| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹1.4 LAccepted-Finance | ₹1.4 L | 1st | Accepted-Finance 1st lowest |
| 2 | 2nd₹1.4 LAccepted-Finance MEERUT UTTAR PRADESH 250110 INDIA UDYAM UP 56 0008622 | MEERUT | UTTAR PRADESH | 250110 | ₹1.4 L | 2nd | Accepted-Finance 2nd lowest |
| 3 | 3rd₹2.0 LAccepted-Finance | ₹2.0 L | 3rd | Accepted-Finance 3rd lowest |
| 4 | 4th₹3.1 LAccepted-Finance | ₹3.1 L | 4th | Accepted-Finance 4th lowest |
| 5 | 5th₹3.2 LAccepted-Finance | ₹3.2 L | 5th | Accepted-Finance 5th lowest |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
23 Dec 2023, 12:00 pmClosed
Executive Engineer
220 KV Guladiya
FOR REPLACEMENT OF 132/33 KV 40 MVA T/F 3rd BY REPAIRED 01 No. 63 MVA T/F AT 132/33 KV S/S AMROHA UNDER ETD-AMROHA.
2023_UPTCL_869799_2
E-T-12/ETD-AMROHA/2023-24
Open Tender
Electrical Works
60 days
Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineer
₹2,000
23 Dec 2023
15 Dec 2023
23 Dec 2023
15 Dec 2023
23 Dec 2023
15 Dec 2023
Amount
Partially drain out the transformer oil from tank, Opening of jumpers HV/LV side, removal of earthing strips from bushing and dismantling of 40 MVA T/F accessories including radiators, HV/LV Bushings, HV/LV turrets, HV/LV neutral bushings, Bucholz relay, oil pipe from conservator tank to main tank, oil pipe to OLTC and surge relay conservator tank at 220KV S/S Amroha with all cost of men, material T&P required for completion of work.
Shifting/ Dragging of oil filled 40 MVA T/F from plinth to near open space (Distance about 20mtr) including turning of main tank if required with all T&P and work required to complete the job satisfactorily
Additional shifting of 40MVA T/F @ every 5mtr
Dismantling of HV side LAs and its structure of 40MVA T/F (01 Job includes all 03 phase) Complete Erection of LA with structure after erection of 63 MVA T/F (01 Job includes all 03 phase)
Packing of All HV bushings of 40 MVA T/Fs in crates and shifting the bushing from site to store.(Packing material will be provided by contractor at his own cost.)
Dragging of 63 MVA T/F Main tank from unloading site to T/F Plinth –Approx. distance -20 Mtr.
Additional shifting of 63 MVA T/F @ every 5mtr
Replacement of gasket of Radiators/Bushings/Pilpelines of T/F by providing and fixing of new gasket as per existing size made of rubberized cork sheet Kotika/Nu cork/Turborze brand grade 07 provided by contractor.
Complete, erection of 63 MVA T/F by erection of radiator, conservator tank, bushing with its turrets (if available) connecting of all oil pipe line, erection of cooling fans, making all required control cable connections, buchholz relay etc. for completing the work, topping of T/F oil and final oil filling in tank, radiator, conservator tank, making earthing of main tank, MB, DM box, HV, LV neutral including providing insulated support and all other associated work for completion of work.
Replacement of existing old T/F RTCC Panel by new RTCC panel by opening of control cable, cutting of earthing, laying control cables, making termination, preparation of cable schedule etc. & shifting of dismantled panel to elsewhere as per directions of site incharge.
Centrifuging of complete T/F oil in T/F by connecting centrifuging pipes circulating the T/F oil through centrifuging machine (min capacity above 6kL with properly cleaned filters) of suitable capacity and taking the BDV and PPM value of the oil periodically till the required value is achieved.( approx. 20 KL) centrifuging machine, BDV machine, ppm machine and other T&P will be under scope of contractor.
Hi-tech power transmission
Technocrat Electrical
M/s S.S. Refregeration
SATKAR TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid