| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21 LAccepted-Finance DHALIWAL | FATEHGARH SAHIB | PUNJAB | 140402 | ₹21 L | 1 | Accepted-Finance L1 |
| 2 | 2₹21.1 L+₹10,000 (0.48%)Rejected-Finance VILL LANGWAN PO LAMBLOO TESHIL DISTT HAMIRPUR 177029 | HAMIRPUR | HIMACHAL PRADESH | 177029 | ₹21.1 L+₹10,000 (0.48%) | 2 | Rejected-Finance L2 |
| 3 | 3₹21.2 L+₹15,500 (0.74%)Rejected-Finance JOGINDER NAGAR | SHAHID BHAGAT SINGH NAGAR | PUNJAB | 144509 | ₹21.2 L+₹15,500 (0.74%) | 3 | Rejected-Finance L3 |
| 4 | Rejected-Technical N A | PALWAL | HARYANA | 121004 | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Yash Pal Sharma L1 | Madan Lal L2 | Deepak Kumar L3 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS from Seer Khad to Bhiyanu Peer through skilled / unskilled manpower i.e chowkidar for maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.. | 1 | Job | 21,00,000 ₹21,00,000 Lowest | 21,10,000 ₹21,10,000 | 21,15,500 ₹21,15,500 |
| 2.00Description of main components of the scheme is as under:- | ||||||
| 2.01Civil works: 3 No pump house, 1No infiltration gallery 50 mtr , 3 Nos sump wekk, 7 Nos storage tans of various capacity). Rising main: 10685 Rmt, (Booster stage 125mm dia 70 Rmt,1st stage 150 Rmt 6115 Rmt,2nd stage 150mm dia 2625Rmt and 3rd stage 150mm dia=2340Rmt, 1st phase to Bhulwwai 80mm dia=2400 Rmt Distribtuon system: 181902 Rmt (20mm to 200mm dia) Pumping machinery :Booster stage:2x5=10HP,1st stage=4x50=200HP,2nd stage 4x80=320HP and 3rd stage 4x80=320HP. No of storage tank:2 Nos & sub storage tank 6 Nos Total working hours 76 per day : through , 12 Nos persons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: litr ). Pumping hours per day= hrs and energy consumptoin per day Unit. | ||||||
Tender Value
₹21.1 L
EMD Value
₹42,165
Closing Date
15 Jul 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS from Seer Khad to Bhiyanu Peer group of villages in Tehsil Ghumarwin District Bilaspur (SH Operation of pumping machinery and distribution system of water supply for sector storage tank of different habitation for one year).
2026_HPIPH_138050_1
BLP-BLP-0736-NIT No. 4768-4869 Dated 03/07/2026
Open Tender
Civil Works
Item Rate
Sub Division Kandrour Section Talyana
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹42,165
23 Jul 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS from Seer Khad to Bhiyanu Peer through skilled / unskilled manpower i.e chowkidar for maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.. | 1 | Job | 108 | ₹108 |
| 2Description of main components of the scheme is as under:- | |||||
| 2.01 | Civil works: 3 No pump house, 1No infiltration gallery 50 mtr , 3 Nos sump wekk, 7 Nos storage tans of various capacity).
Rising main: 10685 Rmt, (Booster stage 125mm dia 70 Rmt,1st stage 150 Rmt 6115 Rmt,2nd stage 150mm dia 2625Rmt and 3rd stage 150mm dia=2340Rmt, 1st phase to Bhulwwai 80mm dia=2400 Rmt
Distribtuon system: 181902 Rmt (20mm to 200mm dia)
Pumping machinery :Booster stage:2x5=10HP,1st stage=4x50=200HP,2nd stage 4x80=320HP and 3rd stage 4x80=320HP.
No of storage tank:2 Nos & sub storage tank 6 Nos Total working hours 76 per day : through , 12 Nos persons.
Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No.
Quantity of water lifted per day: litr ).
Pumping hours per day= hrs and energy consumptoin per day Unit. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
TC.pdf
Tender Documents • 0.18 MB
BOQ_204424.xls
BOQ • 0.23 MB
PWD6.pdf
Tender Documents • 0.40 MB
PWD8.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .