Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹247.0 Cr
EMD Value
₹2.5 Cr
Closing Date
31 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Gandhinagar Irrigation Construction Division,, Gandhinagar
Engineering, Procurement and Construction (EPC) Work for Designing and Construction of Rajpur Barrage, Protection work & Other allied activities across Sabarmati River near village Rajpur Ta. & Dist. Gandhinagar including Operation and Maintenance for 10 Years.
260463
10 of Year 2025-26
Open
Civil - All
Works
Gandhinagar
8 documents required · 7 mandatory · 1 optional
₹18,000
Yes
Executive Engineer, Gandhinagar Irri. Const. Division, Gandhinagar
₹2.5 Cr
Yes
2 Jan 2026
2 Jan 2026
2 Jan 2026
31 Jan 2026
2 Jan 2026
Name of Work: Engineering, Procurement and Construction (EPC) Work for Designing and
Construction of Rajpur Barrage, Protection work & other allied activities
across Sabarmati River near Village Rajpur Ta. & Dist. Gandhinagar
including Operation and Maintenance for 10 Years.
Cost put to Tender 247,02,26,483.00/-
DRAWINGS (TYPICAL)
Date of Downloading : Up to Dt. 02-01-2026 to Dt. 31-01-2026, 18:00 Hrs.
Date of Online Submission : Up to Dt. 31-01-2026, 18:00 Hrs.
Date of Submission of Tender Fee,
EMD/Bid Security & Other : Up to Dt. 09-02-2026, 18:00 Hrs.
Documents (Physical)
Date Pre-bid Conference : Dt. 09-01-2026, 14:00 Hrs.
Date of Opening of Bid : Dt. 02-02-2026, 12:00 Hrs. (if possible)
OFFICE OF THE SUPERINTENDING ENGINEER
AHMEDABAD IRRIGATION PROJECT CIRCLE
A-BLOCK, 9TH FLOOR, BAHUMALI BHAVAN
VASTRAPUR, AHMEDABAD – 380052. (PHONE: 079-27912505)
RAJPUR BARRAGE VOLUME-IV (ENCLOSURE-II) DRAWING (TYPICAL)
LIST OF TENDER DOCUMENTS
SR. VOLUME NO. PART DESCRIPTION
Invitation for Bid (IFB)
Section -1 Instructions to Bidders
1. VOLUME - I Section -2 Qualification Information
Section -3 Conditions of Contract
Section -4 Contract Data
Section -5 Technical Specifications-
Civil Works (General)
Section -5 Technical Specifications-
PART-A Civil Works (Particular)
Section -5 Technical Specifications-
2. VOLUME - II Civil Works (Design Requirements)
PART-B Section -5 Technical Specifications-Mechanical
Section -5 Technical Specifications-Electrical
Section -5 Technical Specifications-Operation &
Maintenance Works
- Section -6 Form of Bid
3. VOLUME - III Section -7 Bill of Quantities
(Separately Attached as Enclosure-III)
Section -8 Securities and Other Forms
- Section – 9 Drawings (Typical)
(Separately Attached As Enclosure-II)
Section -10 Documents to Be Furnished by Bidder
5. VOLUME - V Section -11 Project Related Conditions and Scope
Enclosure-I Technical Specifications
(Part-A, B, C, D)
ENCLOSURES Enclosure-II Drawings (Typical)
Enclosure-III Bill of Quantities
(Price Bid and Payment Schedule)
RAJPUR BARRAGE VOLUME-IV (ENCLOSURE-II) DRAWING (TYPICAL)
INTRODUCTION AND CONDITIONS:
The volume contains drawings for having basic ideas about structure to be designed and to be
constructed by bidder. These drawings (Typical) were prepared for Construction of Ambod
(madhavgadh) barrage which is approx 11.00 km from proposed Rajpur barrage. The
Design and drawings were prepared by Central Design Organization, Gandhinagar
NWRWS&KD based on data available and basic information. The EPC contractor must
conduct its own survey, geo-tech investigations, Hydrological studies and furnish its own
design to withstand design flood/check flood and duly vetted. The drawings contain various
components of barrage like: Spillway, Piers, Raft, Abutments, Sidewalls, Cutoffs, Foundation
Details, Launching apron, Protection work for banks etc. The bidder should get basic ideas of the
structure using the drawings and furnish design accordingly.
The design, drawing, sketches, narrations, etc. mentioned in the tender is showing the
NWRWS&KD requirement in respect to size, shape, levels, type and nature of work etc. and is
indicative and it is only for the guidance to the agency. The Agency has to submit his own
survey, design required for the work and is required to be got vetted from the institutions
approved by EIC and the agency has to carry out the work after getting procedure of approval as
decided by the NWRWS&KD.
The contractor shall have to design the proposed structure and its components as per relevant
Indian Standards and provide norms/methods and guidelines provided by of Central Design
Organization, NWRWS&KD, Central water commission (CWC), Central Board of Irrigation
and Power(CBIP), CWPRS and Indian standards.
NOTE: DRAWINGS UNDER THIS VOLUME ARE ONLY FOR KNOWLEDGE
PURPOSE, THE BIDDER MUST DESIGN RAJPUR BARRAGE AND ITS
COMPONENTS BY HIMSELF AND THE DESIGN MUST BE SUCH THAT
STRUCTURE SHOULD WITHSTAND UNDER ALL ADVERSE CONDITIONS THAT
MAY OCCUR AND MUST FULFILL ALL THE CRITERIA FOR DESIGN FLOOD TO
BE PASS EASILY THROUGH GATE OPERATIONS WITHOUT ANY DAMAGES TO
THE STRUCTURE AND OTHER REQUIREMENTS. ANY MODIFICATIONS
SUGGESTED BY ENGINEER-IN-CHARGE AND/OR APPROVAL AUTHORITY AS
PER TENDER CONDITION MUST BE INCORPORATED BY CONTRACTOR AT THE
TIME OF APPROVAL OF DRAWINGS. THE CONTRACTOR MUST TAKE CARE
THAT THESE DRAWINGS MAY NOT BE USED FOR ANY OTHER PURPOSE. ANY
CLAIM BASED ON THESE DESIGNS WILL BE STRAIGHT AWAY REJECTED AS
THESE DRAWINGS ARE ONLY FOR KNOWLEDGE PUPOSE.
FOR PRELIMINARY ESTIMATE PURPOSE ONLY PLATE-1/4
1. THIS DRAWING IS INTENDED SOLELY FOR PRELIMINARY ESTIMATE
PURPOSE ONLY & SHALL NOT BE USED AS THE BASIS FOR ANY
EXECUTION OR IMPLEMENTATION.
2. THIS DRAWING IS GENERAL ARRANGEMENT FOR BARRAGE AND ITS
2400 ENERGY DISSIPATION ARRANGEMENT PORTION, U/S & D/S BED
PROTECTION WORK ONLY, BASED ON THE SURVEY DATA SUBMITTED BY
FIELD OFFICE. SEPARATE DRAWINGS SHOULD BE REFERRED FOR OTHER
COMPONENTS LIKE U/S-D/S WALLS, ABUTMENT, BANK PROTECTION
WORK, PIER, GATE AND RAFT FOUNDATION OF PIER ETC(PLATE-2/4,
PALATE-3/4, PLATE-4/4).
D/S LAUNCHING APRON
D/S LAUNCHING APRON D/S LAUNCHING APRON
3. THE BARRAGE IS PROPOSED TO BE CONSTRUCTED AS BROAD CRESTED
600 TH TOE WALL
WEIR RESTING ON PERMEABLE FOUNDATION WITH THE 11 NO. OF
VERTICAL LIFT GATES OF SIZE 18.288 x 4.88 m (60' x 16') AND PIER
THICKNESS OF 2.50m
MAIN.32Ø-180C/C BOTH SIDE
4. TAKE CLEAR COVER FOR REINFORCEMENTS IN CHUTE BLOCK, BASIN
BLOCK AND END SILL BLOCK AS 150mm.
600TH INVERTED FILTER
1600 5. RETURN WALL SHOULD BE EXTENDED UP TO TOP OF THE GUIDE BANK. IT
RETURN WALL-EXTENDED UPTO TOP OF THE GUIDE BANK RETURN WALL-EXTENDED UPTO TOP OF THE GUIDE BANK
MAY BE FINALLY DECIDED BY FIELD OFFICE AS PER SITE SITUATION.
6. SUITABLE STEPS SHALL BE ARRANGED TO REACH GATE OPERATION
DIST.12Ø-150C/C
ASSEMBLY AND PROPER PROTECTION RAILING MAY BE PROVIDED TO U/S
7. FOR DETAILED LAY OUT OF WALL, SECTIONAL DETAILS AND DETAILS OF
27 ROWS D/S BLOCK PROTECTION
27 ROWS D/S BLOCK PROTECTION
75 WIDE GAP BAJARI SAND
EXTENDED CUTOFF 1500X1500X900 TRAINING WALL, REFER SEPARATE DRAWINGS OF WALL. (PLATE-2/4 )
1500X1500X900 EXTENDED CUTOFF
2 TIMES D/S CUTOFF DEPTH 2 TIMES D/S CUTOFF DEPTH 8. THIS DRAWING HAS BEEN PREPARED BASED ON PRELIMINARY DATA
WITHOUT DETAIL ANALYSIS, SO AT THE TIME OF DETAIL ANALYSIS AND
20Ø-300C/C BOTH WAYS
CC M-25 ENDSILL BLOCK
DESIGN MAJOR CHANGES MAY BE ENCOUNTERED IN BARRAGE
COMPONENTS. AND ALSO IT IS NECESSARY TO TEST SUCH STRUCTURE
ON 2D AND 3D PROTOTYPE MODEL.
9. DIMENSIONS SHALL NOT BE MEASURED BUT CALCULATED IN CASE ANY
2300 D/S FLOOR END
DIMENSION IS MISSED.
2300 D/S FLOOR END
10. ALL THE DIMENSIONS ARE IN MILLIMETER AND RLs ARE IN METER.
D/S TRAINING WALL
1000 D/S TRAINING WALL
REFER SEPARATE DRAWING
2:1 REFER SEPARATE DRAWING
20Ø-300C/C BOTH WAYS
CC M-25 BASIN BLOCK
DENTATED ENDSILL BLOCK CONST. JOINTAT DENTATED ENDSILL BLOCK
AT EVERY 20m INTERVAL
1500 D/S CONCRETE FLOOR
CONST. JOINT IN WALL
D/S CONCRETE FLOOR RL
D/S WALL TOP RL
4000 BASIN BLOCK BASIN BLOCK
20Ø-300C/C BOTH WAYS
CC M-25 CHUTE BLOCK
MINIMUM 1000 THICK COMPACTED SAND BASE LAYER
WITH RELATIVE DENSITY OF 0.7(BELOW BASE LAYER
PIER PROFILE INDICATIVE ONLY
CENTER LINE OF BARRAGE AXIS
REFER SEPARATE DRAWING
SECTIONAL ELEVATION
LIGHT WEIGHT LOW CHUTE BLOCK CHUTE BLOCK LIGHT WEIGHT LOW
DENSITY BLOCK FILLING DENSITY BLOCK FILLING
D/S SLOPING GLACIS D/S SLOPING GLACIS
ABUTMENT BEHIND END PIER
ABUTMENT BEHIND END PIER
GAP TO BE FILLED
REFER SEPARATE DRAWING
CREST RL 64.12 CREST RL 64.12 REFER SEPARATE DRAWING
MAIN.25Ø-200C/C BOTH SIDE
1500 U/S SLOPING GLACIS U/S SLOPING GLACIS
1000 U/S FLOOR THICKNESS
U/S CONRETE FLOOR U/S CONRETE FLOOR
RL 61.5 RL 61.5 EXTENDED CUTOFF
2500 2 TIMES U/S CUTOFF DEPTH
EXTENDED CUTOFF
2 TIMES U/S CUTOFF DEPTH
U/S WALL TOP RL
U/S TRAINING WALL U/S TRAINING WALL
REFER SEPARATE DRAWING
DIST.12Ø-150C/C
REFER SEPARATE DRAWING
10 ROWS U/S BLOCK PROTECTION 10 ROWS U/S BLOCK PROTECTION
STONE/RUBBLE SPAUL
RETURN WALL-EXTENDED UPTO TOP OF THE GUIDE BANK RETURN WALL-EXTENDED UPTO TOP OF THE GUIDE BANK
U/S LAUNCHING APRON
U/S LAUNCHING APRON U/S LAUNCHING APRON
ACCOMPANIMENT TO THIS OFFICE VERNACULAR LETTER NO.
CDO/C/MADHAVGADH BARRAGE/144, DATED: 04/10/2023
GENERAL ARRANGEMENT DRAWING
PLAN SHOWING BARRAGE, ENERGY DISSIPATION
ARRANGEMENT AND BASE PROTECTION WORK
FOR MADHAVGADH BARRAGE
FLOW DIRECTION VILLAGE: AMBOD(MADHAVGADH) DIST:GANDHINAGAR
TRIMMED GROUND/BACKFILL LEVEL TOP RL
TRIMMED GROUND/BACKFILL LEVEL PLATE: 2/4
FOR PRILIMINARY
GAP BETWEEN END PIER
AND ABUTMENT TO BE
ESTIMATE PURPOSE ONLY
FILLED BY LIGHT WEIGHT
12Ø-300 C/C BOTH WAYS FILLED WITH SELECTED ON EXPOSED FILLED WITH SELECTED
ON EXPOSED SURFACE 1.0 M EXCAVATED BACKFILL MATERIAL SURFACE 1.0 M EXCAVATED BACKFILL MATERIAL
BELOW GL BELOW GL 300 TH QUARY SPAUL LAYER
150 TH GRAVEL LAYER
150 TH SAND LAYER
EXCAVATION AS EXCAVATION AS
PER ACTUAL STRATA PER ACTUAL STRATA
AVG GL RL 61.5 AVG GL RL
FDN RL 59.0 FDN RL
SECTION OF ABUTMENT (BEHIND END PIER) SECTION OF U/S WALL (IN U/S PORTION) DETAIL "A"
FILTER BEHIND D/S WALL
RL 78.00 TRIMMED GROUND/BACKFILL LEVEL
FILLED WITH SELECTED
EXCAVATED BACKFILL MATERIAL
1. THIS DRAWING IS INTENDED SOLELY FOR PRELIMINARY ESTIMATE PURPOSE ONLY & SHALL NOT BE USED AS THE BASIS FOR ANY EXECUTION OR IMPLEMENTATION.
1:20 2. THIS DRAWING SHOULD BE REFERRED FOR THE SECTIONAL AND TEMPERATURE REINFORCEMENT DETAILS OF ABUTMENT, U/S AND D/S WALL. FOR THE DETAILS OF OTHER
100Ø WEEP 0.65 COMPONENT SEPARATE DRAWING SHOULD BE REFERRED.
HOLE PIPE 1 3. THE CONCRETE GRADE OF THE CC GRAVITY TYPE WALL SHALL BE CC M15 AND THE REINFORCEMENT BARS SHALL CONFORM TO HYSD GRADE CONFORMING TO IS:1786.
STAGGERED DETAIL "A" EXCAVATION AS 4. THE WALL IS PROPOSED AS MASS GRAVITY STRUCTURE.
PER ACTUAL STRATA 5. THIS DRAWING HAS BEEN PREPARED BASED ON PRELIMINARY DATA WITHOUT DETAIL ANALYSIS WHERE MINIMUM SBC REQUIREMENT IS 50.0 T/m2.
6. ABUTMENT IS BEING LAID ADJOINING TO END PIER SO TO AVOID THE INTRUSION OF THE U/S FACE SLOPE IN TO END PIER, THE ABUTMENT HAS BEEN TAKEN BACK UP TO LENGTH
OF 4.38 m IN END PIER REGION. SPACE BETWEEN END PIER AND ABUTMENT WALL SHALL BE FILLED WITH LIGHT WEIGHT CONCRETE BLOCK HAVING DENSITY LESS THAN 1.0 T/m3.
7. APPROPRIATE CONSTRUCTION JOINTS SHALL BE PROVIDED NEARLY ABOUT 20.0 m APART WHICH MAY BE KEPT VARIABLE AS PER SITE CONDITIONS. JOINT TO BE FILLED WITH
POLYMER BASED FILLER SHEET OR ASPHALT BASED FILLER MATERIAL SHEET.
CC M15 8. FOR ERECTING VERTICAL POSTS FOR PROVIDING PIPE RAILING ON TOP OF THE WALL NECESSARY ARRANGEMENT SHALL BE MADE IN THE TOP OF WALL FOR WELDING THE VERTICAL
POSTS, AT THE TIME OF EXECUTION.
9. THE MISSING DIMENSIONS SHALL BE COMPUTED AND NOT MEASURED DIRECTLY FROM THE DRAWING. ACCOMPANIMENT TO THIS OFFICE VERNACULAR LETTER NO.
10. CLEAR COVER OF 100 mm SHALL BE PROVIDED TO REINFORCEMENT WHERE EVER REQUIRED. CDO/C/MADHAVGADH BARRAGE/144 , Dtd : 04/10/2023
11. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS ARE IN METER UNLESS OTHERWISE SPECIFIED.
12. ADEQUATE CARE HAS BEEN TAKEN IN PRODUCING THIS DRAWING AND DIMENSIONS. HOWEVER, INADVERTENT MISTAKES/ERROR, IF FOUND IN THE DRAWING, MAY BE AND GET
1.50 CORRECTED.
DETAILS OF U/S WALL, D/S WALL AND ABUTMENT OF
1 13. THIS DRAWING HAS BEEN PREPARED BASED ON PRELIMINARY DATA WITHOUT DETAIL ANALYSIS. SO AT THE TIME OF DETAIL ANALYSIS AND DESIGN MAJOR CHANGES MAY BE
FDN RL 59.0 3750 1500 12350 ENCOUNTERED IN THE U/S, ABUTMENT AND D/S WALL. MADHAVGADH BARRAGE
17600 AT: VILLAGE-AMBOD (MADHAVGADH), DIST; GANDHINAGAR
SECTION OF D/S WALL (IN D/S PORTION)
FOR PRELIMINARY ESTIMATE PLATE NO. 3/4
SPILLWAY AXIS SPILLWAY AXIS
(10% GATE INOPERATIVE) SPAN-2 SPAN-3 SPAN-9 SPAN-10 (10% GATE INOPERATIVE) (10% GATE INOPERATIVE) (10% GATE INOPERATIVE)
SPAN- 4 TO SPAN -
PIER CONCRETE PIER CONCRETE
M 25 GRADE M 25 GRADE
FLOW 16 mm Ø 250 mm C/C FLOW 16 mm Ø 250 mm C/C
DISTI. REINFORCEMENT DISTI. REINFORCEMENT
TOP OF GATE R.L. 69.30 FRL 69.00 FRL
3000 MAIN REINFORCEMENT MAIN REINFORCEMENT
CREST R.L. 64.12 RL 64.12 RL
2500 18288 2500 2500 18288 2500 2500 18288 2500 2500 18288 2500 LEAN CONCRETE M 10 GRADE 20 mm Ø 250 mm C/C LEAN CONCRETE M 10 GRADE 20 mm Ø 250 mm C/C
20 mm Ø 250 mm C/C DIST. 20 mm Ø 250 mm C/C DIST. 20 mm Ø 250 mm C/C DIST. 20 mm Ø 250 mm C/C DIST. 32 mm Ø 100 mm C/C MAIN DISTRIBUTION 32 mm Ø 100 mm C/C MAIN DISTRIBUTION
REINFORCEMENT. REINFORCEMENT. REINFORCEMENT. REINFORCEMENT. TOP OF RAFT R.L. 58.50 RL 58.50 REINFORCEMENT REINFORCEMENT RL 58.50 REINFORCEMENT REINFORCEMENT
2.8 M THICK RAFT IN 2.8 M THICK RAFT IN
12 mm Ø 2 LEGGED
32 mm Ø 100 mm C/C 12 mm Ø 2 LEGGED 32 mm Ø 100 mm C/C 12 mm Ø 2 LEGGED 12 mm Ø 2 LEGGED 32 mm Ø 100 mm C/C 32 mm Ø 100 mm C/C 12 mm Ø 2 LEGGED M-25 GRADE CONCRETE M-25 GRADE CONCRETE
2.8 M THICK RAFT (M : 25) 2.8 M THICK RAFT (M : 25) STIRRUPS @ 200 mm C/C
MAIN REINFORCEMENT STIRRUPS @ 200 mm C/C MAIN REINFORCEMENT STIRRUPS @ 200 mm C/C STIRRUPS @ 200 mm C/C MAIN REINFORCEMENT MAIN REINFORCEMENT STIRRUPS @ 200 mm C/C 12 mm Ø 2 LEGGED
BOTTOM OF RAFT R.L. 55.70 RL 55.70 RL 55.70 STIRRUPS @ 200 mm C/C
1000 TH. SAND LAYER COMPACTED & LAID OF 0.70 RELATIVE DENSITY 1000 TH. SAND LAYER COMPACTED & LAID OF 0.70 RELATIVE DENSITY RL 54.55 1.0 M THICK SAND LAYER RL 54.55 1.0 M THICK SAND LAYER
150 TH. C.C. IN M:10 150 TH. C.C. IN M:10 1000 TH. SAND LAYER COMPACTED & LAID OF 150 TH. P.C.C. 1000 TH. SAND LAYER COMPACTED & LAID OF 150 TH. P.C.C.
Y 0.70 RELATIVE DENSITY (M-10) 0.70 RELATIVE DENSITY (M-10)
ELEVATION 22000
CROSS SECTION : "Y-Y" CROSS SECTION : "Y-Y"
SPAN-1 SPAN- 2 SPAN-3 SPAN-9 SPAN-10 SPAN-11
25Ø @ 200 C/C (MAIN 25Ø @ 125 C/C FOR LENGTH 25Ø @ 200 C/C (MAIN 25Ø @ 125 C/C FOR LENGTH
REINFORCEMENT) OF BLOCK OUT ONLY REINFORCEMENT) OF BLOCK OUT ONLY
16Ø @ 250 C/C (DIS.RING 100 CLEAR COVER. 100 CLEAR COVER.
16Ø @ 250 C/C (DIS.RING
CREST R. L. : 64.12 m CREST R. L. : 64.12 m BARS) WEIR BARS) WEIR
(OVERALL LENGTH OF PIER/WIDTH OF R.C.C. RAFT) (OVERALL LENGTH OF PIER/WIDTH OF R.C.C. RAFT)
REINFORCEMENT DETAILS OF INTERMEDIATE PIER SECTION REINFORCEMENT DETAILS OF END PIER SECTION
U/S FLOOR APPRON R.L 61.50 M U/S FLOOR APPRON R.L. 61.50 M
NOTE : GENERAL DATA:-
Y 1. THIS DRAWING IS INTENDED SOLELY FOR PRELIMINARY ESTIMATE PURPOSE ONLY AND SHALL 1 GATE SIZE & No. 18.288m X 4.877m - 11 No. 60 ft X 16 ft - 11 No.
PLAN NOT BE USED AS THE BASIS FOR EXECUTION OR IMPLEMENTATION.
2 PIER THICKNESS 2.50m
2. DETAILS LIKE LEVEL, SIZE ETC. OF PIER & RAFT SECTION SHOWN IN THIS DRAWING ARE
3 SIZE OF RAFT FOUNDATION 231.168 m X 22.00 m X 2.80 m Th.
TENTATIVE ONLY, REQUIRED MINIMUM SBC/ABP VALUE 30 T/M2 WITH 75 mm SETTLEMENT FOR
ABOVE TENTATIVE SECTION WHICH MAY BE REVIEWED AFTER PERFORMING DETAIL DESIGN. 4 FOUNDATION LEVEL OF RAFT 55.70 m
3. THE SIZE AND LEVELS OF RAFT/PIER SECTION SHOWN IN THIS DRAWING ARE NOT FINAL, IT IS 5 TOP OF RAFT 58.50 m
PURELY FOR GENERAL ARRANGEMENT ONLY. TYPE OF FOUNDATION MAY BE CHANGE ACCORDING THIS DRAWING IS ACCOMPANIMENTS TO THIS OFFICE'S LETTER
6 CREST LEVEL 64.12 m
TO ACTUALLY ACHIEVED SBC/ABP VALUE AT SITE. NO.CDO/C/MADHAVGADH BARRAGE/ 144 Dt.04/10/2023
4. ALL DIMENSIONS ARE IN mm AND RLs IN METER.
PROPOSED MADHAVGADH BARRAGE
5. DIMENSIONS ARE TO BE READ ONLY AND NOT TO BE SCALED.
H.F.L. (10% GATES IN GENERAL ARRANGEMENT DRAWING OF PIER & RAFT FOUNDATION
6. IF ANY DISCREPANCY IS FOUND, THE SAME SHALL BE RECTIFIED IN CONSULTATION WITH 9 80.14 m (V.GATE SIZE: 18.288m X 4.877m (60' X 16') - 11Nos.)
INOPERATIVE CONDITION)
CONCERNED AUTHOROTY/OFFICE. 10 PIER TOP R.L. 87.00 m DRG. No. B/MADHAVGADH BARRAGE/RAFT/REVISION-0/ 1 DTD. 04/10/2023
FOR PRELIMINARY ESTIMATE PURPOSE ONLY PLATE-4/4
88.00 30cm thick Rubble pitching
87.00 30cm thick Rubble pitching
86.00 Existing Bank R.L over 20cm thick gravel layer .
Existing Bank R.L
. over 20cm thick sand layer over 20cm thick gravel layer Grass Turfing
84.00 over 20cm thick sand layer
83.00 2.5 Existing Bank Profile 2.5
79.00 Rain Water Collecting drain to 600 2.5 Existing Bank Profile 1
78.00 be drained into river beyond 1 River Side 2.5 600 Rain Water Collecting drain to
77.00 bank protection safely 5000 River Side 1 be drained into river beyond
R.L. 75.50m bank protection safely
73.00 New Bank Profile
72.00 1 New Bank Profile
71.00 Bank Toe line to be varied as
70.00 per existing bank profile
68.00 size Gabion
Bank Toe line to be varied as 1mx1mx1m R.L. 68.50m
67.00 per existing bank profile size Gabion
62.00 20cm thick selected excavated stuff R.L. 61.50 m Trimmed G.L. Line
61.00 Trimmed G.L. Line R.L. 61.50 m
material layer is to be laid over Nonwoven 20cm thick selected excavated stuff
Geofabric Weighing more than 235 gm/m2 material layer is to be laid over Nonwoven
58.00 Geofabric Weighing more than 235 gm/m2
Reduced Level (m) Reduced Level (m)
Reduced Distance (m) Reduced Distance (m)
TYPICAL CROSS SECTION OF MADHAVGADH BARRAGE GUIDE BANK - U/S LEFT SIDE@ CH. 120.0M TYPICAL CROSS SECTION OF MADHAVGADH BARRAGE GUIDE BANK - U/S RIGHT SIDE @ CH. 120.0M
86.00 Existing Bank R.L
. 30cm thick Rubble pitching
85.00 Grass Turfing
over 20cm thick gravel layer
84.00 30cm thick Rubble pitching
83.00 2.5 over 20cm thick sand layer
over 20cm thick gravel layer
81.00 over 20cm thick sand layer Existing Bank R.L.
4000 Existing Bank Profile
80.00 R.L. 79.50m Existing Bank Profile R.L. 79.50m
1 2.5 River Side 1
1 River Side 1 Rain Water Collecting drain to
77.00 Rain Water Collecting drain to 600 5000 5000 600
76.00 be drained into river beyond 1000 R.L. 75.50m R.L. 75.50m 1000 be drained into river beyond
75.00 bank protection safely bank protection safely
74.00 New Bank Profile New Bank Profile
71.00 Bank Toe line to be varied as Bank Toe line to be varied as
70.00 per existing bank profile per existing bank profile
67.00 size Gabion
63.00 20cm thick selected excavated stuff
Trimmed G.L. Line
62.00 R.L. 61.50 m Trimmed G.L. Line R.L. 61.50 m material layer is to be laid over Nonwoven
61.00 20cm thick selected excavated stuff
material layer is to be laid over Nonwoven Geofabric Weighing more than 235 gm/m2
59.00 Geofabric Weighing more than 235 gm/m2
Reduced Level (m) Reduced Level (m)
Reduced Distance (m) Reduced Distance (m)
TYPICAL CROSS SECTION OF MADHAVGADH BARRAGE GUIDE BANK - D/S LEFT SIDE @ CH. 180.0M TYPICAL CROSS SECTION OF MADHAVGADH BARRAGE GUIDE BANK - D/S RIGHT SIDE @ CH. 180.0M
1. THIS DRAWING IS INTENDED SOLELY FOR PRELIMINARY ESTIMATE PURPOSE ONLY & SHALL NOT BE USED AS THE BASIS FOR ANY EXECUTION OR IMPLEMENTATION.
2. EXISTING U/S & D/S NATURAL BANK SLOPES ON THE LEFT & RIGHT BANK SHALL BE TRIMMED TO ACHIEVE THE SLOPE OF 2.5(H):1(V) & TOP OF BANK AS SHOWN IN THE TYPICAL DRAWINGS.
3. IN ACCORDANCE WITH THE STIPULATIONS OUTLINED IN IS: 10751-1994 "PLANNING AND DESIGN OF GUIDE BANKS FOR ALLUVIAL RIVER-GUIDE LINES" CL. 4.5.1,4.5.2 & 4.5.3, IT IS MANDATED THAT THE
UPSTREAM(1L) AND DOWNSTREAM(0.4L) BANK PROTECTION WORKS BE CONSTRUCTED TO LENGTHS OF 1L≈250m AND 0.4L≈150m RESPECTIVELY. HOWEVER, IT IS IMPERATIVE TO ACKNOWLEDGE THAT DEVIATIONS
FROM THESE PRESCRIBED LENGTHS MAY BE NECESSITATED BY THE ACTUAL CONDITIONS OBSERVED ON-SITE AND AS PER MODEL STUDY RESULTS, THEREBY WARRANTING POTENTIAL EXTENSIONS AS DEEMED
4. THE DEPICTED SECTIONAL DETAILS OF BOTH U/S & D/S BANK PROTECTION ON BOTH SIDES PRESENTED TYPICALLY ALIGNING WITH THE ACTUAL GROUND LEVELS AND TOE LINES OF THE BANK. THESE DETAILS HAVE
BEEN PROVIDED IN ACCORDANCE WITH S.E. AIPC's LETTER DATED: 18/07/2023.
5. THE TOP OF U/S & D/S BANK PROTECTION IS SUGGESTED TENTATIVE AS SHOWN IN DRAWING, WHICH SHALL BE ASCERTAINED BY DETAILED HYDROLOGICAL STUDY AND PHYSICAL MODEL STUDY.
6. 15.0m WIDE LAUNCHING APRON WITH GABION KEY OF 1.0m DEPTH SUGGESTED AT THE RIVER BED LEVEL FOR DOWNSTREAM GUIDE BANKS OF BOTH SIDES AND 13.0m WIDE LAUNCHING APRON WITH GABION KEY
OF 1.0m DEPTH SUGGESTED AT THE RIVER BED LEVEL FOR UPSTREAM GUIDE BANKS OF BOTH SIDES AS SHOWN IN DRAWINGS.
7. PROPER DRAINAGE ARRANGEMENT SHALL BE REQUIRED TO DRAIN THE RAIN WATER SAFELY AWAY FROM THE PROPOSED PROTECTION WORK INTO THE RIVER.
8. DRY DENSITY OF GABION SHOULD BE MORE THAN 1650 kg/m3. GABION SHOULD BE MADE UP FROM ZINC+PVC COATED WIRE.
9. 20cm THICK SELECTED EXCAVATED STUFF MATERIAL LAYER IS TO BE LAID OVER NONWOVEN GEOFABRIC BEFORE LAYING OF GABION TO PREVENT THE MECHANICAL RUPTURE OF THE FABRIC BY GABION STONES.
THE WEIGHT OF NONWOVEN GEOFABRIC SHOULD BE MORE THAN 235 g/m2.
10. THE TYPICAL CROSS SECTION OF GUIDE BANK SHALL BE REVIEWED BY PERFORMING THE STABILITY ANALYSIS BASED ON DETAIL SOIL INVESTIGATION RESULT OF EXISTING BANK AS PER PREVAILING INDIAN
11. THE PROPOSED LEFT & RIGHT SIDE BANK PROTECTION WORKS SHALL BE ANCHORED ON BOTH ENDS WITH SMOOTH TRANSITION AND PROPER WRAP AROUND INTO EXISTING BANK WITH RESPECT TO THE LEVEL
OF PROPOSED BANK TOP R.L.
12. THESE CROSS SECTIONS ARE REPRODUCED FROM THE CROSS SECTIONS FURNISHED BY S.E., AIPC OFFICE'S LETTER DATED: 18/07/2023.
ACCOMPANIMENT TO THIS OFFICE VENACULAR LETTER NO.
13. THESE TYPICAL CROSS SECTIONS SHOULD BE CHECKED FOR THE BANKS OF PROPOSED LENGTH AT DIFFERENT CHAINAGE & CONFIRMED AS PER ACTUAL SITE CONDITION CDO/C/MADHAVGADH BARRAGE/144 DATED: 04/10/2023
14. THIS DRAWING HAS BEEN PREPARED BASED ON PRELIMINARY DATA ONLY & DETAIL ANALYSIS WAS NOT CARRIED OUT. FUTURE REVISIONS ARE LIKELY TO OCCUR AFTER THOROUGH ANALYSIS IS PERFORMED.
15. THIS DRAWING IS NOT TO SCALE. NO DIMENSIONS SHOULD BE MEASURED DIRECTLY FROM THE DRAWING. GENERAL ARRANGEMENT DRAWING
16. ALL DIMENSIONS ARE IN 'mm' AND ALL RL's ARE IN 'm'.
SHOWING DETAILS OF U/S AND D/S GUIDE BANKS OF
DETAILS OF U/S AND D/S GUIDE BANK PROTECTION WORK FOR MADHAVGADH BARRAGE MADHAVGADH BARRAGE
VILLAGE: AMBOD(MADHAVGADH) DIST. GANDHINAGAR
Image © 2025 Airbus 8 km
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.0 Vol-1 RAJPUR SBD.pdf
2.0 (Vol-II) Part-A- Section-A General.pdf
3.0 (Vol-II) Part-A- Section-B Particular.pdf
4.0 (Vol-II) Part-A- Section-C Design.pdf
5.0 (Vol-II) Part-B- Mechanical Works.pdf
6.0 (Vol-II) Part-C- Electrical Works.pdf
7.0 (Vol-II) Part-D- Operation and Maintance.pdf
8.0 (Vol-IV) Encl-II Tender Drawing (Typical)..pdf
9.0 ENCLOSURE-III (Vol-III) Price Schedule.pdf
10 QC TEST.pdf
Pre Bid Clarification Rajpur Barrage.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .