Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC First lowest bid | |
| 2 | L2₹6.3 L+₹27,105.15 (4.53%)Rejected-AOC | L2 | Rejected-AOC Second Lowest Bid | |
| 3 | L3₹6.4 L+₹38,193.33 (6.39%)Rejected-AOC | L3 | Rejected-AOC Third Lowest Bid | |
| 4 | L4₹7.0 L+₹1.0 L (17.4%)Rejected-AOC | L4 | Rejected-AOC Fourth lowdest bid |
Tender Value
₹7.5 L
EMD Value
₹18,739
Closing Date
3 Jan 2023, 4:00 pmClosed
Regional Engineer
Kerala State Nirmithi Kendra NHEC Barton hill Vanchiyoor P O Thiruvananthapuram Ph No 9656360256
civil works
2022_KSNK_542877_1
KSNK/TECH/NHEC/ SDM-266/2022
Open Tender
Civil Works - Buildings
Item Rate
60 days
Nanthancodu Thiruvananthapuram
REFER NIT
6 documents required · 6 mandatory
₹1,499
₹18,739
Yes
3 Feb 2023
23 Dec 2022
5 Jan 2023
23 Dec 2022
3 Jan 2023
23 Dec 2022
23 Dec 2022 - 3 Jan 2023
Amount
CIVIL WORKS
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 MM NOMINAL SIZE
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.7.2 12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1 Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
SHIBU K
DEEPU RADHAKRISHNAN
MANIKUTTAN
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .