Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹3.4 L+₹1,376.90 (0.41%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Jithin K M L2 | Shinekumar L1 |
|---|---|---|---|---|---|
| 1.00EDA BUND | |||||
| 1.00 | OD112121/2026-2027:Hire and labour charges for Arecanut post and wailing piece in digging,conveyance etc.complete and removing the same after use | 560 | RM | 90.51 ₹50,685.6 | 90.14 ₹50,478.4 Lowest |
| 1.00 | OD112120/2026-2027:Hire and labour charges for supplying at site full arecanut post of length specified by deptl, officers | 270 | RM | 43.04 ₹11,620.8 | 42.86 ₹11,572.2 Lowest |
| 1.00 | OD171876/2026-2027:Engaging earth excavator including all charges | 14 | hour | 1,342.23 ₹18,791.22 | 1,336.86 ₹18,716.04 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 19.12 | cum | 257.63 ₹4,924.86 | 256.59 ₹4,904.97 Lowest |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 110 | sqm | 18.19 ₹2,000.9 | 18.11 ₹1,992.1 Lowest |
| 1.01 | OD112117/2026-2027:Screening with double 1/2 split arecanut reepers 50cm both ways and tying with coir etc. including removing after use | 197.6 | sqm | 95.86 ₹18,941.94 | 95.47 ₹18,864.87 Lowest |
| 1.01 | OD112118/2026-2027:Thambakam wood wrought and put up for shutter planks cost | 3,924 | cud m | 31.09 ₹1,21,997.16 | 30.96 ₹1,21,487.04 Lowest |
| 1.01 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 158.12 | cum | 445.71 ₹70,475.67 | 443.92 ₹70,192.63 Lowest |
| 1.01 | OD112119/2026-2027:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent,testing of Joints complete as per direction of engineer in charge.Using 250 mm dia 64Kgf/cm2 ISI quality PVC pipe excluding cost of trenching & filling | 14 | metre | 2,624.39 ₹36,741.46 | 2,613.89 ₹36,594.46 Lowest |
Tender Value
₹3.4 L
EMD Value
₹8,404
Closing Date
18 Sept 2026, 2:00 pmClosed
AE LID EW
LID EW
163/PVK/26-27 - BUND CONSTRUCTION IN VARIOUS WARDS TO PREVENT SALTWATER INTRUSION
2026_LSGD_868902_1
2208/AE/LSGD/PVK/26-27
Open Tender
Civil Works - Roads
Item Rate
PUTHENVELIKKARA
Please refer Tender documents.
10 documents required · 10 mandatory
₹745
Yes
₹8,404
Yes
22 Sept 2026
10 Sept 2026
19 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EDA BUND | |||||
| 1.001 | OD112121/2026-2027:Hire and labour charges for Arecanut post and wailing piece in digging,conveyance etc.complete and removing the same after use | 560 | RM | - | - |
| 1.002 | OD112120/2026-2027:Hire and labour charges for supplying at site full arecanut post of length specified by deptl, officers | 270 | RM | - | - |
| 1.003 | OD171876/2026-2027:Engaging earth excavator including all charges | 14 | hour | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 19.12 | cum | - | - |
| 1.005 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 110 | sqm | - | - |
| 1.006 | OD112117/2026-2027:Screening with double 1/2 split arecanut reepers 50cm both ways and tying with coir etc. including removing after use | 197.6 | sqm | - | - |
| 1.007 | OD112118/2026-2027:Thambakam wood wrought and put up for shutter planks cost | 3,924 | cud m | - | - |
| 1.008 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 158.12 | cum | - | - |
| 1.009 | OD112119/2026-2027:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent,testing of Joints complete as per direction of engineer in charge.Using 250 mm dia 64Kgf/cm2 ISI quality PVC pipe excluding cost of trenching & filling | 14 | metre | - | - |
stage.html
html • 0.02 MB
finance_1471727.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.79 MB
BOQ_1471727.xls
BOQ • 0.30 MB
OPENEDTENDER.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .