Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Techno-commercially rejected. |
| 5 | Rejected-Technical | Rejected-Technical Techno-commercially rejected. |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
2 Mar 2022, 10:00 amClosed
PARAU MURMU
MES DEPT ROOM NO 25 ADMIN BUILD RCF LTD CHEMBUR MUMBAI-400074
Fabrication, Erection and Commissioning Of alternate/bypass (ET-5A) belt conveyor system from Urea-ET-5 Conveyor to Urea-ET-6 Conveyor for repairing of Urea ET-5 Gantry inside Urea Silo in Urea bagging plant at RCF Trombay Unit.
2022_RCFL_673806_1
ET - MES/238/L/2122/393
Open Tender
Miscellaneous Services
Item Rate
730 days
MES DEPT ROOM NO 25 ADMIN
AS PER NIT
12 documents required · 12 mandatory
₹0
₹20,000
Yes
11 May 2022
16 Feb 2022
2 Mar 2022
16 Feb 2022
2 Mar 2022
16 Feb 2022
Amount
Job No 1- Fabrication & Erection of 800 mm width entire conveyor belt system along with its walkway at the Entrance of Urea silo. {Elevation: 20 meter from ground level, Inclination: 15-degree max.}
Fabrication, erection and commissioning of conveyor structure, Gearbox & Motor foundation, Head, Tail, Take up pulley structure, G I gratings, decking plate & vertical support from Top of Silo for ET-5A conveyor structure as per scope of work.
Installation of Head Pulley, Tail pulley, bend pulleys(2 Nos), Take-up Pulley, troughing & return frames (30 & 10 respectively) and rollers & Gear box with motor, cells etc. of Suphala slat-4A conveyor as per scope of work. (Supply & installation of 40 nos. anchor fasteners, size M-16 is in Party scope)
Fabrication & erection of hand railing & toe guard for Suphala slat-4A Conveyor
Job No 2- Fabrication & Erection of diverters/tripper with discharge chutes at different location in Urea ET-6 conveyor belt. (Approx. 06 nos.}
Fabrication, erection & installation of diverters/tripper with discharge chutes as per Scope of Work
Job No 3- Replacement of Hand railing for Urea ET-6 walkway inside Urea Silo
Fabrication & erection of hand railing & toe guard for Urea-ET-6 Conveyor as per SOW
Job No 4- Fabrication & Erection of Transfer chutes from Urea ET-5 to Urea-ET-6 conveyor inside Urea Silo
Fabrication & Erection of Transfer chutes from Urea ET-5 to Urea-ET-6 conveyor as per SOW
Job No 5- Extension Urea ET-6 conveyor’s Tail pulley by another 6 meters. {South side}
Removal, fabrication, erection & commissioning of Tail Pulley structure of conveyor as per SOW
Job No 6- Fabrication & Erection of head Pulley structure along with Gearbox foundation & Take-up pulley structure for Urea ET-5 Conveyor.
Removal, fabrication, erection and commissioning of Gear Box & Motor base frames/Structure of conveyors as per scope of work. (Structural work -02 MT approx.)
Removal, fabrication, erection & commissioning of Head Pulley structure of conveyors as per scope of work. (Structural work -02 MT approx.)
Removal, fabrication, erection & commissioning of Take-up Pulley structure of conveyors as per scope of work. (Structural work -04 MT approx.)
Balaji Engineering Works
AL AAQIB ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .