Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC | ₹11.1 L | L1 | Accepted-AOC greement No 06/EE/2026-27 |
| 2 | L2₹11.1 L+₹2,854.02 (0.26%)Rejected-Finance | ₹11.1 L+₹2,854.02 (0.26%) | L2 | Rejected-Finance L2 In Financial Bid |
| 3 | L3₹11.1 L+₹3,437.14 (0.31%)Rejected-Finance | ₹11.1 L+₹3,437.14 (0.31%) | L3 | Rejected-Finance L3 In Financial Bid |
| Sl No | Description | Qty | Unit | SS BUILDERS AND CONSULTANT L3 | BASERA DEVELOPERS L2 | M/S RAJAN BUILDERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation in ordinary soil for structure i/c all lead and reqd. lifts as per site requirement and with proper disposal of excavated earth as per directed by engineer in charge for proper completion of work. | 119.32 | Cum. | 64 ₹7,636.22 | 64 ₹7,636.22 | 63 ₹7,516.91 Lowest |
| 2.00 | Earth work in filling in ordinary soil including ramming and dressing the surface upto required level and slope lead up to 30m and lift up to 1.5m and carriage 600 Km. Including power transport ie. cost of all labour, T&P etc. complete. | 914.59 | Cum. | 196 ₹1,79,260.03 | 196 ₹1,79,260.03 | 195 ₹1,78,345.44 Lowest |
| 3.00 | Centering and shuttering for form work I/c all cost of labour and T&P etc for complete for proper completion of work. | 17.64 | Sqm. | 244 ₹4,304.16 | 243 ₹4,286.52 | 242 ₹4,268.88 Lowest |
| 4.00 | Centering and shuttering for R.C.Cwork I/c all cost of labour and T&P etc for complete for proper completion of work. | 35.95 | Sqm. | 683 ₹24,556.58 | 682 ₹24,520.63 | 681 ₹24,484.67 Lowest |
| 5.00 | Cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including cost of all material, labour T&P etc complete for proper completion of work. | 1.12 | MT | 97,200 ₹1,08,766.8 | 97,111 ₹1,08,667.21 | 97,100 ₹1,08,654.9 Lowest |
| 6.00 | Cement concrete in (1:3:6) mix with cement, coarse sand , stone grit including cost of all material, labour T&P, mechanical mixing, curing etc complete for proper completion of work. | 13.01 | Cum. | 6,210 ₹80,761.05 | 6,210 ₹80,761.05 | 6,200 ₹80,631 Lowest |
| 7.00 | Laying C.C in M-20 (1:2:4) with cement,coarse sand & crushed stone ballast inccluding coasts of all material labour, mechanical vibration & mixing T&P complete. | 9.95 | Cum. | 6,630 ₹65,975.13 | 6,628 ₹65,955.23 | 6,625 ₹65,925.38 Lowest |
| 8.00 | R.C.C M-20 (1:1.5:3) with cement, coarse sand & crushed stone ballast including cost of all material, labour, mechanical vibration & mixing T&P etc. complete. | 12.39 | Cum. | 7,210 ₹89,339.11 | 7,210 ₹89,339.11 | 7,200 ₹89,215.2 Lowest |
| 9.00 | First class B/W in 1:4 cement coarse sand, mortar i/c cost of all material, labour T&P etc. complete for proper completion of work. | 54.05 | Cum. | 5,410 ₹2,92,405.09 | 5,410 ₹2,92,405.09 | 5,400 ₹2,91,864.6 Lowest |
| 10.00 | Struck pointing in 1:2 cement mortar including cost of all material, labour, T&P, curing etc. complete for proper completion of work | 43.23 | Sqm. | 103 ₹4,452.69 | 104 ₹4,495.92 | 102 ₹4,409.46 Lowest |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
30 May 2026, 12:00 pmClosed
E.E
MGCCD-3 Amroha
LOT 05 CONSTRUCTION D.R.B AT K.M. 13.800 OF GOVERDHANPUR DY. M.G.C. STAGE II
2026_UPIDC_1151892_5
01/EE2026-27
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹23,000
18 Jul 2026
25 May 2026
30 May 2026
25 May 2026
30 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation in ordinary soil for structure i/c all lead and reqd. lifts as per site requirement and with proper disposal of excavated earth as per directed by engineer in charge for proper completion of work. | 0.4 | Cum. | - | - |
| 2 | Earth work in filling in ordinary soil including ramming and dressing the surface upto required level and slope lead up to 30m and lift up to 1.5m and carriage 600 Km. Including power transport ie. cost of all labour, T&P etc. complete. | 0.8 | Cum. | - | - |
| 3 | Centering and shuttering for form work I/c all cost of labour and T&P etc for complete for proper completion of work. | - | Sqm. | - | - |
| 4 | Centering and shuttering for R.C.Cwork I/c all cost of labour and T&P etc for complete for proper completion of work. | - | Sqm. | - | - |
| 5 | Cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including cost of all material, labour T&P etc complete for proper completion of work. | - | MT | - | - |
| 6 | Cement concrete in (1:3:6) mix with cement, coarse sand , stone grit including cost of all material, labour T&P, mechanical mixing, curing etc complete for proper completion of work. | - | Cum. | - | - |
| 7 | Laying C.C in M-20 (1:2:4) with cement,coarse sand & crushed stone ballast inccluding coasts of all material labour, mechanical vibration & mixing T&P complete. | - | Cum. | - | - |
| 8 | R.C.C M-20 (1:1.5:3) with cement, coarse sand & crushed stone ballast including cost of all material, labour, mechanical vibration & mixing T&P etc. complete. | - | Cum. | - | - |
| 9 | First class B/W in 1:4 cement coarse sand, mortar i/c cost of all material, labour T&P etc. complete for proper completion of work. | 1 | Cum. | - | - |
| 10 | Struck pointing in 1:2 cement mortar including cost of all material, labour, T&P, curing etc. complete for proper completion of work | 1 | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.93 MB
lot05.pdf
Tender Documents • 2.98 MB
BOQ_2157816.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .