Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.7 LAccepted-AOC SOUPARNIKA P O VELLUR | KERALA | ₹6.7 L | 1 | Accepted-AOC executed agreement |
| 2 | 2₹7.4 LRejected-Finance | ₹7.4 L | 2 | Rejected-Finance second least |
| Sl No | Description | Qty | Unit | Radhakrishnan P K V L1 | PRASAD KUMAR K L2 |
|---|---|---|---|---|---|
| 1.00RENOVATION OF THODU | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 14 | hour | 322.5 ₹4,515 | 360 ₹5,040 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 139.52 | cum | 240.45 ₹33,547.58 | 265 ₹36,972.80 |
| 1.00 | OD366937/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site (DAR 60.7.1) | 143.2 | cum | 3,727.23 ₹5.3 L | 4,100 ₹5.9 L |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 25.6 | sqm | 360.41 ₹9,226.50 | 380 ₹9,728 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.4 | cum | 8,620.24 ₹55,169.54 | 9,000 ₹57,600 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 320 | kilogram | 104.93 ₹33,577.60 | 125 ₹40,000 |
Updated dates
Tender Value
₹6.7 L
EMD Value
₹16,744
Closing Date
6 Nov 2025, 11:00 amClosed
Aneesh. K
Assistant Engineer, LSGD Engineering wing, Payyannur municipality
Proj no. 648/26 RENOVATION OF ANJIRIPPAD THODU
2025_LSGD_815801_12
AE/LSGD/ETNDR-06/2025-26
Open Tender
Civil Works - Others
180 days
Payyannur municipality
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,480
Yes
₹16,744
Yes
4 Jun 2026
28 Oct 2025
7 Nov 2025
28 Oct 2025
6 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
viewsbd.pdf
Tender Documents • 1.73 MB
viewnit.pdf
Additional Documents • 0.03 MB
BOQ_1366768.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid