Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹4,900
Closing Date
24 Aug 2026, 6:00 pmDue today
Executive Engineer Rew Division samba
Executive Engineer Rew Division samba
Refer As Per BOQ
2026_RDPR_321101_55
73 REW Samba of 2026-27 Dated-17-08-2026
Open Tender
Civil Works
Percentage
30 days
Bari Brahmana
Tendered document
3 documents required · 3 mandatory
₹600
Executive Engineer REW Division Samba
₹4,900
17 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal | 371.6 | sqm | 12.49 | ₹4,641.28 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 178.9 | cum | 256.85 | ₹45,950.47 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 16.6 | cum | 479.3 | ₹7,956.38 |
| 4 | P/L of C.Conc mix 1:5:10 using 40mm size agg. | 2.21 | cum | 4,826.5 | ₹10,666.57 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 17.38 | cum | 5,733.6 | ₹99,649.97 |
| 6 | stone filling @ 20% | 7.45 | cum | 700 | ₹5,215 |
| 7 | Cetring and shuttering including strutting, propping etc and removal of the form work for: | 72.5 | sqm | 286.35 | ₹20,760.38 |
| 8 | Dry stone pitching (any thickness) excluding cost of stones on Slopes | 2.65 | cum | 693.95 | ₹1,838.97 |
| 9 | White washing with lime to give an even shade on New Work | 120.8 | sqm | 29.95 | ₹3,617.96 |
| 10 | P/L of 12mm thk C.sand Plaster 1:6 mix | 120.77 | sqm | 266.2 | ₹32,148.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.00 MB
BOQ_1071003.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].