Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.1 LAccepted-AOC GRAM TITOLI POST O KUHEEL DISTRICT ALMORA | L1 | Accepted-AOC acpted |
Tender Value
₹70 L
EMD Value
₹1.4 L
Closing Date
27 May 2022, 5:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION DIVISION BHIKIYASAIN NAULA
Augmentation of Koteshwar Sashikhal GOV Pumping Water Supply Scheme Zone-I
2022_MDPEY_44412_1
858vividh5 277 dt 11 5 2022
Open Tender
Civil Works - Water Works
Item Rate
120 days
SULT
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,480
Yes
EE CUSTRUCTION DIVISION UKPJN BHIKIYASAIN
₹1.4 L
Yes
24 Aug 2022
13 May 2022
30 May 2022
13 May 2022
27 May 2022
13 May 2022
Amount
Providing of all materials, carting to site of work, laying to true alignment & jointing of GI (Medium) Screwed pipes conforming to latest BIS code (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc. complete for the following dia:
Providing of all materials, Carting from site store to site of work, Lowering into trenches with true to alignment, Laying of MS ERW Pipes grade Yst 210, Jointing by electric welding process with proper grade of eletrodes suitable for jointing of water supply pipe lines (Ador, L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete.
100 mm dia 2.8 mm thick
200 mm dia 5.6 mm thick
200 mm dia 6.4 mm thick
Excavation for pipe line trenches
Excavation in soil mixed with single boulders etc. requiring the use of specials T&P, if any for pipe line trenches including lift up to 1.5 M and lead kup to 30 M with back filling, watering, ramming of excavated earth in trenches.
Same as above but in medium rock by chiseling.
Supply of all materials, labour, T & P etc and construction of Wheel Valve/ Water meter chamber as per type, design
Making ferrule connection in the existing main of G.I, A.C, PVC or any type of pressure mains with saddle piece, service connections, fittings and fixing of G.M. ferrule including tapping the main, including all materials, ferrule, clamp etc. and bib cock.for FHTC
Supply of all materials, labour, T&P etc. and construction of RCC CWR of following capacities (in kiloliters)with M.S ladder outside & inside of the tank, M.S. M.H. Cover with locking arrangement, supply and fixing of outlet, inlet, overflow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting on tank body, vertical pipes, ladder, M.S. M.H cover etf. complete with approved water proofing (apex)/ enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes, specials .
Protection work
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge
Cement concrete 1:4:8 including supply of all materials, labour, T&P etc. complete.
Cement concrete 1:2:4 including supply of all materials, labour, T&P etc. complete.
Random Rubble Stone Masonry in 1:6 cement and sand mortar including supply of all materials, labour, T&P etc. complete.
Random Rubble Stone Masonry laid dry including supply of all materials, labour, T&P etc. complete.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .