| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-Finance H NO 859 SANTEMOL RAIA SALCETE GOA | SOUTH GOA | GOA | 403103 | ₹3.8 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.8 CrSame as L1Rejected-Finance GOA | NORTH GOA | GOA | 403524 | ₹3.8 CrSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L2₹3.8 CrSame as L1Rejected-Finance | ₹3.8 CrSame as L1 | L2 | Rejected-Finance L2 |
| 4 | L3₹3.8 Cr+₹6.7 L (1.77%)Rejected-Finance | ₹3.8 Cr+₹6.7 L (1.77%) | L3 | Rejected-Finance L3 |
| 5 | L4₹4.0 Cr+₹17.9 L (4.73%)Rejected-Finance H NO 37 A NEAR MILITARY CAMP MARGAO QUEPEM ROAD NAVELIM SALCETE GOA | NORTH GOA | GOA | 403529 | ₹4.0 Cr+₹17.9 L (4.73%) | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | D K BHOMKAR L1 | Shri Sidharth R. Xette Bandekar L1 | ULTRACON CONSTRUCTIONS PVT. LTD. L3 | GAJ CONSTRUCTION PRIVATE LIMITED L2 | SAIBINI CONSTRUCTION L4 | Paresh G. Kamat & Associates L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, silt, clay, gravel moorum, of all varieties shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured / shattered, decomposed rock and such materials either in full or in parts, as the case may be adopting any approved method or as may be convenient or permitted inclusive of chiseling, wedging etc, but blasting prohibited in all conditions such as dry, moist, saturated, sub merged, foul conditions etc. and refiling of Excavated Earth and disposal or surplus stuff with 50 mt lead and all lift etc. and as directed by Engineer-in-charge etc. all complete. | 6,954 | Cum | 246.7 ₹17,15,551.8 | 356.89 ₹24,81,813.06 | 320 ₹22,25,280 | 240 ₹16,68,960 Lowest | 240 ₹16,68,960 Lowest | 263.12 ₹18,29,736.48 |
| 2.00 | Providing and laying stone rip for talus with basaltic / granitic stones 60% of which shall comprise stones not less than 0.0425 cu m in size each and remaining 40% comprising well graded rubble not below the size of 0.0142 cum including the cost of conveyance of all material, spreading hand packing, wedging etc for all leads and lifts as directed by the Engineer in charge | 435.6 | Cum | 3,120.1 ₹13,59,115.56 | 2,356.66 ₹10,26,561.1 | 1,399.15 ₹6,09,469.74 Lowest | 2,000 ₹8,71,200 | 2,000 ₹8,71,200 | 1,999.16 ₹8,70,834.1 |
| 3.00 | Centering and shuttering including strutting, propping and removal of form work for a) Foundation footings bases for columns & mass concrete. | 1,229 | Sqm | 585.05 ₹7,19,026.45 | 506.73 ₹6,22,771.17 | 400.09 ₹4,91,710.61 | 400 ₹4,91,600 | 407 ₹5,00,203 | 374.44 ₹4,60,186.76 Lowest |
| 3.10 | Vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 1,859 | Sqm | 688.56 ₹12,80,033.04 | 597.29 ₹11,10,362.11 | 400.13 ₹7,43,841.67 Lowest | 450 ₹8,36,550 | 479 ₹8,90,461 | 440.68 ₹8,19,224.12 |
| 3.20 | Columns, Piers, Pillars, Abutments, Posts and struts (square rectangle polygon in plan) | 385.66 | Sqm | 859.43 ₹3,31,447.77 | 704.91 ₹2,71,855.59 | 500.15 ₹1,92,887.85 Lowest | 550 ₹2,12,113 | 595 ₹2,29,467.7 | 550.13 ₹2,12,163.14 |
| 4.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works up to plinth level | 2,135 | Cum | 5,873.63 ₹1,25,40,200.05 | 5,107.5 ₹1,09,04,512.5 Lowest | 6,800.11 ₹1,45,18,234.85 | 5,950 ₹1,27,03,250 | 6,500 ₹1,38,77,500 | 6,023.5 ₹1,28,60,172.5 |
| 4.10 | In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 1,004 | Cum | 6,407.52 ₹64,33,150.08 | 5,571.75 ₹55,94,037 Lowest | 7,099.09 ₹71,27,486.36 | 6,800 ₹68,27,200 | 7,000 ₹70,28,000 | 6,834.68 ₹68,62,018.72 |
| 5.00 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinforcement (1 cement: 1½ coarse sand:3 graded stone aggregate 20mm nominal size : a) All works up to plinth level. | 121 | Cum | 6,191.51 ₹7,49,172.71 | 5,383.5 ₹6,51,403.5 Lowest | 7,208.54 ₹8,72,233.34 | 7,400 ₹8,95,400 | 7,000 ₹8,47,000 | 6,603.76 ₹7,99,054.96 |
| 5.10 | b)In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level | 133 | Cum | 8,127.01 ₹10,80,892.33 | 6,025 ₹8,01,325 Lowest | 7,399.11 ₹9,84,081.63 | 7,800 ₹10,37,400 | 8,000 ₹10,64,000 | 7,391.28 ₹9,83,040.24 |
| 6.00 | Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 21,590 | Kg | 75.04 ₹16,20,113.6 Lowest | 107.88 ₹23,29,129.2 | 84.1 ₹18,15,719 | 90 ₹19,43,100 | 95 ₹20,51,050 | 80.04 ₹17,28,063.6 |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
29 May 2026, 4:00 pmClosed
EE XII WRD Gogal
EE XII WRD Gogal
Construction of Open Type Bandhara at Vakikulan, V.P. Collem - Shigao, across Khandepar river, in Dharbandora Taluka for augmentation of Opa Water Supply.
2026_WRD_29256_1
WDXII/TECH/F.10/01e/2026-27
Open Tender
Civil Works
Item Rate
180 days
Shigao Dharbandora Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹9.4 L
3 Sept 2026
15 May 2026
2 Jun 2026
15 May 2026
29 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, silt, clay, gravel moorum, of all varieties shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured / shattered, decomposed rock and such materials either in full or in parts, as the case may be adopting any approved method or as may be convenient or permitted inclusive of chiseling, wedging etc, but blasting prohibited in all conditions such as dry, moist, saturated, sub merged, foul conditions etc. and refiling of Excavated Earth and disposal or surplus stuff with 50 mt lead and all lift etc. and as directed by Engineer-in-charge etc. all complete. | 6,954 | Cum | - | - |
| - | Providing and laying stone rip for talus with basaltic / granitic stones 60% of which shall comprise stones not less than 0.0425 cu m in size each and remaining 40% comprising well graded rubble not below the size of 0.0142 cum including the cost of conveyance of all material, spreading hand packing, wedging etc for all leads and lifts as directed by the Engineer in charge | 435.6 | Cum | - | - |
| 3 | Centering and shuttering including strutting, propping and removal of form work for a) Foundation footings bases for columns & mass concrete. | 1,229 | Sqm | - | - |
| 3.1 | Vertical surfaces such as retaining walls , return walls, walls (any thk) including attached pilasters, buttresses, plinth and string courses, fillets, etc. | 1,859 | Sqm | - | - |
| 3.2 | Columns, Piers, Pillars, Abutments, Posts and struts (square rectangle polygon in plan) | 385.66 | Sqm | - | - |
| 4 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works up to plinth level | 2,135 | Cum | - | - |
| 4.1 | In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 1,004 | Cum | - | - |
| 5 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinforcement (1 cement: 1½ coarse sand:3 graded stone aggregate 20mm nominal size : a) All works up to plinth level. | 121 | Cum | - | - |
| 5.1 | b)In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level | 133 | Cum | - | - |
| 6 | Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 21,590 | Kg | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_29684.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .