Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
9 Jul 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District officer soil and water conservation Divis
District officer soil and water conservation Division Baramulla/Bandipora
UP-GRADATION OF WATER BODY UNDER UT CAPEX BUDGET AT WANPORA S-4 RAFIABAD Dist. Baramulla
2022_SWCD_177105_2
e- NIT NO (Retender) 07 OF 2022-23DATED 01/07/2
Open Tender
Civil Works
Item Rate
30 days
UP-GRADATION OF WATER BODY UNDER UT CAPEX BUDGET A
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
District officer soil and water conservation Divis
₹8,000
Yes
12 Jul 2022
1 Jul 2022
12 Jul 2022
1 Jul 2022
9 Jul 2022
1 Jul 2022
UP-GRADATION OF WATER BODY UNDER UT CAPEX BUDGET AT (WANPORA S-4 RAFIABAD) Dist. Baramulla
Silt clearance from canals/ ponds. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) wet 50’-0”x50’-0”x 1’-9”(avg)= 4375cft or 123.9 cum
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil 2x(50’-0”+44’-0”)x3’-0”x2’-0”=1128cft or 31.94 cum
Providing and laying soling stone in horizontal including ramming ,watering but excluding cost of stones complete Qtty = 564sft x6”= 282cft or 7.98 cum
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with a) 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Qtty vide (3) = 564sft x 4” = 186.12cft or 5.27 cum
Dry random rubble masonry with hard stone in foundation and plinth: With bond stone 2x(50’-0”+47’-0”)x(1’-6”+3’-0”)/2x 6’-0”=2619 cft or 74.17 cum @ 60% = 44.5cum
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level andcuring complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand using nallah stones( kuccha/pacca) Qtty = 74.17 cum @ 40% = 29.66cum
Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete 194 rftx1’-6”= 291sft or 27.04sqm
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete 2x(40’-0”+27’-0”)x 1’-6”= 201sft or 8.68sqm (33’-0”x23’-0”) =759sft or 70.53sqm Steps = 8’-0”x8’-0’= 64sft or 5.94sqm , Cistern =2x3’-0”x3’-0”= 9sft or 0.83sqm = 1x5’-0”x5’-0”= 25sft or 2.32sqm T = 88.3sqm
Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 100 mm dia. nominal bore(15mtr )
Carriage of different materials from source to site of work a)sand/ bajri average lead of 28km by MT & 200m HL Qtty vide (4,6,7) = (5.27+29.66+27.04)= 16.34cum
b) stone average 35km by MT & 200m HL
Qtty vide (3,5,6,)= 82.15 cum
GHULAM MOHAMMAD MAGREY
M/S Showkat Ahmad Sofi
ABDUL LATIEF NAIKOO
MOHAMMAD YOUSF KHAN
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .