Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance | -28.00% | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.0 LAdmitted-Finance | -18.00% | ₹4.0 L | L2 | Admitted-Finance |
| 3 | L3₹4.4 LAdmitted-Finance | -11.15% | ₹4.4 L | L3 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,800
Closing Date
11 May 2026, 6:00 pmClosed
Er Jyotika Sambyal
EXECUTIVE ENGINEER PWD R AND B DIVISION VIJAYPUR
Please refer to BOQ
2026_PWDJK_309283_2
06 of 2026-27 dated 04-05-2026
Open Tender
Civil Works
60 days
EXECUTIVE ENGINEER PWD R AND B DIVISION VIJAYPUR
Please refer to tender documents
3 documents required · 3 mandatory
₹600
EXECUTIVE ENGINEER PWD R AND B DIVISION VIJAYPUR
₹9,800
EXECUTIVE ENGINEER PWD R AND B DIVISION VIJAYPUR
14 May 2026
4 May 2026
12 May 2026
4 May 2026
11 May 2026
4 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres ( All kinds of soil ) | 45.75 | Cum | 256.85 | ₹11,750.89 |
| 2 | Hand-packing stones in wire-crates of mechanical woven double and twisted , hexagonal wire mesh gabion zinc coated mesh type 100 x120mm mesh wiere dia 2.70mm salvage wire dia 3040mm lacing wire dia 2.20mm ( as per national / international standards crate size 6 x1.2 x1.2mtr including cost of crates and stones ( Cost of crates shall be deducted at stock rate if supplied departmentaly ) with all leads and lifts carriage complete | 219.6 | Cum | 1,783.15 | ₹3,91,579.74 |
| 3 | Dumping stone including cost of stones in Horizontal on level | 42.27 | Cum | 1,042.9 | ₹44,083.38 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 36 | Cum | 218.4 | ₹7,862.4 |
| 5 | Supply and laying of River Bed Materials including leveling, dressing, watering & consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete, | 59.88 | Cum | 300 | ₹17,964 |
| 6Carriage of Material by Mechanical Transport including loading unloading complete :- | |||||
| 6.01 | Stone boulder avg. lead upto 15 km. | 42.27 | Cum | 405.31 | ₹17,132.45 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1001336.xls
BOQ • 0.89 MB
Download all tender documents and submit your bid