| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAccepted-AOC NAYABASTI KAJI PARA ROAD PO BARRACKPORE DIST 24 PARGANAS NORTH WEST BENGAL | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹36.4 L+₹1.7 L (4.85%)Rejected-Finance | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹36.8 L+₹2.2 L (6.21%)Rejected-Finance | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹39.0 L+₹4.4 L (12.6%)Rejected-Finance 14 WEST BARASAT ROAD LALKUTHI P O BARRACKPORE DIST 24 PARGANAS NORTH KOLKATA 700 120 WB | KOLKATA | 24 PARGANAS NORTH | WEST BENGAL | 700120 | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹39.5 L+₹4.8 L (13.9%)Rejected-Finance | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | RAJ TRANCON L4 | B G Trading Co. L5 | BANERJEE ENTERPRISE L3 | M/S. NAYABASTI CONSTRUCTION and SUPPLY SYNDICATE L1 | DAS ENTERPRISE L7 | N S CONSTRUCTION L2 | M/S RAJESH TRADING CO L6 | SWAPAN CONSTRUCTION L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down chowkats with shutters (without taking off shutter from the frames) not exceeding 1.50 Sqm each complete all as specified and directed. | 25 | EACH | 500 ₹12,500 | 200 ₹5,000 Lowest | 332 ₹8,300 | 280 ₹7,000 | 290 ₹7,250 | 310 ₹7,750 | 333 ₹8,325 | 346 ₹8,650 |
| 2.00 | Taking down chowkats with shutters (without taking off shutter from the frames) exceeding 1.50 Sqm but not exceeding 4.00 Sqm each complete all as specified and directed.
(Note for Item No. 1.00 & 2.00 - Rate shall be deemed to be include for cutting holes/demolition of masionry walls etc for taking down chowkats and making good the damaged surfaces). | 10 | EACH | 700 ₹7,000 | 200 ₹2,000 Lowest | 367 ₹3,670 | 350 ₹3,500 | 360 ₹3,600 | 365 ₹3,650 | 414 ₹4,140 | 430 ₹4,300 |
| 3.00 | Taking down shutters any type not exceeding 1.00 Sqm and removing from site complete all as specified and directed. | 15 | PER LEAF | 200 ₹3,000 | 125 ₹1,875 | 68 ₹1,020 | 60 ₹900 | 85 ₹1,275 | 59 ₹885 Lowest | 97 ₹1,455 | 101.66 ₹1,524.9 |
| 4.00 | Taking down of shutter of any description exceeding 1 Sqm but not exceeding 2.0 Sqm each complete all as specified and directed. | 8 | PER LEAF | 250 ₹2,000 | 175 ₹1,400 | 85 ₹680 | 80 ₹640 | 90 ₹720 | 78 ₹624 Lowest | 103 ₹824 | 107 ₹856 |
| 5.00 | Taking down of shutters of any description exceeding 1 Sqm but not exceeding 2 Sqm each and refixing in same opening after easing and adjusting completed all as specified and directed. | 5 | PER LEAF | 600 ₹3,000 | 175 ₹875 Lowest | 449 ₹2,245 | 450 ₹2,250 | 465 ₹2,325 | 475 ₹2,375 | 534 ₹2,670 | 556 ₹2,780 |
| 6.00 | Demolition of cement concrete (unreinforced) as in ground floors or paving no exceeding 15cm thick below or above ground level complete all as specified and directed. | 62.45 | CUM | 300 ₹18,735 Lowest | 800 ₹49,960 | 1,352 ₹84,432.4 | 1,250 ₹78,062.5 | 1,265 ₹78,999.25 | 1,310 ₹81,809.5 | 1,454 ₹90,802.3 | 1,512 ₹94,424.4 |
| 7.00 | Demolition of unreinforced cement concrete of any description and in any position not otherwise specially provided for complete all as specified and directed. | 4 | CUM | 400 ₹1,600 Lowest | 1,200 ₹4,800 | 1,385 ₹5,540 | 1,350 ₹5,400 | 1,360 ₹5,440 | 1,375 ₹5,500 | 1,564 ₹6,256 | 1,626.56 ₹6,506.24 |
| 8.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillar etc but excluding ashlars facing dressed stonework & precast concrete articles complete all as specified and directed. | 19 | CUM | 350 ₹6,650 Lowest | 900 ₹17,100 | 1,320 ₹25,080 | 1,250 ₹23,750 | 1,265 ₹24,035 | 1,300 ₹24,700 | 1,454 ₹27,626 | 1,512.94 ₹28,745.86 |
| 9.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 270 | SQM | 80 ₹21,600 | 70 ₹18,900 Lowest | 100 ₹27,000 | 90 ₹24,300 | 95 ₹25,650 | 98 ₹26,460 | 109 ₹29,430 | 113 ₹30,510 |
| 10.00 | Dismantling wall and ceiling boards (fibre, pulp, insulation etc) or insulation boards/slabs/blankets, any thickness including cover fillet complete all as specified and directed. | 182 | SQM | 50 ₹9,100 | 70 ₹12,740 | 40 ₹7,280 | 35 ₹6,370 Lowest | 45 ₹8,190 | 36 ₹6,552 | 51.75 ₹9,418.5 | 53 ₹9,646 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
23 Aug 2025, 6:00 pmClosed
GE BARRACKPORE
Office of the GE BARRACKPORE, KOLKATA - 700120
REPAIR TO ROOFS, FLOORING, PLINTH PROTECTION, JOINERY, PLUMBING, PLASTERING, TILING, WATER TANK CLEANING, ETC AND CONNECTING ITEMS TO OTM ACCN OF ASC SUP COY, BASE HOSP, CWE(S) AND GE OFFICE, MES QTRS, ECHS, ARO, AALC, NCC AT BARRACKPORE CANTT UNDER
2025_MES_722146_1
8137/E8
Open Tender
Civil Works
Item Rate
180 days
Barrackpore
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹500
GE BARRACKPORE
₹70,000
Yes
20 Nov 2025
23 Jul 2025
25 Aug 2025
23 Jul 2025
23 Aug 2025
6 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .