during the process, with power 22.75 Sqm
roler 8 tonne to 12 tonne.
Providing heavy road roller of 8 to 10 M.T. wt with heavy
license driver / operator for rolling work of asphalt, earth
work, metalling work with necessary fuel and oil as
Providing mechanical crane (On hire charges ) of 3.00 M.T.
weight lifting capacity on stated road site including
necessary fuel, oil, grease and driver / operator for carry
out work as directed (including crane)
Providing mechanical crane (On hire charges ) of
M.T. weight lifting capacity on stated road site including
necessary fuel, oil, grease and driver / operator for carry
out work as directed (including crane)
Qty Description Rate Per Amount Rs
Water Bound Macadam (Providing, laying, spreading and
compacting stone
aggregates of specific sizes to water bound macadam
specification including
spreading in uniform thickness, hand packing, rolling with
vibratory roller 8-10
tonnes in stages to proper grade and camber, applying and
brooming requisite type
of screening/ binding Materials to fill up the interstices of
coarse aggregate,
watering and compacting to the required density.) (By
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead.
Loading and unloading the debris from ground and
71 1 disposing away from Nagar Palika Limit by own vehicle as 2525.00 Day
Supplying of potable water in own tanker on road site or
helipad site as directed.
72 1 (i) 3000 Liter Capacity 1010.00 Trip.
(ii) 10000 Liter Capacity 3535.00 Trip.
(iii) 15000 Liter Capacity 5050.00 Trip.
Supplying & stacking hard murrum natural GSB materials
50mm to 150mm size on quarry site.
Providing and fixing Pre-Cast Rubber dye Inter locking
concrete Block 60mm thick with grade of concrete M-200
74 1 pnumatic compressed by mechanically pressed and as per 565.60 sqm
approved design including 75mm sand layer for levelling
and filling the joint with sand in proper line and level.
Providing and fixing Pre-Cast Rubber dye inter locking
concrete Block 60mm thick with grade of concrete M-250
75 1 pnumatic compressed by mechanically pressed and as per 656.50 sqm
approved design including 75mm sand layer for levelling
and filling the joint with sand in proper line and level.
Clearing and grubbing road land including uprooting rank
vegetation grass bushes,shrubs,sapling and trees girth up
76 1 to 300 mm removal of stumps of trees cut 28455.09 Hect
earlier and disposal of unserviceable materials (C) By
mechanical means in area of light jungle
Qty Description Rate Per Amount Rs
Planting tree by the road side (avenue tree) in 0.60 mt. dia
holes, 1.00 mt. deep dug in the ground the soil with
77 1 delayed the farm yard / slug manure planting the sampling, 497.41 Tree
back filling the wtering fixing the tree guard and maintain
the plant for one year (Without tree guard amount)
Removing and scraping of old deteriorated Plaster of any
thickness from wall / RCC member including stacking of
serviceable material and disposal of unserviceable from
site of work with all lead.
Providing 10mm thick cement plaster in single coat on
brick/concrete walls for interior plastering upto floor two
level and finished even and smooth in (i)Cement mortar
1:3 (1-cement:3-sand)
Wall painting (two coats) with plastic emulsion paint of
approved brand and manufacture on undecorated wall
80 1 surface to give an even shade including throughly brushing 84.37 Sqmt
the surface free from mortar droppings and
other foreign matter and sand papered smooth.
Providing and casting in situ ordinary cement concrete M-
200 for R.C.C. works in pier cap abutment cap and dirt wall
including controlled cement concrete M-250 Bed block or
pedestal or required size below bearings as per detailed
drawings, centering, shuttering, scaffoldiring, wherever
necessary, laying vibrating curing and finishing complete.
I / we am/ are willing to carryout the rate at __ % (in figures) __________ the estimated rates mentioned
above in column No.4
1 Testing of materials Charge paid by Contractor
2 Samples to be sent by contractor to GERI.
Executive Engineer
Road & Building Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 ANNEXURE_II.pdf
02 SBD.pdf
03 PARIPATRA_NEW.pdf
04 GST RESOLUTION NEW.pdf
05 RTGS PARIPATRA.pdf
06 GST.pdf
07 Sch-B.pdf
08 Sharto.pdf
09 Bahedhari Patra.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .