| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC | 1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | 2₹3.8 L+₹43,739 (12.9%)Rejected-AOC | 2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | THAMARASSERY LABOUR CONTRACT CO OPERATIVE SOCIETY L1 | RISHAD P M L2 |
|---|---|---|---|---|---|
| 1.00Retaining wall | |||||
| 1.00 | OD311277/2025-2026:Demolishing laterite masontry work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1.44 | cum | 1,503.98 ₹2,165.73 Lowest | 1,956.3 ₹2,817.07 |
| 1.00 | OD311275/2025-2026:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges: Dry rubble masonry. | 4.5 | cum | 999.78 ₹4,499.01 | 900.96 ₹4,054.32 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 18 | cum | 236.63 ₹4,259.34 Lowest | 236.63 ₹4,259.34 Lowest |
| 1.00 | OD311276/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with departmental rubble including packing to compactness to lines and levels and labour charges etc. complete as per direction of Departmental officers at site | 3.6 | cum | 1,641.71 ₹5,910.16 | 1,576.07 ₹5,673.85 Lowest |
| 1.00 | OD311278/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 52.58 | cum | 3,668.08 ₹1,92,849.31 Lowest | 4,500 ₹2,36,587.5 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 9.9 | sqm | 354.69 ₹3,511.43 Lowest | 354.69 ₹3,511.43 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 504 | kilogram | 103.2 ₹52,012.8 Lowest | 103.26 ₹52,043.04 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.64 | cum | 8,483.41 ₹73,296.66 Lowest | 8,483.41 ₹73,296.66 Lowest |
Tender Value
₹3.4 L
EMD Value
₹8,463
Closing Date
14 Oct 2025, 5:00 pmClosed
ASSISTANT ENGINEER
LID EW SECTION THAMARASSERY GP
KORANGAD GLPS GROUND COMPOUND WALL RENOVATION IN THAMARASSERY GP
2025_LSGD_805539_50
AE/LSGD/TSY/04/20225-26
Open Tender
Civil Works - Roads
Item Rate
THAMARASSERY
Please refer Tender documents.
7 documents required · 7 mandatory
₹750
Yes
₹8,463
Yes
15 Nov 2025
7 Oct 2025
15 Oct 2025
7 Oct 2025
14 Oct 2025
7 Oct 2025
Amount
Retaining wall
OD311277/2025-2026:Demolishing laterite masontry work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
OD311275/2025-2026:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges: Dry rubble masonry.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD311276/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with departmental rubble including packing to compactness to lines and levels and labour charges etc. complete as per direction of Departmental officers at site
OD311278/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
RISHAD P M (BID ID -2387748)
Bidder Name
THAMARASSERY LABOUR CONTRACT CO OPERATIVE SOCIETY
RISHAD P M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1343735.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .